Professional Construction Management Profile

●20+ years of experience in Construction Project Field Operations Management, Regional Operations Quality Control Manager, 3-Hat Field Manager, CQCM, SSHO and Superintendent

●Corporate & Field Environmental, Health & Safety Manager Experienced in Federal EM-385 & OSHA 30 Enforcement

●Pre & Post Construction Contract Auditor with Emphasis on Both Pre-Bid & Current Missed and Unforeseen RFI/RFC/Valued Engineered Change Proposals, RFP development, Pre-Contract Mobilization & management on all final closeout documentation.

●Construction Field Management Trainer, Expert level experience as PM, Superintendent, Quality Control Manager, & SSHO, working on Federal Contracts with Oversight QC Responsibility as high as 250 million Dollars on a single contract award.

* Accomplished & Awarded Expertise in Federal Government Construction Project Management & Construction Quality Control & EM-385/OSHA 30 Sire Safety Management. * Current Expertise in 3-Phase CQC Federal Contracts Management with Demonstrated Success in Contract Infrastructure & Organizational Site Safety Management. * Ability to Manage Strict RFP & Spec. Review with a Contract Implementation Expedited Focus on Ensuring Outstanding Performance Ratings in Quality & Safety while Ensuring Production Schedules Meet all Projected Delivery Performance Dates. * Spoke on Behalf of NAVFAC to Local SBA Contractors in RFP Review Criteria * Direct Field Experience in BOA, IDIQ, SABER, MACC, MATOC, Design Build, JOC, SATOC, & 8a Set Aside Contracting Vehicles. * Ability to Ensure Cradle to Delivery of Projects in a Full Operations & Control Capacity; from the initial Marketing & Technical Proposal/ RFP Bid Cost Analysis to the Final Inspection & Product Delivery Closeout of Federal Contracts.

* 100% Career Successful Completion with Outstanding/Excellent Contract Performance Ratings on Every Project Ever Managed - which have included to name a few such high profile builds as :Training Institutions, Several Cryptology Warfare Training Center Design Builds, to Central DOD Command Facilities Management, VA Hospital, 16 Floor Hotel & Casino, NCIS Build, and a large multi-family residential housing complex to then follow through with all final Contract Requirement; Successfully Commissioning Large Chiller/HVAC Mechanical Plants with remote DDC & Security Control Implementations, Testing and Balance, Final Closeout Punch-list Inspections, Fire and Security Testing and Commissioning, Final Print Red Line Verification and Turnover.

Malcom Randall Veteran Affairs Hospital, Gainesville, Florida

Project Site Manager/3-Hat/Superintendent-QC-SSHO

Contract term/Project Completed, 2021-Current, ACE Consulting Inc.

Complete demolition of VA’s Hospital old boiler mechanical plant to include all abatement, controls & electrical.

Performance included punch-out and tie-in of new power plant while coordinating all subcontracting final phase completion and turnover while ensuring all Site Safety & Health OSHA-30/ EM-385 specifications were enforced.

Marine Corps Logistics Base, Albany, Georgia USDA Research Center, Byron, Georgia Naval Construction Battalion Center, Mississippi Stennis Space Center, Mississippi

Project Manager & 3-Hat/Superintendent-QC-SSHO

2015 – 2021, McKenzie Construction

Naval Special Warfare Group/SEAL Aquatics Combat Training Facility

Design Build: Naval seal special warfare aquatics training facility power & mechanical systems included new Lochinvar Boiler Systems & building protective envelop repairs. Successfully overcame challenge of coordination/install while not conflicting with seal training & simultaneously bringing online all mechanical systems with complete factory start-up, T&B, commissioning, final inspection & training.

Naval Construction Battalion Center, Bldg. 241/ 400, Gulfport, Mississippi

Demo & replacement of commercial compressors serving (2) 10,000 SF facility maintenance shops. Fast track project required full demo & install to be performed without facility shut down. Full factory start-up, T&B, commissioning, training & closeout management.

USDA Research Center Design Build, Byron, Georgia

Multi-level government lab research center. Complete & phased occupied demo of all interior -1st & 2nd floors. Involved abatement & roof replacement. Demoed & Installed (2) new rooftop AHU’s & Chiller, (2) mechanical room AHU’s &, boiler, lab exhaust systems on both floors, lighting, & new floors. Managed all Inspections, Factory Start-up, T&B & final functional performance & Commissioning Testing Phases.

Marine Corps Logistics Base, Albany, Georgia

Entire base-wide demo & replacement of all Overhead Fire Doors. Contract included 19 separate warehouse facility location mobilizations throughout the MCLB base which included asbestos abatement/removal of all MCLB warehouse fire doors, wall & block repair throughout all buildings, & install & testing of new fire doors.

