Post Job Free

Resume

Sign in

Power Plant Set Up

Location:
Prakhon Chai, Buri Ram, 31140, Thailand
Posted:
July 12, 2023

Contact this candidate

Resume:

GRAHAM MOLYNEUX ( MRSC ) BSc.

Address: SURIN, THAILAND

Tel: 006*-******** (home)

E-mail: adx81g@r.postjobfree.com

Date of birth: 6 October 1950

Marital Status: Single

Member of the Royal Society of Chemistry

Qualifications: Graduate Member of the Royal Society of Chemistry Higher National Certificate in Chemistry

BSc Chemistry

Profile: A highly organized Power Plant Chemist with recent experience of commissioning modern CCGT’s worldwide. With first hand knowledge of large industrial power stations, is able to work under pressure and meet deadlines when required. Capable of communicating with people at all levels.

CAREER HISTORY

2019 - present Siemens Egypt 4800 MW CCGT Senior Chemist 2019-present Metka 400 MW CCGT, Ghana. Commissioning Chemist 2018-2018 BOYLE ENERGY, MEXICO,840 MW CCGT.COMMISSIONING 2015-2016 SIEMENS,ARGENTINA,814 MW CCGT, COMMISSIONING CHEMIST 2015-2015TERNA, GREECE,800MW CCGT. COMMISSIONING CHEMIST. 2015- 2015 ALSTOM, ESTONIA, 300MW CFB COMMISSIONING CHEMIST 2014- 2015 METKA, JORDAN, 740 MW CCGT. COMMISSIONING CHEMIST 2013-2014 SAMSUNG, DUBAI, 800MW, CCGT.COMMISSIONING CHEMIST 2012- 2013 METKA, GREECE, 800MW CCGT.COMM. CHEMIST 2011- 2012 TGU . TRINIDAD,750 MW CCGT. LEAD CHEMIST 2011- 2011 GE . RUSSIA, 800MW CCGT . COMM. CHEMIST 2010 -2010 GDF. FRANCE, 400 MW CCGT

CHEMISTRY CO-ORDINATOR/ADVISOR

COMPLETION AND FINAL HANDOVER OF POWER PLANT TO OPERATOR. TRAIN OPERATIONAL STAFF ON:

DEMIN. PLANT,ELECTRO -CHLORINATION,SAMPLING AND ANALYSIS,SET- UP

LABORATORY AND COMPLETE OPERATIONAL CHEMISTRY SYSTEMS. 2009-2010 SIEMENS. ARGENTINA COMMISSIONING CHEMIST 800MW

CCGT .

2 INTO 1 CCGT. SYSTEM ENGINEER FOR ION EXCHANGE WTP COMMISSIONING

CCGT

HF ACID CLEAN OF HRSG's,COMMISSIONING OF ABB SAMPLE RACK. COMMISSIONING

SIEMENS SA OF DOSING SKIDS.

COOLING TOWER DOSING SET-UP. TRAINING OF OPERATIONAL STAFF FOR CHEMICAL ANALYSIS

AND CONTROL.STEAM PURITY ANALYSIS DURING COMMISSIONING. 2008 - 2009 URS. TAIWAN COMMISSIONING CHEMIST 800 MW CCGT. COMMISSIONING OF ION EXCHANGE WTP AND PRETREATMENT PLANT. COMMISSIONING

SAMPLE RACK AND DOSING SKIDS. STEAM BLOW ANALYSIS AND CHEMISTRY

CONTROL. TRAINING

OF LOCAL OPERATORS/CHEMIST.ENVIRONMENTAL ANALYSIS. CCGT - TAIWAN

URS- WGI

2007 -2008 SIEMENS . INDIA COMMISSIONING CHEMIST 1200 MW CCGT.

