Seenivasan Tulasiraj
SENIOR ELECTRICAL ENGINEER
PROFESSIONAL SUMMARY
Electrical Engineer with 17 years’ Experience in the construction industry (EPC). Over the past 17 years Working as a Project Electrical Engineer and I have worked on Oil and Gas, Commercial, Industrial and Resort projects. WORK HISTORY AT KSA AROUND 14 YEARS
1. Senior Electrical Engineer Sep 2021 till now
Project Title: Government Security Complex Projects – Kingdom Wide. Client: Saudi Aramco
Role in Project: Senior Electrical Engineer with below responsibilities
● Involving in Design Preparation with Designer with reference to FEED design
● Coordination in Design approval Process
● Preparation of Material approvals (MR & MTA)
● Coordination with Procurement Department for material Delivery
● Coordination with PQCS for material approval after delivery
● Execution of project with coordination of site team Scope Involved in the Project
● Supply, installation and Testing of RMU, Unit substation, package substation
● Supply, installation and testing of 13.8kv Overhead Transmission Line
● Supply, Installation and Testing of MV and LV cabling
● Supply, installation, and Testing of Indoor and Outdoor LV panels and switch racks
● Supply, installation, and Testing of Indoor and Outdoor LED light fixtures and Small Power system
● Supply, installation, and Testing of Fire alarm system
● Supply, installation, and testing of HVAC controls (DDC) system. CONTACT
Address:
Al Khobar City, Saudi Arabia
Phone: 059*******
Email:
adx8fk@r.postjobfree.com
PROFESSION:
ELECTRICAL ENGINEER
Member of Saudi Council Engineers
Membership. No. 197307
EDUCATION
Bachelor of Engineering in Electrical
and Electronics,
Year 2002-2006
Anna University Tamil Nādu, India
Graduated 2006
WORK EXPERIENCE / MV
● MV SWITCHGEAR
● RMU
● UNIT AND PACKAGE SS
● MV GENERATORS
● OVERHEAD POWER
LINES
● POLE MOUNTED
TRANSFORMERS
2. E&I Superintendent Aug 2019 to Sep 2021
Project Title: ASHAR TENTED RESORTS - ALULA
Client: Royal Commission of Alula / AECOM
Role in Project: E&I Superintendent with below responsibilities
● Material approval Process with consultant GAJ from Dubai
● Online technical meetings with Consultant and Designer for material approvals as well Shop drawings approvals
● Coordination with Architecture for approval of all electrical and Low current devices (Organizing the mockup approvals and inspection)
● Coordination with Procurement Department for material Delivery
● Coordination with QC for material approval after delivery
● Execution of project with coordination of site engineers Scope Involved in the Project
● Supply, installation and testing of LV Panels
● Supply and Installation of Light fixtures and wiring devices
● Supply and Installation of GRMS system
● Supply and Installation of BMS system
● Supply and Installation of Access control system
● Supply and Installation of EMS system
● Supply and Installation of Fire alarm system
● Supply and installation of IP telephone system
● Supply and Installation of Data and Voice system
● Supply and Installation of Lightning and Grounding System
● Supply and Installation of LV and ELV cabling, and Infrastructure works
● Supply and Installation of Security control system 3. E&I Engineer Jan 2019 to Aug 2019
Project Title: PRE-ENGINEERING & FORM AREA BUILDINGS PROJECTS - FADHILI Client: SAUDI ARAMCO / TECHNICAS & REUNIDAS
Role in Project: E&I Superintendent with below responsibilities
● MV CABLING
WORK EXPERIENCE / LV
● LV PANELS & MCC
● LV GENERATORS
● ATS
● LOAD SHARING & SYNCH
PANELS
● POWER TRANSFORMERS
● DRY TYPE
TRANSFORMERS
● LV CABLING
● CABLE TRAY SYSTEMS
● GROUNDING SYSTEMS
● LIGHTNING PROTECTION
SYSTEM
● FIRE ALARM SYSTEM
● LIGHTING AND SMALL
POWER SYSTEM
● SPLICING AND
TERMINATION
● DUCT BANKS AND INFRA
STRUCTURE ELECTRICAL
WORK EXPERIENCE / ELV
● BMS system
● HVAC control system
● GRMS system (Guest Room
Management System)
● EMS System
● Lighting Control System
(KNX)
● Wide Alerting System
● Security Control System
(access controls and security
cameras)
● Coordination with Procurement Department for material Delivery
● Execution of project with coordination of site team Scope Involved in the Project
