Post Job Free

Resume

Sign in

Construction Manager Superintendent

Location:
Spring Hill, TN
Posted:
May 27, 2023

Contact this candidate

Resume:

Linda Wynans

**** ******* **. #***

Spring Hill, TN 37174

615-***-****

adxc1t@r.postjobfree.com

** ***** ** *********** ************ supervisory experience in power generation and distribution including gas, steam, coal, biomass, and wind as well as high voltage and extra high voltage transmission and distribution.

Excellent safety record with strict adherence to safe work practices demanded. Proficiencies: biomass ethanol processes, combined-cycle/simple-cycle installations, subcontractor supervision, turbines, generators, transformers, MV and HV circuit breakers, MCC, switchgear, switchyard and substations, inspection and testing, LOTO, system packages, dB Tracker, QA/QC, OSHA 30, NEC, NESC, and NFPA 70E. Contract work preferred.

Ampirical Solutions Populus Group

Bentonville Electrical Utilities Department 161 kV Circuit Relocation/ Substation Project Bentonville, Arkansas 08/22-10/22

Acting Construction Manager

• Temporary position overseeing subcontractor deconstruction of one substation, completion of two substations and 161 kV underground line relocations. Concurrently monitored removal of overhead 69 kV distribution lines and poles. Created and completed punchlists for all stages of activity.

Community Volunteer

06/20-07/22

Returned home at start of pandemic to be of service to my community. Volunteered for various health clinics and food banks.

Burns and McDonnell Engineering Astra-Works

Projects included:

East Kentucky Power Cooperative Spurlock Station CCR-ELG Project Maysville, Kentucky 09/19-06/20

Electrical superintendent, acting T&D superintendent and outage LOTO manager

• Superintendent of all electrical construction including subcontractor supervision during plant upgrades and expansion, monitoring multiple outages, and installation of four prepackaged electrical rooms while concurrently acting as temporary T&D superintendent supervising subcontractors installing new transformers, breakers, and differential relay racks in 138 kV substation during five line outages. Established new reporting standards for substation control room relay equipment testing subcontractor. Brought plant equipment and substation transmission lines back up within non- negotiable time constraints. Reviewed substation electrical subcontractor documentation for discrepancies and coordinated resubmission of testing and documents from subcontractor ensuring accurate data for plant turnover. Assisted civil and electrical subcontractors in proper procedures for dB Tracker QC documentation which standardized submissions across multiple crafts. Rocky Mountain Power/PacifiCorp Jim Bridger Substation Elevation Change and Equipment Relocation

8 Miles NE Point of Rocks, Wyoming 04/19- 08/19

T&D superintendent

• Supervised subcontractors deconstructing and removing breakers and capacitor bank to be reinstalled after elevation change. Tested individual capacitors to determine operability and reported results to PacifiCorp for review. Upgraded grounding and lines upon reinstallation with new poles and accessories. Coordinated reception, receipt and inspection of steel poles with representatives of Chinese manufacturer. PSE&G Trenton MTB Project- Underground Transmission Circuit 220-3 Trenton, New Jersey 03/19

T&D superintendent

• Supervised subcontractors on oil fill and testing of new transformers. Supervised subcontractors who pulled, terminated, and tested new 230kV circuit on load and line side completing operation before deadline and under budget. Upper Michigan Energy Resource Corporation Mihm Generating Station – 3 engine 54 MW Pelkie, Michigan 08/18- 01-19

Electrical superintendent and LOTO manager

• Supervised subcontractors on greenfield installation of all components of generating station including (3) 18-cylinder Wartsila engines, transformers, breakers and electrical room equipment and accessories. Coached in methods of and reviewed subcontractor dB Tracker documentation resulting in uniform quality and timely turnover to project owner. PSE&G Trenton MTB Project- Underground Transmission Circuit 303-1 Trenton, New Jersey 07/18

