James R. Malecek

Current date **/**/****

Mechanical Superintendent

Mechanical Superintendent / Piping Designer

More than 45 years of Construction experience in Pipe Fabrication, engineering, installation, and other mechanical responsibilities with over 20 years as a Superintendent. An experienced leader in managing multiple mechanical subcontractors both stateside and overseas including experience as Project Manager. Extensive industry experience includes but is not limited to Chemical, Oil Refinery, Mining, Power Plant, Refrigeration, Pharmaceutical, Food and Beverage, Plastic Polymer, and many others. Began employment as a Pipe Foreman with Fluor Daniels in 1988.

Mechanical Superintendent Bayer

Fluor/ Bayer CCTC and CCTC 2/3 800 Dwight Way

September 2019 to February (Three Years Plus) Berkeley, CA

Fluor was selected to provide construction activities and demodulation of several Buildings. Then build back two

pharmaceutical buildings and a pipe rack for utilities to the new buildings. Then make a park out of some of the land. Updated Underground Sanitary Sewer on half of the campus per city codes. Being part of all of this progress.

• Coordinate daily work and collaboration between all subcontractors

• Verify all work by contractors is per design and regulations

• Ensured quality control and Bayer satisfaction by working closely with Bayer end users, design team, and subcontractors to guarantee work performed met expectations

• Provide feedback to the engineering team for end-user practical usage and best practices

• Update and provide contractor’s progress for monthly reporting

• Client walkthroughs including; civil and structural architectural, electrical, hygienic and non-hygienic piping, HVAC, plant and clean utilities, waste systems, fire protection, formulation, and automation

• Quality inspections of all equipment deliveries and installation of all pharmaceutical equipment, piping, steelwork, and sheet metal.

• Plan and organize own work assignments, as well as carry out tasks from management staff

• Maintain compliance with all applicable policies, procedures, and global standards

• Adhere to and support Fluor's Health, Safety & Environmental, and Sustainability Policies

• Collaborate with the HSE team to develop and implement new creative methods of preventing incidents – weekly contractor all-hands meetings, adopt-a-crews, hazard elimination cards, & training sessions

• Effectively develop and apply the Core Skills to the job

Client Advisor Gilead

Fluor NB 357 Plot Lab Project

November 2018 to July 2019 Foster City, CA

Fluor was selected to provide construction oversight of a 3 Billion dollar testing facility.

Advising and verifying Architectural construction activity of a project with over 150 craft personnel.

Oversight of subcontractors’ work with an emphasis on Safety, Quality, and Production.

Mechanical Superintendent Proctor & Gamble

Fluor Talladega Independence Project

April 2017 to November 2018 Martinsburg, WV

Fluor was selected to oversee the 485-acre manufacturing and distribution plant construction oversight.

Oversight of five subcontractors; supervising and verifying pipe installation with 150 craft personnel.

Successful completion of one million man-hours worked without a recordable injury.

Mechanical Superintendent Astra Zeneca

Fluor Boulder Biomanufacturing

February 2016 to April 2017 Boulder CO

Coordinated contractors demoing and installing hygienic pipes, service systems, HVAC ducting systems, and equipment.

Identify interferences between systems to coordinate work; coordination between the client and

Oversight of subcontractors’ work with an emphasis on Safety, Quality, and Production.

Turnover Engineer Baxalta

Fluor Albumin Pharmaceutical Project

July 2015 to February 2016 Social Circle GA

Size ($1.5 US Billon)

Responsible for installation verification of Hygienic and non-Hygienic systems.

Coordinated between Mechanical, Electrical, and Instrumentation trades, for the completion of systems to be approved by Baxalta. With an emphasis on Safety, Quality, and Production.

Walked down Process and design details I.D. to ensure compliance

Mechanical Superintendent ALCOA

Fluor Power & Propulsion

Oct 2014 to July 2015 La Porte, IN

450,000 Sq Ft Manufacturing Casting facility.

Identified interferences to improve production, emphasizing Safety, Quality, and Production.

Coordinate with contractors to ensure compliance with building specifications

On-site for project execution to completion.

Mechanical Superintendent Eagle Nickel

Fluor Eagle Nickel Project

Mar 2014 to Sept 2014 Marquette, MI.

2,000 tons of ore per day Concentrator Plant

Coordinated Pre-commissioning Activities.

Verified completion of systems to be commissioned.

Identified interferences to improve production. With an emphasis on Safety, Quality, and Production.

Mechanical Superintendent ADM

Mid-States Mechanical Services Inc. 63DE ION EXCHANGE CORN SYRUP PROJECT

Sept 2013 to Feb 2014 Marshall, MN

(10,000 feet of pipe, field verifying and installing)

Served as Project Manager

Coordinated with the client installation of Piping Systems

Identifying interferences to improve production. With an emphasis on Safety, Quality, and Production.

