Post Job Free

Resume

Sign in

Project Manager Electrical

Location:
Kottayam, Kerala, India
Salary:
5000
Posted:
July 10, 2023

Contact this candidate

Resume:

AJAY ALEX/ELECTRICAL ENGINEER

Mobile No : +91-730*******

E-mail :adx68h@r.postjobfree.com

OBJECTIVE

Looking for a reward career to utilize my skills and abilities in a reputed organization that offers both personnel and professional growth while being resourceful, innovative and flexible” . PROFILE SNAPSHOT

‘ 9 years’ 0f experience in Kerala & UAE in the field of Electrical Projects for Installation, Testing &commissioning and Quantity Surveying .

EDUCATION

BE-EEE (Anna University Chennai) Batch 2009-2012 GPA=59.97% Rajiv Gandhi College of Engineering, Sriperumbudur, Chennai, Tamil Nadu, India.

Diploma-Electronics (Kerala Technical Board) Batch 2006-2009 Percentage=72%

Government Polytechnic College Kaduthuruthy, Kottayam, Kerala, India

HSE (Board Of Higher Secondary Examination Government Of Kerala) Batch 2004-2006 Percentage=59%

MD Seminary Higher Secondary School, Kottayam, Kerala, India,

SSCL (General Education Department Government Of Kerala )

Batch 2004 Percentage=72%

N.S.S High School Chingavanam, Kottayam, Kerala, India.

NAME OF

EMPLOYER : SWAMY ELECTRICALS KOTTAYAM

POSITION : ELECTRICAL SITE ENGINEER

PERIOD :2012 DECEMBER – 2013 DECEMBER

PROJECT DETAILS

Project Name : MALAYALA MANORAMMA KERALA INDIA

Client : Malayala Manoramma Company Head Office KK Road Kottayam Kerala India

Supervision Consultant : Swamy Electricals Kottayam & P&A Manoramma Kottayam Design Consultant : Swamy Electricals Kottayam

Status : Completed Project

ROLES AND RESPONSIBILITIES:-

• Uninstall all the electrical systems in the premises and measure the quantity

• Arrange materials according to the latest design requirement

• Arrange skilled and unskilled labours as per the requirement

• Detailed checking of the design to be installed in the project

• Dismantle the installed systems according to design requirement and rearrange.

• Install the system as per the design, verify and get approval

• Light System arrangement:

Plastic conduits,Copper Cables, Metal and Plastic Boxes, switches,MCBs,Light DB, Power DB

,VDB and related accessories .

Install the materials as per the design,commission and take detailed report for submission.

• Power System Arrangement:

A) Provide safety atmosphere for working condition for labours . B) Panel Boards, Armoured cables, Earthing Conductors, Breakers and related accessories . C) Installation of all the DBs to the related panel boards with armoured cables,checking the cables with megger and make periodic maintenance as required . D) Install the panel board with Breakers of adequate ratings. E) Testing the incomer and outgoing breakers of the panel board and charging . F) Arrange Supply for the Machines installed in the premises check and charge the rollers running the machines .Make every month check the condition of system and maintenance to keep it in perfect condition.

G) Make Periodic checking of the breakers, cables connected, earthing condition of the panel board, under faulty condition make rearrangement, check, charge, maintain periodical checking and maintenance and report to the works department . H) Facilitate the power supply to motors running in the premises with cables,earthing, capacitor and VFD system and motor control panel to provide control and protection under any overload conditions .Checking of the motor control panel with VFDs should be done to identify the condition of the system and maintain the replacement for proper functioning .

I) Connect all the panel boards to subpanel board in the substation and check the condition and charge with proper testing .