● Supply, installation and Testing of Lighting and Small Power system
● Supply and Installation of Lightning and Grounding system
● Supply and Installation of Fire alarm and HVAC control system 4. Instrumentation Engineer Aug 2017 to Jan 2019
Project Title: PRECAST BUILDINGS FINISHING PROJECTS - FADHILI Client: SAUDI ARAMCO / TECHNICAS & PETROFAC
Role in Project: Instrumentation Engineer with below responsibilities
● Coordination with Procurement Department for material Delivery
● Preparation of Shop Drawings
● Coordination with Site QC team for approvals of installation works
● Coordination with Testing team to energize the system
● Working as team lead for finalizing the snag list and participating in Project Handing over team
Scope Involved in the Project
● Installation of Fire and Gas detection systems
● Installation of HVAC control system
● Installation of List station control system
● Installation of Multilevel indoor cable tray system for electrical and Instrumentation systems
5. Senior Electrical Engineer Aug 2017 to Jan 2019 Project Title: SDL ( SITE DEVELOPMENT AND LOGISTICS) PROJECTS - JUBAIL Client: SADARA CHEMICALS
Role in Project: Senior Electrical Engineer with below responsibilities
● Coordination with Procurement Department for material Delivery
● Preparation of Shop Drawings
● Vendor Coordination for installation of specific systems
● Coordination between Client to vendor for training and operation of specific systems
● IP telephone system
● PAGA System
WORK EXPERIENCE / FIRE
PROTECTION SYSTEMS
● Installation of Fire alarm
system
● Installation of GAS detection
system (Toxic and Flammable
gas)
● Installation of Hydrogen Gas
detection system
● Installation of FM 200 system
● Coordination with PE
Engineers for drawing
approvals
EXPERIENCE WITH
PRESTIGIOUS CLIENTS
● SAUDI ARAMCO
● MA’ADEN
● ROYAL COMMISSION
● SADARA CHEMICALS
● GENERAL ELECTRIC
● STAR COMPANY
● FLUOR ARABIA
● PETROFAC
● TECKNICAS & REUNIDAS
EXPERIENCE WITH
PRESTIGIOUS
CONSULTANTS &
DESIGNERS
● Coordination with Site QC team for approvals of installation works Scope Involved in the Project
● Supply, installation, and Testing of Lighting and Small Power systems
● Supply, Installation and Testing of Fire alarm system
● Supply, Installation and Testing of Toxic and Flammable Gas Detection systems
● Supply and Installation of Hydrogen Gas detection system
● Supply and Installation of Computerized weighbridge
● Supply and Installation of Dock Levellers
● Installation of HVAC control system
● Installation of List station control system
6. Senior Electrical Engineer SEP 2015 to Jan 2017 Project Title: PRECAST BUILDING PROJECTS - JUBAIL
Client: SADARA CHEMICALS / TECHNICAS & RE-UNIDAS
Role in Project: Senior Electrical Engineer with below responsibilities
● Coordination with Procurement Department for material Delivery
● Preparation of Shop Drawings
● Coordination with Site QC team for approvals of installation works
● Coordination with Testing team to energize the system
● Working as team lead for finalizing the snag list and participating in Project Handing over team
Scope Involved in the Project
● Installation of Lighting and Small Power systems
● Installation of Fire and Gas detection systems
● Installation of Lightning and Grounding systems
● Installation of HVAC control system
● Installation of List station control system
7. Senior Electrical Engineer SEP 2013 to SEP 2015 Project Title: EMERGENCY RESPONSE BUILDING PROJECT - JUBAIL Client: SADARA CHEMICALS
WORLEY PARSONS
AECOM
FUOR ARABIA
SAUD CONSULT
SOFCON
GODWIN AUSTIN(GAJ)
KATIB & ALAMI(SCEC)
LANGUAGES KNOWN
ENGLISH
TAMIL
HINDI
ARABIC
TELUNGU
Role in Project: Senior Electrical Engineer with below responsibilities
● Material approval Process with consultant FLUOR ARABIA
● Coordination with Procurement Department for material Delivery
● Coordination with QC for material approval after delivery
● Execution of project with coordination of site engineers Scope Involved in the Project
● Installation of Lighting and Small Power systems
● Installation of Fire and Gas detection systems
● Installation of Lightning and Grounding systems
● Installation of HVAC control system
● Installation of List station control system
