Civil Supervisor Construction Jobs

Location:
Nilai, Negeri Sembilan, Malaysia
Salary:
RM5800
Posted:
May 30, 2023

Contact this candidate

Resume:

jhjhgmg

Site Civil Engineer/ Supervisor/ I.O.W

OBJECTIVE:

Civil & Structural industry. Strong input towards the job. Physically fit, verbal sound in communication, OSHA compliance, keep upgrading towards the industry needs. Monitoring civil construction projects.

Oversees activities such as bridge construction, repairing roads and highways, and doing construction on airport buildings & drainage, plant EPC's job. Most of the time is spent at sites to make sure all parties involved and performing well for the day task and achieve the day target.

EMAIL: adxeuj@r.postjobfree.com

Address: 2, Laluan Sungai Pari 15

Teluk Kurin, Buntong Ipoh

30100 Perak Malaysia

Phone: +601*-*******

Date of Birth: 29-10-1977

Nationality: Malaysian

Link: www.linkedin.com/in/jarrad-justin-

michael-741986123

TECHNICAL:

1. HSS Engineering project, the bridge

construction planks were cast at the

site. I was personally involved with

Pre-stressing wire rope Ø8mm which

yield strength 29.9 N/mm -35N/mm

calculated under M.S/ISO9001-2008.

2. Spun pile test: PDA evaluated bearing

capacity using transducer. In this case

most of the readings around 300mm-

450kN>, 600mm-1200kN>

3. Bore pile test: The hard layer were

tested using Point Load Test (PLT) is

conducted when hard layers

encountered while boring for the

bored piles being carried out. Design

specifications values of 1MPa>. When

a rock stratum is encountered, boring

carried out through it using a diamond

bit boring drill. The length of the

bored pile socketed in rock stratum is

referred to “rock socket length”

accordance to construction drawings.

4. Sonic logging to test for the integrity

of the concrete. 2% from the overall

piles.

5. First time doing the Statnamic Test

from regular MLT’s for the Bore pile

2xSWL 12000kN. The test lasted less

than 3min with loud explosive noise.

The settlement calculated from the

impact. The maximum allowable

remaining the same standard

application 25mm.

NAME: Jarrad Justin MICHAEL

EXPERIENCE:

Johor Malaysia

September 2017- August 2020

HSS Engineering Malaysia (Consultant)

Inspector of Work

Summary:

Total 3 bridge span involved series of pier columns. My duty at B1-383m & B2-371m. The last one is 2.2km. The ground at rural plantations palm oil area contain of peat soil to marine clay joining at Sg Pulai JOHOR which located in between of Kukup/Tg Bin and Tg Pelepas Port. Total cost RM640mil. Client is SEAPORT / MMC Berhad with subcontractor CHEC

(M) SDN BHD.

The total length of the bridge: 7.4km

Dual carriageway with span 22.5 meter

Marine clearance from the water: Vertical Clearance: 25m (3rd Bridge)

Horizontal /Navigational Clearance: 100m

(Center part of Bridge 3 only@ PIER 19 & PIER 20) Site Inspector: monitoring the daily output example: Inspect the excavation depth, ready for the pile cap work, rebar, formwork, concrete, etc. In bridge construction, if the site falls close to the river stream, sea, or even lakes, there will be an involvement marine protection act installing silt curtain, fence, and buoy. Depending on the site require a temporary bridge. Other administrative can be from daily site diary record, attending meetings, site discussions in related to any sudden changes in design to suit to the site condition.

B1- 383m

Abutment A 680 piles- B 840 piles construction using 300mm ICP spun piles G90 at depth range from 33m pile length

Continue with series of pier columns P1-P11@600mm spun piles Left/Right 6piling points per pile caps/31-42m in depth. Continue 850m square column until crosshead using HT20-HT40.

P12-P16 bore pile Ø1000mm@12points at depth of 42-52m.Continue with column size at Ø2m. Sheet pile installation with an interlocking system is needed at this stage. Minimum length 24m.

P13-P34@Ø600mm spun piles. The maximum depth pile penetration around 46m.

Precast planks being used at spun pile columns expect the main crossings T-Beam 10no’s @30m, 40m &30m respectively. All spun piles driven to refusal length. B2-371m

Abutment A 480 piles- B 740 piles construction using 300mm ICP spun piles G90 at a depth range from 33m pile length. Some piling points required additional piles due to deviation from actual location. This is because of shear strength failure during strong tidal.

P1-P11 @600mm spun piles Left/Right 6piling points per pile cap/ 35m-44m. PDA test being carried out. 2xSWL 1200kN. Most of the piles exceed the requirement.