J) Use voltmeter and ohmmeters to test electrical systems . K) Replacement of damaged panel boards by dismantling all the connected conductors to it and install a new panel board with proper allocations to manage the load. L) Get periodic approval from inspectorate for getting government sanction. M) Submit the report for getting project Completion. NAME OF EMPLOYER : RK Electricals Kollam

POSITION : ELECTRICAL SITE ENGINEER

PERIOD :January 2014 – January 2017

PROJECT : Nexa Maruti workshop

PROJECTS:-

• Installation of 250KVA USS, 250 KVA generator set and connected electrics at the Nexa Maruti workshop Iyathil Kollam

ROLES AND RESPONSIBILITIES:-

• Arrange Material for the project as per the design requirement periodically

• Arrange Labours based on the project requirement

• Detailed study of the design to be installed and checked in the project

• Light system section contains of arranging conduits, copper cables, metal boxes switches,MCBs, LDBs, PDBs and related all accessories

• Arrange all the light points as per the design and connect to the switch boards DBs and charge

• High Voltage Systems :

A) Provide safety working condition for labours .

B) Arrangement of Transformer, Generator, MSB panel, sub panels, motor panels, VDBs, Motors APFC panel, Emergency Panel,Motor control Panel STP panel and arrange periodic checking and maintain them to confirm perfect working condition. C) Dressing of all MSB, Subpanel and Panel boards with Breakers, cables, and earthing of proper rating .Check incomer and outgoing in each point . D) All the DBs connected to the panel board with proper cables of Adequate rating checked using megger .

E) Check the busbar size that is capable withstanding the load connected to the Panel board . F) Check Armoured Cable should be properly gland and termination that connected to the panel board to avoid over heating condition. Rearrange and maintain them to ensure supply continuity. G) Check all connected panel boards to the subpanel from that to MSB panel then to the Transformer .

H) Monitor Motors installed as per the rating for the machines to test the vehicles shall be provided with separate motor control panel operated to protect under overload condition . Motor control panel are provided with VFDs to protect under faulty conditions check and maintain electrical system in the VFDs.

I) Motor Provide for irrigation purpose shall be connected to VDBs using separate controllers J) Provide Emergency panel shall be operated under circumstances to counter part the power failure .

K) Ensure MSB and subpanel boards are provide with proper vacancy for future extension for connecting panel boards, motors .

L) Ensure Generator connect to the premise shall cabled, earthed properly to operate under power failure . Control panel shall be properly monitored,its CTS checked . M) Generator oil level, engine and alternator condition checked periodically to known the status of working condition .

N) Arrange the sewage water treatment plant with proper control panel and motors to run the plant for better services. STP panel, motors are checked to ensure proper treatment is going on and maintained for clearance .

O) Transformer shall be of dry type . Earthing Condition, cabling shall be checked,maintained their conductivity level, glanding and termination points properly and connected to MSB panel . MSB panel connected to motors operating for heavy load machines directly and they are installed in heavy protected area for the purpose of ease of repair and maintenance. P) Monitor all panel board working condition, machine level, breaker operating level periodically to find the status proper for the functioning of the premises. Q) Use voltmeter and ohmmeters to test electrical systems . R) Get approval from inspectorate for commissioning . S) Make report of the project and submit .

NAME OF EMPLOYER : SWAMY ELECTRICALS KOTTAYAM KERALA INDIA POSITION : ELECTRICAL SITE ENGINEER

PERIOD : February 2017 – October 2019

PROJECT : SKYLINE PALAZZO KOTTAYAM

PROJECTS:-

• Installation of 250KVA USS, 160 KVA generator set and connected electrics at the premises of Skyline Palazzo Kottayam, Kanjekuzzy .

ROLES AND RESPONSIBILITIES:-

• Arrange Material for the project as per the design requirement periodically.

• Arrange Labours based on the project requirement and provide safe working conditions.

• Detailed study of the design to be installed and checked in the project .

• Light system section contains of arranging conduits, copper cables, metal boxes switches,MCBs, LDBs, PDBs and related all accessories .

• Arrange all the light points as per the design and connect to the switch boards DBs and charge .

• High Tension Works :

A) Arrange Armoured cables require to connect the system to make the flow of supply as per the design .

B) Check the MSB, subpanel, meter panel Motor panel boards are arranged as per the system . Test all panel boards are connected with proper breaker, armoured cable, earthing, busbar size .Monitor all the charged systems in the project with adequate checking, replace them if abnormality condition found to achieve continuity . C) Test using ohmmeter and voltmeter . All incomer and outgoings of all panel boards to ensure the clarification for proper usage and function of the premises. D) Checking of every panel board incomer,outgoings, connected cable, earthing shall be done to make 0% error and overheating .