T&D superintendent

• Supervised subcontractors that pulled, terminated, and tested new 230kV circuit on load and line side completing operation before deadline and under budget. PSE&G Cook Road TMP Project

Nutley, New Jersey 03/18- 05/18

T&D superintendent

• Responsible for installation and upgrade of two transformer monitoring protection systems and replacement of four differential relay racks. Supervised subcontractors and vendors and coordinated between four PSE&G divisions through delays due to adverse weather situations to successfully bring in project on time. Responsible for scheduling, managing multiple outages, tracking and reporting progress, and examining drawings to ensure work performed was above PSE&G expectations and standards. PSE&G Network H-1308 Upgrade

Newark, New Jersey 01/18- 03-18

T&D superintendent

• Responsible for removal of old components of H-1308 line and installation of new CCVTs and relay racks. Supervised subcontractors and coordinated with PSE&G relay, UG, Substation, and Lab divisions. Initiated and monitored location change of relay racks due to physical barriers in uniquely configured substation. Coordinated outages and monitored progress reporting all possible delay factors promptly. Brought H-1308 line back up in coordination with Essex Switch before deadline with no issues. Confidential Aerospace Contractor B-78 Lighting Upgrade United States 10/17- 01/18

Superintendent

• Responsible for lighting upgrade in area with strict time constraints and non-flexible project completion date. Supervised subcontractor coordination with other subcontractors working in tightly configured area. Tracked and reported progress to client in daily meetings, meeting all deadlines and bringing project to close with no punch list items.

01/99 through 2016

EDF Renewables/ Wynans Power and Energy Consulting Tyler Bluff Wind Energy Project, Muenster, Texas 05/16- 07-16

Electrical superintendent (Owner's Rep Consultant)

• Supervised general contractor and subcontractors in substation identifying possible construction deficiencies. Monitored projected schedule versus real-time construction meeting project deadlines.

• Successfully developed and tracked SCADA schedule and installation to meet ERCOT deadlines for transmission tie-ins and starts.

Virginia Dominion Power BETA Engineering

Chesapeake and Virginia Beach, Virginia 04/15-02/16 Construction manager

• Upgraded switchyards with Siemens SVC technology working in high security utility. Supervised multi-contractors to insure high performance within budget and time constraints while performing all work in a safe manner. Consumers Energy, JP Campbell Power Plant Randstad Engineering West Olive, Michigan 09/14-12/14

Electrical superintendent

• Created installation procedures for receipt, offload, set and dress of two 138kV transformers.

• Developed installation schedule and coordinated contractors for extreme cold weather outdoor transformer installations, creating heated structures around transformers and following strict plant environmental policies and procedures ensuring safety for workers involved.

Hugoton 2nd Generation Biomass Project Abeinsa EPC Abengoa Hugoton, Kansas 05/13-06/14

Senior electrical supervisor

• Supervisor of all MV installations including switchyard, load bank, and transformers.

• Reconfigured electrical systems with engineering to bring in synchronization. Supervisor of six independent electrical rooms including DCS and Siemens VSDs managing the coordination of independent systems successfully.

• Supervisor of independent natural gas generators, steam turbine, and switchyard electrical systems.

• Supervisor of wet cake, stillage, biomass, and baghouse installations with interdependent conveyors.

• Coordinated with subcontractors resolving construction issues and design deficiencies. Developed written prototype for documentation and resolution between subcontractors enabling smooth interface.

WETT Energy Transmission Project Isolux Corsan

Big Spring, Texas 08/12 -12/12

Senior electromechanical supervisor

• Supervision of (5) 345kV substation installations for transmission lines supporting wind energy.

• Supervision of multiple subcontractors and interface and coordination with multiple utilities.

• Determined power needs for predicted future expansion of substations; provided to utilities and owner to bring in necessary secondary power alleviating the need for future utility power upgrades

BP Energy Flat Ridge 2 Wind Energy Project Blattner Energy Harper, Kansas 04/2012-07/2012

Superintendent

• Supervised sub-contractor installation of (2) 345kV substations, installation of all equipment and contractor, vendor, and third-party testing.