Red Horse Readiness Training Facility

Build Contracted Term: Joint Base Charleston, SC., 2014-2015, Ikhana, Inc.

Project Manager/CQCM NAVFAC/USACE 3-Phase Federal Design Build

Work includes construction of a two story 20,800 SF Administration Building & a 10,600 SF Maintenance Building connected by a 3500 SF canopy & courtyard. Exterior construction included a steel frame with CMU exterior, reinforced concrete foundations & floor slabs. Superstructure consisted of a standing seam metal roof over special bar joists including installation of a 5-ton bridge crane & heavy-duty vehicle lift. Both buildings will have CMU & steel stud exterior framing with masonry veneer & metal wall panels. Scope also included installation of new asphalt & concrete, site work, landscaping & incidental related work.

Naval Criminal Investigative Service Headquarters

Build Contracted Term: NAS Corry Field, FL., 2012-14, Huey’s Works Inc.

QCM/SSHO NAVFAC/USACE 3-Phase Federal Design Build

Complete interior demo & replacement of all flooring, ceiling, lighting, doors, finish systems, & HVAC. Installed 2 new bathrooms with new plumbing, toilets, fixtures, wall & finish systems. Demo & replacement of building gypsum board ceilings, 2x4 lay-in ceiling, exhaust fans & grilles, louvers. Remove & replace all electrical system conduits, fixtures, receptacles, raceways, wiring, pull boxes, & Junctions & switches. Install new air handling units, exhaust fans, OA Makeup units, new rooftop units, room conditioning units with DDC control systems. Install new signage, floor tile, carpet, VCT, ceiling tile, sheetrock & paint interior walls, install new polygraph booths, & fire alarm system. Modify fire sprinkler system & install new telecommunications/security systems. All Start-up, TAB, Commissioning & final closeout was performed.

Modify Chilled Water Systems Buildings 3291, & 3209

Build Contracted Term: NAS Pensacola, FL., 2011-2012, Oneida Total Integrated Enterprises Inc.

Superintendent/QCM/SSHO NAVFAC/USACE 3-Phase Federal Design Build

Replaced existing water chiller with (2) new magnetic bearing, centrifugal water chillers.

Installed a new condenser & chilled water pump to serve the new building chillers. Retrofitted two cooling towers’ hot

decks, provided new PVC fill material for both towers, replaced the existing liquid-based condenser water treatment

system with a properly sized solid based treatment system, scraped, primed &

painted all exterior piping above grade, piping & accessible steel surfaces at the cooling towers’ location, Provided

variable frequency drives for existing cooling tower fans, Replaced the two existing chilled water pumps with three

new chilled water pumps, provided two new condenser water pumps, connected DDC controls to new pumps &

variable frequency drives. Also modified piping at each building served (601, 602, 623, 624, 625, & 626) to bypass the

existing booster pumps & provided a balancing valve for each building. Removed all pumps, piping, accessories &

electrical services, replaced all existing 3-way chilled water control valves at buildings 623, 624, & 625 with new 2-way

control valves & initial water treatment for the chilled water & condenser water systems, Provided fundamental chiller

sequencing for all chillers, full factory start-up, TAB, & full commissioning of all new chillers, pumps, VFD’s, & Controls.

Prior to the most recent five-year contract history listed above, Mr. Giberson also had at a minimum of (15) years of successful direct construction & contract management experience during his career. He has also been responsible in his career for the development of many division 1 plans to include Quality Control Plans, Accident Prevention Plans, Environmental Plans, & Activity Hazard Analysis for all division mobilizations. Expertise includes all NAVFAC/USACE contract mobilization compliance requirements. He has been through EM-385 & OSHA 30 training, as well as attended classes at the University of West Florida on Construction Site Safety OSHA Compliance. He has also trained & audited regional construction sites in (3-Phase) Quality Control Management Enforcement & specializes in advance capturing of all RFI’s on contracts & ensuring contract project schedules meet defined deadline & activity completion dates utilizing a strict critical path method approach which ensures outstanding review performance ratings by all government clients. All contracts in his lifetime have maintained a 100% Outstanding Safety & Quality Control Government Performance Ratings

Command Battalion Educational Development Center

Naval Construction Battalion Center, Gulfport, MS.

Build Contracted Term 2010-2011, Summit Construction

Design Build/ Federal Project Manager

Repair & renovation of the educational developmental center at Building 31 was performed in three phases. Repair & renovation included complete removal & replacement of the existing HVAC system; replacement of the exhaust hoods, removal & replacement of all electrical system conduits, fixtures, receptacles, raceways, wiring, pull boxes, Junctions & switches. New install of fire protection system & alarm systems. New designed make up air system in the kitchen area, replacement of the existing flooring & acoustical ceiling panels, replacement of all lighting fixtures, door refinishing/ metal stud framing, & gypsum board walls. Also installed state of art water laser jet cutting for floor shaping & design. All Start-up, TAB, Commissioning & final closeout was performed.

