`
CURRICULUM VITAE
P. KARTHIK B.E. (Mechanical)
TEN (10) YEARS ABOVE OF EXPERIENCE
SAUDI ARAMCO APPROVED QC INSPECTOR
SENIOR INSPECTOR - QA/QC/WELDING/PIPING
WELDING INSPECTOR – CSWIP – 3.1
SHUTDOWN INSPECTION - 03 nos.
ASNT LEVEL - II - PT, MT, RT & UT
Email ID: *************@*****.***
Mobile No.: +65 90873244 (Singapore)
FIN: M4221466X
CARRIER OBJECTIVE
Highly professional and dedicated Senior QA/QC inspector with over 10 years of extensive experience in the field of Quality Assurance/Quality Control Management, inspection, Welding, Piping, structure, pressure vessel, storage tank and NDT in Oil & Gas and Petrochemical Industry and MRT Station Project. Exceptional communication & interpersonal skills blended with superior team management & leadership skills. Major projects worked in Saudi Arabia, Qatar & Singapore, India. CERTIFICATIONS
ARAMCO APPROVAL:
SAUDI ARAMCO - APPROVED QC WELDING INSPECTOR
SAUDI ARAMCO - APPROVED QC PIPINGINSPECTOR
SAUDI ARAMCO - APPROVED QC WELDING INSPECTOR
Certification:
CSWIP 3.1 - CERTIFIED WELDING INSPECTOR (84919/2)
LIQUID PENETRANT TESTING (PT)
MAGNETIC PARTICLE TESTING (MT)
RADIOGRAPHIC TESTING (RT)
ULTRASONIC TESTING (UT)
Safety Course:
• Work at height course – Supervisor
• Supervise workplace safety and health in process plant
• Supervise work in confine space operation.
• Boom Lift operation
`
Page 2 of 7
KEY SKILLS
Review and comment contractor quality document submittals (Quality plans, Inspection & test plans and procedures) to ensure effective controls are in place in key areas.
Lead and supervise contractor QA/QC team to safely execute the inspection activities by and providing technical guidance, procedural support to ensure completion and compliance with project specifications, codes and standards.
Coordinating and attending weekly QA/QC meetings to expedite progress and site quality issues and interface with management as needed during resolution of quality issues. Provide weekly and monthly reports on shop and site quality.
Perform construction quality audits on the contractor’s fabrication and field works: Receiving of material at site and fabrication shop. Material traceability once it is issued for use. Welding inspection throughout the process plus any NDE, PWHT, Hardness test, ferrite test, PMI and pressure testing.
Witness / review WPS / PQR, welder qualification and monitor welder performance
Witness NDE and radiography film interpretation, selection of proper inspection / NDE techniques as per codes/standards and specification. Monitor and evaluate NDE investigations.
Witness selected testing and holds points as indicated in the contractor’s ITPs.
Review piping hydro test packs, participate in piping pre-Hydro walk down, witness Hydro, reinstatement. JOBS HANDLED
PIPING
HEAT EXCHANGERS
COLUMN
VESSELS
VALVES
TANKS
STEEL STRUCTURAL WORKS
PROFESSIONAL EXPERIENCE - 8
COMPANY NAME: CUTECH QUALITY SOLUTION PTE LTD - SINGAPORE
DESIGNATION : QA/QC WELDING INSPECTOR
CLIENT : STERLING ENGINEERING, (WOH HUP – STEC)
PROJECTS HANDLED: BAYSHORE MRT STATION (THOMSON EAST COST LINE IN BEDOK, TE-29) DUTIES:
Review and approval of sub-contractor’s Quality plan, Method of Statement/Fabrication procedure, Inspection &Test Plan (ITP)
Reviewing of Welding procedure Qualification (WPS), Procedure Qualification Record (PQR) and Welder performance qualification tests (WPQ) & Witnessing the PQR and WPQ
Performs inspections in new construction steel structure based on AWS D1.1
Entrance columns and beams during welding verified fillet size.
Continue monitoring welding Activates in workshop and verified welder number, welding machine and electrode, during welding verified current and voltage. process that is similar to metal active gas (MAG) welding. FCAW uses a continuous wire fed electrode, a constant-voltage welding power supply, and similar equipment to MAG welding.
Material inspection as an ITA inspector for I BEAMS, Pipes, Plates at N103 project.
Witness bolt torqueing 50% and 100%method.
Cooling Tower and vent shaft welding continue monitoring
Review of ITP, WPS and welder certificates and verifying it with required codes.
Review of material certificates and verifying its chemical composition and its properties
Witnessed the NDE (UT, MT) as per project requirements
Witness Fit up inspection, welding inspection of Beams, Columns,
`
Page 3 of 7
Witness dimensional inspection of beams and columns,
Witness and verification of Fit up, Welding, dimension, NDT such as PT, UT and MT.
Witness material inspection as per the MTC, review material test reports, NDE reports and final release report.
PROFESSIONAL EXPERIENCE - 7
COMPANY NAME: DANEM ENGINEERING WORKS W.L.L. – DOHA - QATAR
DESIGNATION : QA/QC ENGINEER
EXPERIENCE : 01 OCTOBER 2021 TO 08 JANUARY 2022
CLIENT : QATAR FERTILIZER COMPANY (QAPCO) & QATAR PETROLEUM COMPANY (QAPCO)
PROJECTS HANDLED: SHUTDOWN MAINTENANCE IN QAFCO & QAPCO PLANT FOR AMMONIA & UREA
DUTIES:
Review and approval of sub-contractor’s Quality plan, Method of Statement/Fabrication procedure, Inspection &Test Plan (ITP), Hydrostatic test procedure, NDT procedures, PWHT procedure, Hardness test procedure, Material control procedure, etc.