• Coordinated interface between substation, collection, transmission, and utility to meet expected timelines.

CFE/ROMA M Cogeneration, SA de CV Sulzer Turbo Services Tihualtan, Veracruz, Mexico 10/11-02/12

Electrical technical director

• Electrical field supervision of sub-contractors building relocated Siemens gas turbine, transformers, isophase and other LV/MV equipment and material. Developed specifications for installations in Spanish.

Bechtel Power 07/2009-10/2009

On Hold Status with Bechtel

W.H. Sammis Power Air Quality Project Bechtel Power Stratton, Ohio 12/08-10/09

Electrical superintendent night turn

• Supervised all electrical installations/craft labor. Identified deficiencies in engineering documents and field installations to provide fast and quality resolutions to issues and budget controls.

El Kureimat III-2x9FA Combined-Cycle Power Generation Facility Granite Services International

Giza, Egypt 02/08-07/08

Project electrical lead

• Supervised electrical GE technical advisers, electrical activities of consortium partner TCM; inspected and reported progress to UEEPC (Upper Egypt Electrical Power Company) to maintain material, budget and quality standards and project schedules.

• Developed in Arabic lock-out/tag-out training classes for all site personnel to ensure craft and site safety.

Mt. Storm Wind Energy Project Mortenson Construction Mt. Storm, West Virginia 06/07- 10/07

Electrical quality lead

• Supervised all electrical installations from collection system to generating system, ascending wind turbine towers daily to inspect and document electrical activities.

• Initiated turbine walk-down schedule and developed electrical walk-down procedure; provided a punch list to sub-contractors for action to ensure timely turn-over to client while meeting budget constraints and project schedules.

OXY-Chem Battleground Plant Rehabilitation of 80MW Steam Turbine L-CON Constructors LaPorte, Texas 10/2006-03/2007

Supervisor of electrical and instrumentation

• Implemented daily on-site engineered designs interacting with fully operational plant facility securing work permits containing planned, detailed daily activities eliminating interference with operation’s scheduled maintenance while meeting OSHA safety requirements.

• Provided assistance to GE Power Division Controls, while meeting client’s requests/needs, and adhering to GE’s specifications and budget constraints enabling smooth start-up and turn-over. Trans-Canada Energy 550MW Combined-Cycle Cogeneration Project J.P. Marcouiller, Inc. Becancour, Quebec, Canada 06/05-02/06

Electrical turn-over coordinator, QA/QC

• Developed all written electrical inspection and test plans for GE equipment and BOP installations.

• Supervised installation of all GE equipment, BOP, HVAC, fire protection and detection, communication and lighting systems, identifying and correcting deficiencies to meet project schedules. Turn-over coordinator of electrical systems; responsible for punch-list, follow-up, completion and documentation of said systems.

Progress Energy 500MW Combined-Cycle Power Generating Project S&B Engineers and Constructors, LTD

Bartow, Florida 09/04- 06/05

Electrical and instrumentation turn-over coordinator

• Supervised electrical and instrumentation system walk-downs and milestone packages resulting in efficient correction and completion of systems. SNC Lavalin (formerly NEPCO)

01/99-07/03

Projects included:

• COGENTRIX Generating, LLC., Caledonia, Mississippi- 820MW combined- cycle project. Served as electrical and instrumentation foreman and systems completion coordinator.

• TECO/Gen Power, McAdams, Mississippi- 580MW combined-cycle project. Served as electrical foreman and systems completion coordinator.

• Enron North America, Gleason, Tennessee- 500MW simple-cycle project. Served as electrical journeyman and system milestone documentation coordinator.

• Enron North America, New Albany, Mississippi- 360MW simple-cycle project. Served as electrical journeyman and lead wire puller.



Contact this candidate