Seeking, opportunities in building a world class, goal-oriented environment. I offer an accomplished degreed professional derived from a combination of formal education as well as practical experience and success in the areas of Business Operations and Management.
SKILLS:
Working knowledge of ERP, CRM, MPS, JIT(Lean), MES, SPC, SFC, TQM and SCM technique, deployment and application, (single and multi-site), Client / Contract / Sub-Contract / Supplier / Change Mgmt., P&L / AR Maint, DSA/OSHA/WEAP/IBEW/LiUNA /IUOE/DOT/USACE/ MTA/LAUSD/DOD/D-FAR Literate, Proposal / Bid / Scope Analysis, Prep and Estimation, Forecast / Remote / Site resource mgmt.
EDUCATION:
Santa Monica (BSc), Devry, CSUF, LAVC, APICS (CPIM)
DATES – July 2022 through Current POSITION – Superintendent/Project Engineer
EMPLOYER – Confidential
General Contractor – public works / commercial
ACCOMPLISHMENTS:
Bluebeam / Smartsheet / Procore public works site trades/subcontractor mgmt. job / contract analysis, estimation, budget monitor/reporting, sub-contractor/vendor coordination, design/project change process mgmt, interpret and ensure compliance re all customer Local/State/Federal/University regulatory and/or contractual requirements. (Faculty Housing $24M)
DATES – Jan 2020 through May 2022 POSITION –Project Manager
EMPLOYER – Blum & Sons Electric 606 Linden Ave Carpinteria CA 93013 805-***-****
Electrical Contractor – private / commercial
ACCOMPLISHMENTS:
Sage / Trimble / HH2 / Labor Charts / Bluebeam / Smartsheet / Procore private res, hospitality, public works project mgmt. job / contract analysis, estimation, bid development / preparation and submission, sub-contractor/vendor coordination, design/project change process mgmt, interpret and ensure compliance re all customer Local/State/Federal regulatory and/or contractual requirements. (ERE Catalina $5M)
DATES – Jan 2019 through Jan 2020 POSITION –Project Manager
EMPLOYER – Heeter Construction 130 Meadow Ridge Road Mount Morris PA 15349 304-***-****
General Contractor – heavy civil commercial / pubiic works
ACCOMPLISHMENTS:
Sage / Heavy Bid / Bluebeam / P6 / Smartsheet Federal infrastructure project mgmt. job / contract analysis, estimation, sub-contractor/vendor coordination, design/project change process mgmt, interpret and ensure compliance re all customer Local/State/ Federal regulatory and/or contractual requirements. (Kentucky Lock Project $55M USACE/TVA)
DATES – Feb 2018 through Jan 2019 POSITION – Estimator/Project Manager
EMPLOYER – Blum & Sons Electric 606 Linden Ave Carpinteria CA 93013 805-***-****
Electrical Contractor – private / commercial
ACCOMPLISHMENTS:
Sage / Viewpoint / Timberscan / Bluebeam / Smartsheet Hospitality project mgmt. job / contract analysis, estimation, bid / COR development / preparation and submission, sub-contractor/vendor coordination, design/project change process mgmt, interpret and ensure compliance re all customer Local/State/Federal regulatory and/or contractual requirements. (Rosewood $9.5M)
DATES – Feb 2015 through Jan 2018 POSITION – Estimator/Project Manager
EMPLOYER – Bosco Constructors Inc. 21353 Mayall St. Chatsworth CA 91311 818-***-****
General Contractor, Public Works
ACCOMPLISHMENTS:
Sage / ProContractor / Heavy Bid / Bluebeam / MSProject / Smartsheet public works project mgmt. job / contract analysis, estimation, bid development / preparation and submission, sub-contractor/vendor coordination, design/project change process mgmt, interpret and ensure compliance re all customer Local/State/Federal regulatory and/or contractual requirements. (RMF/DOT/CVC 2015-17 $26M)
DATES – May2013 through Oct 2014 POSITION – Estimator/Project Manager
EMPLOYER – CSI Electrical Contractors 41769 11th St West Suite B Palmdale CA 93551 661-***-****
Electrical Contractor, Public Works
ACCOMPLISHMENTS:
Accubid-LiveCount / Planswift/ Bluebeam /MSProj. public works project mgmt. job / contract analysis, estimation, bid development / preparation and submission, sub-contractor/vendor coordination, design/project change process mgmt, interpret and ensure compliance re all customer Local/State/Federal regulatory and/or contractual requirements. (2014 $7M Rancho Campana award)
DATES – Jan 2012 through Oct 2012 POSITION - Customer Service Rep - Temp
EMPLOYER – Rio Tinto Minerals / USBorax 14886 Borax Rd. Boron CA 93516 661-***-****
Mineral Surface Mining Process and Bulk Distribution - Global
ACCOMPLISHMENTS:
Ongoing training re existing “Manufacturing Pro” enterprise software tools, as well as overall existing production planning operations, toward formal documentation of same for integration with SAP implementation targeted for September 2012. Forecast P&P development, process mapping, remote DC stock level configuration (domestic).