Naval Construction Battalion Center Chapel Renovation - Building 366

Build Contracted Term: Naval Construction Battalion Center Gulfport, MS., 2009-2010, Sweat Inc.

QCM/SSHO NAVFAC/USACE 3-Phase Federal Design Build

Demoed & replaced all carpet & wall base, saw cut, removed, & rebuilt stage concrete portions, Demoed & replaced all

ACT, doors, draper, track, & paneling systems. Removed & replaced all electrical system conduits, fixtures, receptacles,

raceways, wiring, pull boxes, junctions & switches. Installed all new T&G & ACT ceiling, new electrical connectors, plates,

AV racks, panels systems, speakers, projectors, & screens. Painted all new wall finishes, conduit, piping, columns,

T&G, & Trim. new doors, hardware, & thresholds, new trim, box outs, & soffit runs. Installed new insulation systems,

carpet, VCT, Tile & Base. Installed Sheetrock, wall fabric stage system, new furniture systems, new diffusers, plenums,

attenuators, grills, ductwork & piping. Installed new flow balancer, duct liners, supply registers. All building systems

start-up, TAB, & commissioning performed.

Atmore Wind Creek Casino & Hotel Design Build

Build Contracted Term: Atmore, Ala., 2008-2009, Frank Daughtry Architectural & Peterson Engineering

Design Build Architectural & Mechanical Inspections Manager

Managed all 3rd party bank inspections for 250+M CIE Casino Build under Daughtry Architectural & Peterson Engineering. Under this term contract, all architectural & mechanical inspection service oversight was performed following ICC code, spec. & print design build requirements. This contract involved ground-up build of all Architectural & Mechanical build & testing threshold & acceptance requirements. In field division red line print & RFI verification was also under this contract for both casino & 16 story high rise hotel & adjoining gas station. Daily reporting & photo log inspection & testing summaries were documented on every CPM definable feature of work. Under the mechanical inspection requirement, all mechanical & architectural print & spec. testing was verified to meet all requirements including all start up performance & functional / commissioning testing to final closeout inspections. Every submittal item going into the casino was verified & tested as well, including all building envelope & wind testing, down to verifying the 14k gold in glass that went behind a waterfall feature in the casino also met quality & plan specification performance criteria. All site surveys, ground impaction, concrete, weld, structural, exterior & interior builds, all division 26 & electronic installations, (2) large 5,000 SF mechanical rooms including all start-up, commissioning & training were also under Mr. Giberson’s bank enforced QA verification.

MACC IVAN DOD Renovations

NAS Pensacola, FL., 2004 to 2008 Ellis Engineering, Inc.

Southeast Regional QCM Manager/Field Operations NAVFAC/USACE 3-Phase Federal Design Build

Contracted to Ellis Engineering for the Hurricane Ivan MACC Repairs Sow 3, Sow 8

Sow 11 for NAS Pensacola from 2004 to 2008. Served as Regional CQCM over

all MACC/MATOC Contracts & appointed Project Manager for several building renovations which included:

MACC/ Building 1500 Naval International Educational Training Center: This building involved the historical society oversight in the replacement of the terracotta roofing & all copper gutter & downspouts due to Ivan storm damage. Crane safety plan coordination, high lift & fall arrest tie off were critical safety component enforced as part of this project. This was a historical society over-watch project with a design implementation that was under state monitoring.

MACC/ B781-1 Personnel Support Detachment Command Center: This section of Building 781-1 which was the previous location of the personnel support detachment center which involved the complete abatement & renovation of all interior finishes. All building interior work was to take interior to the stud structure, & renovate all interior which included HVAC, Electrical & Communications upgrades.

BOA/ B684 Install New Heating/Make Up Air Recycle Units: This work involved replacement of the rooftop units which also included air recirculation units on the rooftop. Crane safety plan coordination was also involved including a safety roofing plan. A scaffold erection plan was also performed on the west exterior of the building, fall arrest system & tie-off, along with LOTO & all other approved AHA’s were enforced in demo & placement of new equipment.

BOA/ B3744 (2007-2008) Corry Field Cryptology School: This (2) story school involved a complete exterior & interior renovation. Exterior work involved a new roof replacement, all brick repointing & surface cleaning as well as installing a new opening for OA HVAC & sidewalk installation. Interior involved asbestos abatement, all interior door replacement & interior wall & floor finishes, & a new installed fire sprinkler & alarm system. New duct was installed with new fire dampers. All new HVAC & also the installation of two new Liebert Systems installed & a new computer room with raised flooring. Installed all new motion sensor lighting & complete demo & refinish of 4 bathrooms with new accessories. New fountains & stairwell refinishes. All work involved full commissioning & functional performance testing.

