Joshua Miller
**** ******** **. **** *******, La 70611
Cell: 337-***-****
Email: adx0go@r.postjobfree.com
With 17+ years of industrial construction experience, I am looking for a challenging and stimulating job position to utilize my acquired skills. I have a strong drive to achieve both company and personal goals. I am a very organized individual who likes to ensure that my work is done to an excellent standard. I feel that a career within this environment is very interesting, challenging, and rewarding. My strengths of multi-tasking, close attention to detail, integrity and work ethic is something I pride myself on.
“Safety, quality, and eČiciency are the key factors to accomplishing any job in a safe manner.”
Years of Experience and Work Fields
Pipelines, Refineries, Power Plants, Compressor StaƟons, Chemical Plants, & Industrial ConstrucƟon Environments
6+ Years- ConstrucƟon Coordinator and Piping Supervision 11 Years- Pipe FabricaƟon, Pipe Fiƫng, Vessel Fiƫng/FabricaƟon and Pipeline EducaƟon:
May 1999- High School Diploma/ LaGrange High School CerƟficaƟons :
NCCER- ConstrucƟon Site Safety Supervisor NCCER- ConstrucƟon Site Safety Technician
NCCER- Pipe FiƩer Pipe Fabricator Vessel Fabricator Structure Fabricator SSS-900- Permit Issuer and Receiver Training
Skills:
MicrosoŌ Office Nitro Pro BlueBeam
JSA AudiƟng Permit AudiƟng Problem Solving
AƩenƟon to Detail
Experience:
9-2021 – 5-2023
WyaƩ Field Services
ExxonMobil Mechanical FLS and Field planner
T/A and Majors Projects Coordinator
CoordinaƟon of demo units
CoordinaƟon during Freeze Event of soŌ craŌs
CoordinaƟon of Tank Farm demos
Conducted LPSA’s, LPO’s, and OCVM’s throughout events
Coordinate everyday work between contractors and Ops
Conduct safety audits
WriƟng daily permits and permit audits
1-2020 - 3-2020
NES
ExxonMobil Field Planner
Build Work list for T/A
Create work packages for T/A
Conduct field walk with contractors for quote packages
Enter data into T/A data base to assist scheduling 9-2019 - 1-2020
UP
ExxonMobil Mechanical FLS
Night shiŌ Coordinator over Vessels and Towers During HDC Turnaround
Conduct Chem wash circuits
Conduct Demo and InstallaƟon of new piping of filter pots
Coordinate LPSA, LPO, and OCVM
Conduct Permit Audits
Assisted in Commissioning and Start up
4-2017 - 8-2019
PTS
ExxonMobil Mechanical FLS
Coordinate and execute porƞolio Projects in Exxon Mobil Chemical Plant
Conduct Safety meeƟngs
Conduct update MeeƟngs
Coordinate everyday work with contractors and Ops
Assist in planning of projects
Conduct safety and job audits
12-2016 - 4-2017
Richard ConstrucƟon
Piping GF/ Planner
Oversee crews to install structure, piping, and pumps for CUA Pump segregaƟon project
Started planning and work schedule for CHD Blow Down project 10-2016 - 11-2016
Richard ConstrucƟon
Pipe Foreman
Oversee Pump alignments InstallaƟon of pump piping
Punch items for turnaround
9-2016 - 10-2016
Richard ConstrucƟon
T/A Coordinator (Valero Port Arthur DHT)
Vessel and Tower Coordinator
Observe and Report Progress
Coordinate Task Between OperaƟons and Contractors
Coordinate Task Between Different Contractors
8-2016 - 9-2016
Richard ConstrucƟon
T/A Coordinator (Valero Port Arthur AVU)
Capital Piping Coordinator
Observe and Report Progress
Coordinate Task Between OperaƟons and Contractors
Coordinate Task Between Different Contractors
12-2014 - 7-2016
Richard ConstrucƟon
Piping Forman
Oversee job task
Obtain permits for job task
Order material for job task
Direct crew on job task
Make sure all crew members abide by all safety rules Make sure crew members produce quality work Various locaƟons along the Gulf Coast 10-2014 - 12-2014
WHM
Pipe FiƩer
Verify and make cuts to demo Heater tubes Rig tubes and assist on removal of old tubes Fab new tubes and harps for install
Install and fit up new tubes and harps
6-2014 - 10-2014
Polaris ConstrucƟon
Vessel Fabricator
Read vessel prints and build to drawings Layout nozzles and man ways
Fit up cans and vessel heads by degrees
Fit up nozzles and man ways
Layout structural clips and pads on vessel
Fab and fit up structural pads and clips
Load and move vessels with overhead Crane Fab and installed vessel supports
1-2014 - 6-2014
Richard ConstrucƟon
Pipe Foreman
Oversee job task
Obtain permits for job task
Order material for job task
Direct crew on job task
Make sure all crew members abide by all safety rules Make sure crew members provide quality work ExxonMobil Beaumont
10-2013 - 01-2014
TWS
Pipe Fabricator
Build pipe spools to isometric drawings
Verify all fit ups with QC to specs
Assist welders with overlay in pipe and fiƫngs
08-2010 - 10-2013
Richard ConstrucƟon
Lead Pipe FiƩer
Pipe fabricaƟon
Pipe InstallaƟon
Pipe demo
OperaƟng ForkliŌ
Hauling material
Walking out packages with QC Building punch list 01-2010 - 08-2010
Tradesmen InternaƟonal
Pipe FiƩer
Demo pipe
Pipe fabricaƟon
Pipe InstallaƟon
Removal of vales and restoraƟon of valves InstallaƟon of piping support 09-2009 - 01-2010
Performance Contractors
Pipe FiƩer
Demo piping
Removal and restoraƟon of valves Repairs to vessels
InstallaƟon of new piping
12-2008 - 09-2009
Team Industrial
Specialty Tech
Technical bolƟng
Hydraulic Torque
Machine pipe cuƫng
Hot Taps, Lines stopples, Valve and Leak repair 08- 2008 - 12-2008
Turner Industries
Pipe FiƩer/ Boiler Maker
InstallaƟon of blinds for isolaƟon of equipment Disassembly of exchangers
Assembly of exchangers
Removal of exchangers
InstallaƟon of exchangers
Removal of fin fans
InstallaƟon of fin fans
Hydro TesƟng equipment to restore
11- 2001 - 08-2008
Dunham Price LLC
Plant maintenance/ Mechanic
Heavy equipment Mechanic
Repairs and service all Heavy equipment Cranes
Frontend Loaders
Track Hoes
MiJak cranes
Replace and Repairs to conveyors Replace and Repairs to Hoppers Replace and Repairs to drums Replace and Repairs to structure References:
Kenny Daigle Jr. - Valero 409-***-****
Brian Rogers - ExxonMobil 409-***-****
Trinity Meche - LoƩe 337-***-****
Mike Salinas - ExxonMobil 409-***-****
Taylor Malak - ExxonMobil 409-***-****