P12-P15 Bore pile Ø1000mm@ 12points. The penetration ranging from 44m-54m in length.

Continue with series of spun piles P16-28@Ø600mm Left/Right.

P29-P30 a bore pile Ø1000mm@ 12points. (Water pipe crossing 35m east to west )

Abutment B 390 spun pile Ø300mm joining to B3.

RAPID Petronas - 2015

Foundation works for temporary workers camp

Water pipeline HDPE & Sewerage using electrofusion technology and CLMS pipes at Fire Hydrant connection.

Building & roads - involved in the foundation and field density, DCP, and Plate bearing test.

Ground improvement using HIEDYC DC compaction for foundation work. Given required strength kPa with residual settlement less than 25mm for next 5 years. EXTRA ACTIVITIES:

Jogging

Hiking

Long walk

LANGUAGES:

English:

Intermediate, IELTS band

6.5(expired). Re-take in September

2021

Malay:

Advanced reading & writing S.P.M

Deutsch:

Intermediate, Linguaphone certificates

Spore 1998

Tamil: Communication only

PROJALMA Sub-contractor 2014 & 2015

Precast bridge segments for flyover in Pasir Panjang Singapore @ Batu Gajah Ipoh.

Involved heavy reinforcement rebar. HT 16mm was the minimum size for the starter bar

Carriageway width 15m and weighing from 70ton-120ton

Some segments come together with a 1.5m walk path with a parapet wall separator which will involve cast in situ later stage.

QA/QC assessment required time to time at mould /finishing and joining part. This will subject to approval by site engineers before/after placing/ reinforcement re- bars. Dismantled from mould QC checks.

Curing pattern with water/sprinkles gunny sack placing EXTRA ACADEMIC:

Keep up with new engineering

drawing tools like learning

through You-Tube and other

resources available.

Self-learning from engineering

books mainly standard practice

BS/M.S/E.C involving

geotechnical and bridge

construction technology.

SKILLS:

Demonstrated ability to

implemented new projects with

initiative and open minded to

work in complex environment

projects.

Engineering drawing using auto-

cad latest version. Beginner in

Revit.

Advance thinking and able to

visualise type of work, plants,

manpower require to complete the

project or day task.

Team player as leadership,

communication and problem-

solving.

Interpret plans, update any simple

sketch to suit to the site with

approval from Senior Engineer

Ipoh Malaysia

January 2012- April 2016

Inflow Engineering Malaysia

Site Engineer/Site Agent

This firm initially doing a lot of sewerage treatment construction jobs for the new plant, services to the existing plant, plant up-grading. After the recession period, the company turn to slow down in everything where I was sent to other parenting companies to continue the engineering service with them. Those are listed below:- LUMUT Port - 2012 & 2013

Concrete water tank foundation involved heavy reinforcement 16-30mm in rebars / Concrete Grade 35-40.

Steel water tanks 4m x 4m x 6m

Tapah Perak Malaysia

May 2016- December 2016

LHOIST Malaysia

Civil Supervisor

An EPC project. Lime plant construction at Greenfield. I started during pilling work at building foundation big bag warehouse and power sub-station for 33kv. As a site supervisor, I handled:-

RFI's, Site Instruction, NCR punch list which record in excel sheet format and produce to manager on weekly basis.

Weekly coordination team and subcontractor meetings

Take full responsibility from spun pile driven up to completion at big bag warehouse Size: W: 120m x L: 380m. Spun piles 600mm. Piles driven to the length at 45m cut-off. Most piles set at below <40m. Although I am the in house work supervisor, I do checking on the sub-contractor installing the warehouse I Beam, H-Beam, etc.

Update the drawing to contractors immediately if any changes.

Fully safety awareness standard practice under the safety guidelines.

Site Inspection on daily work.

Perth Australia

January 2008- August 2008

BELMONT CITY COUNCIL

Casual Trainee Engineer

Understudy Senior drafting engineer. Doing design drafting for road construction.

Produce drawings using computer-assisted drafting systems (CAD) engineering tools. Review rough sketches, drawings, specifications, and other engineering data received from civil engineers to ensure that they conform to design concepts.

Explain drawings to construction teams and provide adjustments as necessary

Site visits during construction and understand the steps off work involved in road construction.