DATES – Jun 2010 through Aug 2011 (Contract) POSITION - Inventory Control Specialist
EMPLOYER – Independent Utility Supply, Inc., 200 E Larch Road, Tracey CA. 95304 209-***-****
Utility Material Supplier/Distributor, Public Works
ACCOMPLISHMENTS:
Materials management software/hardware configuration, implementation, training, and management. Aruba peripheral systems integration including wireless network as well as RF hand held data collection and electronic signature capture. Development of bill of materials configuration, receiving, storage, shipping and replacement materials processes including but not limited to written documentation of same. Initial physical inventory management along with ultimate transition to cycle count process and related management. Coordination and management of multiple client contractual obligations including scheduling, reporting, budgeting, and where necessary project recovery. (Eclipse/Aruba/Motorola9090/MSProj)
DATES – Feb 2007 to May 2010 POSITION - Operations Manager
EMPLOYER – Reyes & Sons Electric, Inc., 622 Glenoaks Blvd. suite A, San Fernando, CA 91340 818-***-****
Electrical Contractor, Public Works
ACCOMPLISHMENTS:
American Contractor & McCormick / MSProj / Primavera (financial & estimation software) implementation, revenue increase, formal Safety Mgmt., EMR reduction, procedures development / implementation. Multiple simultaneous public works project mgmt. job / contract analysis, estimation, bid development / preparation and submission, design/project change process mgmt, web site maint / development, interpret and ensure compliance re all customer Local/State/Federal regulatory and/or contractual requirements.
DATES – Nov 2005 to Sept 2006 POSITION - Service Manager
EMPLOYER – Brassfield Communications Inc, 6281 Chalet Dr Commerce CA 90040
Communications-Security-Fire Systems Contractor, Public Works
ACCOMPLISHMENTS:
Establish remote billing / service report capability, server/web-based scheduling re field technicians, inventory control including field equipment staging and delivery. (Notifier/Lenel/Rauland-Borg)
DATES – Feb 2002 to Oct 2005 POSITION - Project Manager
EMPLOYER – Reyes & Sons Electric, Inc., 622 Glenoaks Blvd. suite A, San Fernando, CA 91340 818-***-****
Electrical Contractor, Public Works
ACCOMPLISHMENTS:
Dual public works project mgmt. job / contract analysis, estimation, bid development / preparation and submission, design/project change process mgmt, interpret and ensure compliance re all customer Local/State/Federal regulatory and/or contractual requirements. (American Contractor & McCormick / MSProj / Primavera)
DATES – Oct 2000 to Oct 2001 (Contract) POSITION - Materials / Operations Manager / IT Project Manager
EMPLOYER – Smittybilt, 395 Smitty Way., Corona, CA. 92879 909-***-**** (company sold)
An aftermarket manufacturer of quality bumper and tubular accessories for the light duty truck / sport utility vehicle market.
ACCOMPLISHMENTS:
Resolved 850K neg. on hand, established plant wide system-based stock / allocation, increase order fill from 56 to 88%, inv. reduction of 2.5 M, 100% turns increase FG and raw, 30% cost reduction ("A" items offshore program), reduce back ord. from 1.5 to .37 M, 10/01 1st profit in 18 mths. (BPCS)
DATES – Nov 1998 to Oct 2000 (Contract) POSITION - Master Scheduler / Prod. Cntrl. Mgr. / Systems Analyst
EMPLOYER – Fey / Wedgestone Automotive Corp., 15854 Ornelas St. Irwindale, CA. 91706 800-***-****
A leading manufacturer and tier 1 supplier of bumper and tubular accessories for the light duty truck / sport utility vehicle market.
ACCOMPLISHMENTS:
Formal sales analysis and forecasting capability, project management re ERP software implementation project. (EPICOR)
DATES – March 1996 – Nov 1998 (Consultant) POSITION - Master Scheduler / Prod. Cntrl Mgr. / Systems Dvlpmt.
EMPLOYER – Tenneco Packaging, 159 North San Antonio Ave. Pomona, CA. 91767 909-***-****
Fortune 500 company, and leading manufacturer of foam, tissue, and bubble wrap packaging material re a variety of industries.
ACCOMPLISHMENTS:
Development and implementation of automated shop floor control module, RF data collection, sched/routing efficiencies. Project Mgr. MacPac upgrade (Anderson, Symbol, & SST)
DATES – April 1995 to Feb 1996 (Contract) POSITION - Master Scheduler / Systems Analyst
EMPLOYER – Schlosser Forge, 11711 Arrow Route, Rancho Cucamonga, CA. 91730 909-***-****
Aerospace, manufacturer of jet engine casings & rings.
ACCOMPLISHMENTS:
Implementation of detailed scheduling via distributed MS Project. Proposal related to Dataworks Enterprise Resource Planning software