Post Job Free

Resume

Sign in

Material Management Warehouse Technician

Location:
Pasadena, TX
Posted:
July 06, 2023

Contact this candidate

Resume:

Rosa Paredes

adx48u@r.postjobfree.com Contact #

832-***-****

Profile Summary

Bilingual - Fluent in English and Spanish, and experienced in Material Management with 16 years supporting constructions, engineers and procurement to improve/support field construction. Self-starter, detail oriented, ability to organize, prioritize and work under heavy work pressure.

I am very safety conscience and committed to provide/maintain a safe work environment for myself, my team members and all others around me.

Skills

•Bilingual – English and Spanish

•Basic knowledge of Microsoft Word and Excel

•Experienced in reading construction blueprints

•Experienced in the Shipping and Receiving field.

Education/Training:

•Certificate W-100 combination welding, American Weld Testing School

•Warehousing, Material Practices

•Fluor Material Management “MatMan” Database – Fluor

•GED Houston Community College

•Different Modules for ABC Learning Training- San Jacinto College, South Campus

•NCCR Welding 1 (Fluor Training Center)

Professional Experience

Zachry Industrial Inc, Baytown, Tx

Warehouse Journeyman 9/2022-3/2022

Identifying the pipes to send them to the fabrication shops and to the designated site. Duties also involved receiving in and marking the shipments of pipes.

Lyondell, La Porte, Tx

Warehouse Attendant 7/2022-9/2022

Austin Industrial

When using SAP, making sure the items received on are accounted for. Expediting items and consumables to their appropriate job locations.

Lubrizol, Bayport, Tx

Tool Room Attendant: 4/2022-6/2022

S&B Construction (Shutdown)

Issued tools to the appropriate jobs, receiving in orders, and making a quality check on the items intended for the job.

Formosa, Port Lavaca, TX

Material Management: 3/2019 to 6/2020 (ROF)

PCL Construction Inc.

Warehouse technician responsible for organizing and coordinating incoming and outgoing materials, receiving and issuing materials to field crews, material inventory, tracking purchase orders. Other duties included managing the tool room, following up with vendors on a daily basis on critical path items and performing inspections on received materials to assure shipments were accurate and materials arrived undamaged. Also supervise the materials being loaded on the proper in-plant trailers for delivery to designated field location(s).

Dow Chemical/Dow Gulfstream Project, Freeport, TX, USA

Material Management: 11/2013 to 03/2017

Fluor Construction Inc.

Warehouse technician responsible for organizing and coordinating incoming and outgoing materials, receiving and issuing materials to field crews, printing Pick and BOMS tickets, material inventory, data entries, tracking purchase orders. Other duties included following up with vendors on a daily basis on critical path items and performing inspections on received materials to assure shipments were accurate and materials arrived undamaged. Also supervise the materials were being loaded on the proper in-plant trailers for delivery to designated field location(s).

Total Petro Chemical DCP Project, Port Arthur, TX, USA

Material Management: 07/2009-07/2012

Fluor Construction Inc.

Warehouse technician responsible for material inventory count and supervise that the material were issued per engineering ISO. Weekly reports to maintain material stocked and create request orders when material needed for sub-contractors. Assist procurement team, maintain files and track materials.

Shell Refinery, Pasadena, TX, USA

Field Expeditor: 01/2008-06/2008

S&B Engineering & Construction

Field Expeditor responsible for all material deliveries. Work closely with material coordinator to assure required material is received and expedited to construction area. Keep an urgent spreadsheet of hot material and interact daily with warehouse personnel. Check status of material and when it will be delivered/ready for pickup. Inventory and inspect all material.

BP Texas City Refinery, Texas City, TX, USA

Pipefitter Helper/ Time Keeper Assistant: 01/2007 – 12/2007

P2S

Pipefitter/Assistant responsible for checking material, track daily welding productivity, assist with material expediting, assuring material needed for each line was in stock and ready to be used. Other responsibilities included were to assist time keepers, work with underground crew, create reports of production for the GF and Superintendent, bolt up pipe fittings and assist with revision of isometric drawings as needed.

Valero Refinery, Houston, TX, USA

Document Control: 01/2006 – 12/2006

Shaw Construction

Piping Document Control; Responsibilities included filing documents, provide copies of drawings as needed per construction. Print and track all documentation provided from warehouse. Confirm any spec’s, MSDS and MTR’s were with each permanent material folder attached with purchase order.

PRSI Refinery, Pasadena, TX, USA

Field Expeditor: 01/2005 – 12/2005

P2S

Field Expeditor; Responsible for all material deliveries, work closely with material coordinator to assure required material is received and expedited to construction area. Keep an urgent spreadsheet of hot materials and interact daily with warehouse personnel. Check status of material and when it will be delivered/ready for pick up. Inventory and inspect all material. Also responsible of bagging and sacking material and other related duties pertaining to warehouse.



Contact this candidate