Perth Australia

September 2008- December 2009

CITY OF WANNEROO

Cadet Engineer

As a cadet engineer with the local council at the City of Wanneroo. During the period, involved in various fields. Most of it was understudy from a mentor or a senior engineer. Project Design 6months Engineering drawing, Estimate quantities cost of materials, equipment, or labour to determine project feasibility. Land & Development 3months - Land development is the process of acquiring

Undeveloped land (green land) and obtaining entitlements the right to build on it. Land development refers to altering the landscape in any number of ways, such as subdividing real estate into lots, typically for the purpose of building homes, or changing undeveloped landforms to construct commercial, industrial, or residential buildings

Project Construction 3months - On-site, supervisors and assistant supervisors assist with daily activities. They make decisions to ensure quality is optimized and budgets are maintained. Additionally, ensure all procedures are properly followed in technical expectation like the pavement strength according to AS standard using CBR value in high strength from 80-100% and D.C.P. Some areas also involve Mackintosh Probe's rough estimation for strength.

Asset Management 3months- Assess Building over Easement approvals, Storm-water

Points of Discharge, Public Lighting, and other engineering asset-related enquirers.

Taking counts on bus-stops, shelters, seats, rail guards, ramp at certain sections. ( these data's require for upgrading purpose )

Monument statue's around the city.

Vandalising area list down

Ipoh Perak Malaysia

March 2010- December 2011

Pembinaan Sinaran Anjung Malaysia

Site Agent

Direct involvement with water pipeline. Mostly government tender and carry out the job. I was on duty at the Royal City of Kuala Kangsar Perak. Laying HDPE pipeline. The welding method is an electrofusion system.

The technical output is typical tact welding application joined are cleaned, inserted into the electrofusion fitting with a temporary clamp if required and a voltage normally 40V is applied.

Checking pressure gauge test for the pressure bars. The fitters will advise according to plan and standard application 10bars is sufficient for housing.

Others at "S bend" when crossing drains.

Singapore

March 1995-November 1996

SATS (Singapore)

Warehouse / Operation Assistant

Cargo department with SATS.

Prepare documentation for clearance of all inbound shipments requiring formal entries and outbound shipments in accordance with customs and quarantine regulations.

Prepare cargos into the aircraft pallet PAP, PG, P1P, P6P, etc.

Dangerous shipments will go into separate container.

Expedite customs declaration efficiently and maximize customer satisfaction.

Overall responsible for the forwarding of freight from one place to another location/country.

REFERENCES:

Will provide upon request.

EDUCATION: Ireland

2020-On-going

MTU Ireland

BEng Civil & Environmental Engineering.

Due to pandemic classes conducted

through online using blackboard.

(I require to repeat 3 papers in 2021-

2022.)

COMPLETED

Perth Australia

Tafe College 2008-2009

Advanced Diploma in Civil & Structural

Engineering

Perth Australia

Tafe College 2007-2008

Diploma in Civil & Structural Engineering

Perth Australia

Tafe College 2006-2007

Certificate 3 Drafting in Civil & Structural

Engineering

HONOURS & AWARDS

The Institute of Engineers Australia

Year: 2009- December

Title: Officer Graduate

Registration number: 3676428

The Institute of Engineers Malaysia

Year: 2011-December

Title: Associate Member

Registration number: 46786

Board of Engineers Malaysia

Year: 2019 March

Title: Inspector of Work

Registration number: W16418

Singapore

November 1996- November 1999

CISCO

Constable

Patrols assigned areas, checking for suspicious activity in persons, or safety/fire hazard. Mainly at refinery plant like Exxon Mobile, Shell, Jurong Power Plant.

Escorts cash to ATM machines when cash transfers.

Decides when an incident requires written.

Assist law enforcement officers with crowd control and surveillance at large public events.

London UK

March 2000- January 2002

RCE Ltd UK

Assistant Civil Chain-man

Fresh involvement in Civil Engineering. Assist the surveyor to the site. Learning engineering drawings using computer-assisted drafting systems (CAD) engineering tools London UK

February 2002- April 2004

Menzies Air Cargo (UK)

Warehouse staff (Part-time)

Prepare documentation for clearance of all inbound shipments requiring formal entries and outbound shipments in accordance with customs and quarantine regulations.

Expedite Customs declaration efficiently and maximize customer satisfaction.

Prepare into freighter cargo pallet

Overall responsible for the forwarding of freight from one place to another sender location.

Ipoh Malaysia

June 2004-May 2005

Inflow Engineering Malaysia

Assistant at Site

Trainee. The Learning curve in engineering at the sewerage treatment plant.

Assist on-site, Prepare tools, plants (machinery), and other engineering require items on sewage cum drainage.

Perth Australia

January 2006-December 2007

Sealanes

Casual Staff- picker

Part-time staff. The night shift at a dry food warehouse.

Prepare dry food and staked into the pallet to send out to an ordering town-site example: Avon Valley, Kalamunda, Carnavon so on.



Contact this candidate