COMMISSIONING OF WTP PRETREATMENT PLANT. ION EXCHANGE WTP.COOLING TOWER .DOSING SYSTEM ENGINEER. ENVIRONMENTAL ANALYSIS CONTROL AND COMMISSIONING SET-UP LABORATORY AND TRAIN LOCAL CHEMISTS. TRAIN OPERATORS ON CHEMICAL CONTROL. 2006 - 2007 URS . QATAR CHEMICAL TRAINING CO ORDINATOR. CHEMICAL TRAINING COORDINATOR FOR ALL WATER AND CHEMICAL SYSTEMS ON SULPHUR PLANT

QATAR

URS-WGI

2005 -2006 NEW ZEALAND COMMISSIONING CHEMIST . 800 MW CCGT.

COMMISSIONING OF CONDENSATE POLISHING PLANT. CHEMICAL CLEANING

HRSG's.

CCGT -NEW ZEALAND COOLING TOWER

CHEMISTRY SET-UP. DOSING SKID COMMISSIONING. SAMPLE RACK COMMISSION.

DOWNER ENGINEERING STEAM BLOW

CHEM.ANALYSIS AND DOSING.TRAINING OF OPERATORS.SET-UP LABORATORY.

2004 - 2005 URS, IRAQ Chemistry Consultant

ADVISE ON POWER PLANT CHEMISTRY

Sept 2002 – 2004 URS. USA. COMMISSIONING CHEMIST

CCGT Power Plant Responsible for commissioning of Demin Plant Boston MA Provide technical / chemical advice

USA Set-up station laboratory/provide.

Purchase all chemicals for site.

Chemical Analysis .

Operational Training.

June 2001 – July 2002

CCGT Power Plant

Ilijan 1200MW

Batangas

Philippines

LEAD COMMISSIONING CHEMIST

1 Responsible for commissioning of chemical plant

2 Commissioning of HRSG’s

3 Provide technical – chemical advice

4 Provide chemical training to operatives

5 Commission Water Treatment Plant

Sept. 2000 - Feb. 2001

CCGT Power Station

Damhead Creek

Hoo, Rochester

Kent, England

COMMISSIONING CHEMIST

1 Responsible for commissioning of chemical plant

2 Commissioning of HRSG’s

3 Provide technical – chemical advice

4 Provide chemical training to operatives

Feb. 2000 – June 2000

CCGT Power Station

Kingston-upon-Hull

England

COMMISSIONING CHEMIST

1 Responsible for commissioning of all chemical plant 2 Commissioning of start-up boilers, secondary boilers and main boilers

3 Routine analysis of all cooling waters and associated plant

Nov 1998 – April 1999

CCGT Power Station

Marmara

Turkey

COMMISSIONING CHEMIST

1 Responsible for commissioning of heat recovery

boilers, water treatment and desalination plants

2 Set-up feedwater/boiler dosing regimes

3 Monitor commissioning of Water Treatment plant

4 Chemical analysis of Demin. Water

5 Analysis of Desal. Water prior to handover

6 Analysis of Auxiliary Boilers

7 Oil analysis of Fuel Oil

8 Environmental control of discharges to water

9 Training of Turkish nationals in power plant

chemistry

July 1997 – July 1998

CCGT Power Station

Tripoli

Lebanon

COMMISSIONING CHEMIST

1 Commissioning Water Treatment Plant

2 Commission Auxiliary Boilers

3 Commission Heat Recovery Boilers

4 Commission Desalination Units

5 Commission Waste Water Treatment Plant

6 Oil sampling and analysis of fuel oil

7 Independent water analysis of all systems prior to hand over

April 1997 – June 1997National Power

Jaixing

China

CHEMIST/ENVIRONMENTALIST

1 Due diligence of CHP for National Power

2 Chemically assess power plant

3 Check environmental authorization compliance and environmental risk

4 Advise on future training requirements for Chinese nationals

1970 – April 1997

National PowerPembroke Power Station

Pembroke

STATION CHEMIST

1 Provide a chemical service to the station

2 Carry out observations and monitoring on various sections of the plant to ensure safety requirements 3 Responsible for technically assessing the

performance of the chemical services of the statin including the auxiliary plant

4 Advise the production department of shortcomings or deviations from agreed standards



Contact this candidate