E) Motors of high HP connected directly to MSB shall be cabled, earthed and provide in a highly protected safe working area of low moisture area to avoid eddy current loss .Those motors are in highly protected location to achieve checking and maintenance . F) Check Motor control panel provided with adequate VFDs to shut down the working under extreme working condition .Based on test result the system condition is altered and maintained under faulty report.

G) Use voltmeter and ohmmeters to test electrical systems H) Ensure MSB panel, Subpanel are provide with adequate vacancy for provision of future extension to allocation additional load to the system. I) Dismantling of existing system shall be done with proper approval and non interfering other system working so that premises could work properly. J) Check the HT incoming breaker are provided with proper rating of MSB panel to avoid over current rating check and maintain the MSB panel till the project is commissioned . K) Verify transformer and generator condition is in proper method,check clearly the cable, earthing glanding and termination in standard . Verify the working by monitoring the status by shunting down the main supply, the charging of emergency panel and generator related systems .Ensure that the situation is in control.

L) Motors working not properly replaced without interfering the working condition of other motor connected

M) Make detailed report of the project and submit for approval. PROJECT DETAILS

NAME OF EMPLOYER : VTECH ELECTRICALS P(LTD) THRISSUR POSITION : ELECTRICAL SITE ENGINEER

PERIOD : NOVEMBER 2019 –August 2022

PROJECT : LANDMARK TOWER 2 CALICUT

PROJECTS:-

• Installation of connected electrics at the premises of LANDMARK TOWER2 LT WORK ONLY ROLES AND RESPONSIBILITIES:-

Establish materials lists and send enquiries to procurement department

Check the materials as ordered

Arrange labours as per the client requirement target

Review Contractor’s shop drawings against the design [tender] drawings for compliance with the design intent and return to project manager with appropriate comments / approval.

Continually review the contractor’s construction schedule during the progress of site works.

Make verification of the work, the laying of conduit,copper cable, switch fixing as per standard

.Dressing of DBs shall be done as per colour coding and load standard .

Connect the every DBs to the meter panel for charging the electrical systems to the project .(as the company did not get the other portion work )

Check the work and verify the as per the design standards undertake prior review of Contractor’s proposed electrical system testing & commissioning methods and schedule

On a spot basis witness electrical system final testing and commissioning.

Submitting of total work done per day and getting sanction of the work and verification of total work

Clarify the pending works and rectify any variations

Get approval from the client for statement

Give up to date measurement after the completion of work using excel . PROJECT DETAILS

NAME OF EMPLOYER : TELCO LLC Abu Dhabi UAE

POSITION : ELECTRICAL QUANTITY SURVEYOR ENGINEER

PERIOD : November 2022 –FEBRUARY 2023

ROLES AND RESPONSIBILITIES:-

Understand the Drawing in detail

Upload the drawing into the plan Swift software

Mark the points of both electrical and low voltage systems

Discuss with senior official if any quantity in the system is found missing and clarify and mark the quantity.

Make Quantity Survey report in excel format in system wise and overall detail wise by exporting it to excel

Take cable length through the drawing and mark the measurement in the schematic

Make overall cable measurement report.

IT SKILLS

Microsoft Office (Word, Excel)

AUTOCAD 2014

Plan Swift 2016

PERSONAL DETAILS

Father's Name : Mr.Mammen Alex

Date of Birth : 04-02-1989

Sex : Male

Passport Number : V5137623

Permanent Address : Grace Maliyil h

Pathamuttom (p.o)

Kottayam

Pin 686532

Reference : Prince (swamy Electricals)

Mob no -91-944*******

: Narayanan Kutty (Vtech Electricals)

Mob no – 91-703*******

: Midhun (Base line)

Mob no – 91-989*******

:JOHN (Rtd electrical inspector)

:Mob no -944-***-****

DECLARATION

I hereby declare that above mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars. Place: Kottayam (AJAY ALEX)

Date: 26/06/ 2023



Contact this candidate