Completed multiple shutdown units

Mechanical Superintendent Barrick Silver

Fluor Pascua-Lama Project

Jan 2013 to May 2013 Pascua-Lama, Argentina

Gold Mine Producing 200,000 ounces of ore per day

Coordinated installation of Piping Systems.

Identified interferences to improve production. Performed work with an emphasis on Safety, Quality, and Production.

Mechanical Superintendent Oyu Tolgoi

Fluor Oyu Tolgoi Copper-Gold Mine Project

Nov 2011 to Oct 2012 South Gobi region of Mongolia

Copper Gold Mine 100,000 tons of ore per day Concentrator Plant

Supervised and coordinated with contractors to ensure install of Piping Systems

Supervision of approximately 150 local personnel (with an interpreter)

Identified interferences to improve production.

Corrected issues with Rubber Lined Pipe Systems among others

Mechanical Superintendent British Petroleum

Fluor BP Whiting 12 PS Modernization Project

June 2011 to Nov 2011 Whiting, IN

(1 Billion Dollar Project)

Coordinated replacement of 9 Chrome Valves

KBR Pipe Fitter / Instrument Fitter – DuPont Project, Circleville, Ohio (May-June 2011)

Fluor Mechanical Superintendent – Frito-Lay, Multiple Locations (Feb 2011 to May 2011)

Fluor Piping Superintendent - TOTAL, Port Arthur, TX. (June 2009 March 2010)

TOTAL Deep Conversion Project in Port Arthur Refinery

Fluor Mechanical Superintendent - Medimmune, Frederick, MD. (May 2008 to June 2009)

Four Hundred Million Dollar Pharmaceutical Project.

Fluor Mechanical Superintendent - Evansville, IN. (Jan 2008 to May 2008)

Wet Flue Gas Desulphurization Unit for three One Hundred and Fifty Mega Watt and

Coordinated pipe and mechanical punch list/engineering issues.

Mechanical Superintendent - ADM Peoria, IL. (2007)

Responsible for replacement of 3,400 feet of 4in coils in 10-28 foot diameter Fermenters

Mechanical Superintendent, ADM Decatur, IL. (2006-2007)

Responsible for designing pipe systems, developing Isometric drawings with Auto Cad

Fluor Asset Manager - Visalia; CA (2004 TO 2005)

Responsible for documenting the removal of a Frito-Lay production line.

Fluor Mechanical Superintendent - New Haven; WV (2004)

Coal Burning Power Plant. Replacement of Burner Roof, Wall Tubes, Primary and Secondary Superheater.

Fluor Mechanical Superintendent - East Greenwich, RI (2003-2004)

AMGEN Bionext Project (One Billion Dollar Project)

Hygienic pipe, set equipment, and walked systems. Coordinated pipe and mechanical punch list

Fluor General Foreman - Forney, TX (2002-2003)

One Thousand One Hundred and Sixty Eight Mega Watt Combined Cycle Power Plant

Responsible for installation of 1, 2, and 9 Chrome Heavy Wall. In addition, As Commissioning General Foreman, coordinated activities and workforce for Steam Blows (One of the last to leave the Project)

Fluor General Foreman - Bastrop, TX (2001-2002)

Five Hundred Mega Watt Combined Cycle Power Plant (One of the last to leave Project)

Fluor Supervisor -Newcastle, OK (2000-2001)

Five Hundred Mega Watt Combined Cycle Power Plant (One of the last to leave Project)

Fluor General Foreman - Paris, TX (1999-2000)

Two-Five Hundred Mega Watt Combined Cycle Power Plant (One of the last to leave Project)

Fluor General Foreman - Lawton, OK (1999)

(One of the last to leave Project)

Additional Employment Experiences

Started with Fluor Daniels in Nov of 1988 as a Foreman

Perry Gas Inc. – Odessa, TX – Pipe and Code Vessel Fabrication Shop (Pipe Foreman) (1979-1987)

HB Zachery – San Antonio, TX – Pipe Foreman

Altra Construction, Van Buren, AR – Journeyman Pipe Fitter

Kelly Group, Decatur, IL – Pipe Foreman

Professional Certifications

Mechanical / Pipe Superintendent / General Foreman

ACE Pipe Fitter Foreman / ACE Pipe Fitter (Fluor Corp. Certification)

Craft Instructor Certification (National Center for Construction Education and Research) [Expired]

OSHA 10 Hour Construction Industry CERTIFACATION



Contact this candidate