8. Electrical Engineer JULY 2011 to SEP 2013
Project Title: TCF AND 13.8KV SWITCHGEAR BUILDING PROJECTS-SHAYBAH Client: SAUDI ARAMCO
Role in Project: Electrical Engineer with below responsibilities
● Material approval Process with PMT
● Coordination with Procurement Department for material Delivery
● Coordination with QC for material approval after delivery
● Execution of project with coordination of site engineers Scope Involved in the Project
● Installation of 13.8kv,2.5MVA Generators and Load sharing controls
● Installation of 13.8kv Metal Clad switchgear panels
● Installation of Loop Feed Transformers
● Installation of Power distribution switch racks
● Installation of water well electrical and instrumentation systems
● Installation of electrical and instrumentation systems for STP
● Installation of Fire alarm systems
● Installation of Lighting and Small Power systems
● Installation of Lightning and Grounding systems
● Installation of HVAC control system
● Installation of List station control system
9. Electrical Engineer DEC 2009 to SEP 2011
Project Title: MAADEN ACCOMODATION VILLAGE- ALJALAMID-ARAR Client: MA’ADEN PHOSPAHTE COMPANY
Role in Project: Electrical Engineer with below responsibilities
● Material approval Process with PMT/WORLEY PARSONS
● Coordination with Procurement Department for material Delivery
● Coordination with QC for material approval after delivery
● Execution of project with coordination of site engineers Scope Involved in the Project
● Installation of 13.8kv,Overhead transmission Line
● Installation of RMU
● Installation of 3MVA Power Transformers
● Installation of Power Panels and Motor control centres
● Installation of Fire alarm systems
● Installation of Lighting and Small Power systems
● Installation of Lightning and Grounding systems
● Installation of HVAC control system
● Installation of List station control system
10. Electrical Engineer MAY 2009 to DEC 2009
Project Title: SITE DEVELOPMENT PROJECTS- DAMMAM
Client: GENERAL ELECTRIC COMPANY
Role in Project: Electrical Engineer with below responsibilities
● Material approval Process with PMT/SOFCON
● Coordination with Procurement Department for material Delivery
● Coordination with QC for material approval after delivery
● Execution of project with coordination of site engineers Scope Involved in the Project
● Installation of Infrastructure LV systems
● Installation of Temporary power generation station
● Installation of Outdoor Area Lighting system
WORK HISTORY AT INDIA AROUND 3 YEARS
1. Electrical-Estimation & Tendering JUNE 2006 to JUNE 2008 Company: DEVISHREE ELECTRICALS - CHENNAI
Role: Electrical Engineer with below responsibilities
● Estimation of LV Panels and MCC and coordination with client for approval
● Coordination with Panel board factory for fabrication of approved panels
● Estimation for new BOQ for turnkey projects
● Procurement coordinator for projects
● Working as procurement Coordinator for JIPMER HOSPITAL Projects, VITALO PLASTICS Projects.
2. SITE ELECTRICAL ENGINEER JUNE 2008 to APRIL 2009 Project Title: - REFEX REFRIGERANTS PROJECTS- CHENNAI Client: REFEX COMPANY
Company: DEVISHREE ELECTRICALS - CHENNAI
Role in Project: Electrical Engineer with below responsibilities
● Installation of Infrastructure LV systems
● Installation of Outdoor Area Lighting system
● Installation of 11kv, DP Structure
● Installation of Power Transformers
● Installation of Power Panels and Motor control centres
● Installation of Cable Tray system
● Installation of Indoor Light fixtures
● Installation of Indoor power systems.
PERSONALDATA
DateofBirth : 21-Dec-1984
CivilStatus : MARRIED
Citizenship : INDIAN
31 July 2023 1445 Ͳ ̜̻ 14
ͮ௬ͩ Ͼ̺͙̗̯̺͙͡ ͮ ௬̠ ͳ̗ ̢̼̺͙̗̮̓͡ .Ͳ / ͮ Ͼ̹̻̺͙
͙͞ ̠͆ ̘ ͳ̵̠̓̓ ௬̼ ௬̠
̠̼͂̽͡ : ͮ ௬̢̼ ௪̺͙
͂௬̗̓ͅ ̹̺͙̾ ̠̼̺͙͂̾͡ : ̢̞ͧ ௪̺͙
SEENIVASAN TULASIRAJ
Classification: Engineering
Specialization : Electrical Engineering
' 0 '1 2 "3 4 5 )
6 )
70
0
2 6 89 : 2 7 0 2 4 #
6 ) 0 '1 2 "3 4 5 ) "> 2
2 '
6 )
< 4 ) < 6 4 A "
" ' 3 ) <4 )( 28 : "
2 4 )
4 6 ) <4 )( 28 : "
B 2 . 0
.C 60
-"
4
#
& 3
& 3
" 2 4
<'2D D'1D
,
'1 2 "3 4 5 )
% ) 3 6 !"
22 <
3" ! B" 8
6 6 4 3 6 E'1 2 "3 4 5 ) E 4 FGHI JKLMINHJJLO PLI LQJRNLJHSLOT UVMVKLJVWX
2 " " & 3" ! (4
<'2D D'1D & 3" 4 ) 3" 6