Lakehurst Naval Air Station Engineering Station

Facilities Manager/ Base Ops IDIQ Quality Assurance Manager

N.A.E.S., Joint Base Lakehurst/McGuire A.F.B.,1996-2004

Mr. Giberson’s responsibilities included managing all contract IDIQ Quality Control & Construction Site Inspection Surveillance QA programs for the Navy on all renovations, new builds & IDIQ maintenance contracts. From 1998 to 2000, he was directly responsible for the IDIQ facilities management, quality control & safety enforcement inspections of all maintenance IDIQ facilities subcontractors. He implemented safety criteria oversight as well as quality control enforcement over each awarded contract. He also continued this role from 2000-2004 when in charge of all base-wide facilities & continued to have all oversight & enforcement on the IDIQ Contractor’s Safety/Accident Prevention implementation programs as well as all budget control in facility capital IDIQ awarded contractor improvement expenditures of 10.5 million per year. Awarded contractors would perform needed renovations & new builds, & Mr. Giberson was responsible for the federal contract acceptance of this work under NAVFAC P445 QA, awarded RFP, Spec, & EM-385 safety guidelines. Mr. Giberson managed all weekly contractor site QA & safety surveillance reporting & facility QA inspections on the MILCOM funded new multi-family residential housing complex design build, as well as renovations to the Maloney Hotel, & Officers Housing Complex. All QA & safety reporting summaries & deficiencies were reviewed & reported to the base contracting for performance & corrective evaluations. Mr. Giberson ordered all work & maintained all hotel, Officer & Enlisted housing facilities management oversight, subcontractor management, RFP development for new work, QA of subcontractor work acceptance. He represented & reported to the weekly CO meetings on all housing & hotel management reporting. He was awarded several awards including “Best in Industry A” as well as successfully ran all tenant & housing quality of life programs.

Education

Army Corps of Engineers Construction Quality Control Management - Diploma (USACE)-Current 5 Year Authorization

O.S.H.A. 30 Safety—University of West Florida 2007 & 2013, 2015 and 2022 Certified

First Aid & CPR-Current

ECATTS Certification

The Chubb Institute- New Brunswick, NJ 1996-1998-Network Engineering

Ocean County College – Toms River, NJ 1994-1997-Business Administration

Lippert’s Business College – Plainview, Texas 1986-1988-Legal Administration

Consultant -Successful Federal Contract Field Supervision Management Trainer

Continuing Education / Certification Courses:

USACE Construction Quality Control Diploma, OSHA 30 Certification, UWF-Construction Safety,

Construction Project Operations Management Software, Microsoft Certified Data Center Operations Diploma,

Government & Commercial Construction Bid & Administration Software, Software Management Tools Include:

Project Start Up & Sub-Contract Management, Cost Analysis & Bid Estimating Package Development. Knowledge

Base in all Windows; MS Office, Networking, Data Center Implementation, MS Project, Procore, USACE RMS, P6

Scheduling Coordination & RS Means.

Recognitions

Naval Air Engineering Station Outstanding Employee Award

Department of the Navy/Commander of Naval Installations Best in the Industry “A” List Award.

Numerous DOD “Bravo Zulu” Commendations for successful contract executions for meeting all deadlines under High Quality Standards—maintain 100% "Outstanding DD form 2626 Government Contract Performance Reviews.

Successful & Current Relationships Built with all Federal U.S. DOD Government Contracting Offices.

Applied knowledge base in Straight bid, IDIQ, Design Build, Sole Source 8a, SBA 8a Regulations, Match Spec. Bid, MACC, SATOC, BOA & many more.

Skills

NAVFAC Construction Project Operations Management, NAVFAC/USACE Construction, NAVFAC Site Safety Health Officer, 3-Phase USACE/NAVFAC Quality Control & Field Contract Management, Field Construction Operations Contract Trainer & Auditor, all CSI DOD Trade Quality Control & Spec Verification, USACE/NAVFAC Design Build Project & CQC Management, EM 385 & OSHA 30 Safety/Environmental Implementation Management, Accident Prevention Plan, Activity Hazard Analysis & Critical Safety & Lift Plan Development. P6 Scheduling Critical Path Management, Schedule of Values & Monthly Invoicing Verification of Percentage Built Administration, DOD FAR/DFAR Clause Contract Performance Criteria Enforcement. Knowledge base in all Microsoft Office Applications; Excel, Word, PowerPoint, MS Project & more, also Construction software as Procore, RMS, WebCM, Smartsheet, RS Means & many more.

Recent Outstanding Performance Awarded

Construction Management Experience