Reviewing of Welding procedure Qualification (WPS), Procedure Qualification Record (PQR) and Welder performance qualification tests(WPQ) & Witnessing the PQR and WPQ
Performs inspections in new construction piping based on ASME B31.3
Performing in-service plant inspection and integrity duties on Piping Circuits, Pressure Systems (static equipment)-Heat exchangers, vessels, drums, etc. and Tanks in line with API-510, API 570, API 653 and Company specifications and applicable procedure & preparing reports with appropriate recommendations
In-service / shutdown inspection of most fixed equipment’s in a plant, such as storage tank, pressure vessel, reactor, vessel, exchanger, etc.
Internal and external inspection and corrosion monitoring of fixed Equipment’s such as storage tank, pressure vessel reactor vessel, exchanger, etc.
Planning long-term plans for fixed equipment and providing guidelines on the repairing and maintenance procedure of fixed equipment
Surveillance activities of Piping / Mechanical construction and testing works at site as required by inspection and test plans to verify product conformity and full compliance with engineering.
Lead preparations of hydro test packages perform line walk, and preparation of punch list, coordinating with other departments to close the punch items, witness the Hydro test/Pneumatic test, and reinstatement inspection.
Guiding the control of welding/ repair, review & interpretation and witness other NDT for piping & structural work; carrying out the stage wise inspection for piping pre-fabrication, tank fabrication/erection welding and reviewing sub-contractor as per specifications.
Verify quality control documentation in the form of inspection and test plans and method statements and work instructions and inspection records / test certificates are available prior to work commencing.
Evaluating the NDT methods like PT, MPT, UT, RT and report preparation; monitoring fit-up, welding consumables, pre-heating, in process welding, weld visual check, etc.; interfacing during fabrication and installation to resolve any welding and inspection related problems.
Daily arrant the RT work schedule
RT film evaluation as per the given code or given client specification and to prepare the RT report
Two monitors prepare RT reports, time sheet, job completion status for RT team COLUMN MAINTENANCE:
External Activities:
o Blinding/De-blind
o Man, ways opening.
o Valve replacement
o LG (level gauge remove cleaning)
`
Page 4 of 7
o Safety valve removal and calibration.
o LT (Level transmitter removal and calibration) Trays removing/Installation. o Internal tray valve installation.
o Tray removing and new installation.
o Internal shell and trays cleaning.
o Tray removing and new installation.
o Demister pad removing and new installation.
o Internal repair and inspection NDT, UT, and others as required. Trays Installation:
Confirm the work permit is an open and blinding is a compited, after opening the man ways and start the internal activity. (This is Internal activity means need confined space entry permit and Follow the CSE procedure.)
o Trays removing start from top to bottom.
o During the Trays remove write all trays numbers and circle numbers. Example circles A tray 1,2,3. o Removed trays shift at ground level.
o Trays clean by hydro-jetting or manual.
Tray replacement:
o The new tray is an installation method, makes a circle at the ground level as per the drawing and marked numbers
o Compare old and new circles are equal then the inspector gives that clearance then starts the installation.
o If any types have confusion or trays are a mismatch then call vendor or site engineer PROFESSIONAL EXPERIENCE - 6
COMPANY NAME: L&T CONSTRUCTIONS LIMITED. - CHENNAI - INDIA
DESIGNATION : QA/QC INSPECTOR
EXPERIENCE : 13 MAY 2019 TO 05 JANUARY 2021
CLIENT : ONGC
PROJECT : KG-DWN 98/2 INTEGRATED SURF + SPS.
DUTIES:
Consumable inspection, visual, dimension, verification of correctness, identification and correlation with manufactures test certificates.
To Check Welder id, Welding Consumables, Machine set up and give permit ion to welder to weld.
To check the welding parameter like voltage, amps, travel speed.
Experience in piping and pressure vessel inspections, preparation/review of piping pressure test packs and leak testing, Able to perform piping walk downs before hydro test and reinstatement and system walk down after hydro test and populate/Monitor close out of punch lists items.
Daily arrant the RT work schedule
RT film evaluation as per the given code or given client specification and to prepare the RT report
Two monitors prepare RT reports, time sheet, job completion status for RT team PROFESSIONAL EXPERIENCE - 5
COMPANY NAME: TEKFEN CONSTRUCTION & INSTALLATION – SAUDI ARABIA
DESIGNATION : QA/ QC WELDING INSPECTOR
EXPERIENCE : 07 JANUARY 2019 TO 10 MAY 2019
CLIENT : SAUDI ARAMCO
PROJECT : SATELLITE GAS COMPRESSION PIPELINE PROJECT (SAGCP) DUTIES:
`
Page 5 of 7
Welder performance evaluation.
Inspection of Manual and Automatic Mainline, Tie-In welding
API 1104, ASME Section V and relevant project specifications.
ExecutingthespecificinspectiononAutomaticandManualweldingof46” DiaPipelinefor 202km.
Monitored Welding parameters & inter pass temperature and Post heat as per WPS and PQR.
Conducted Welder qualification test as per API 1104 & Training programs.
To check the Fit-up stage prior and confirm that root gap, off set, bevel angle is within acceptable limit or as per WPS. Before, during and after welding inspections.
Reviewing MTC of carbon steel (API 5L X70, ASTM A106 GR b A671CC60 A672C60, ASTM A105).
Witness PMI (Positive Material Identification) tests, when required.
Evaluating the NDT methods like PT, MPT, UT, RT and report preparation; monitoring fit -up, welding consumables, pre-heating, in process welding, weld visual check, etc.; interfacing during fabrication and installation to resolve any welding and inspection related problems.
Headed heat treatment activities.i.e., PWHT, Pre heat and Post heat.
Carried out Inspection Data Management system including periodic updates.
Fit up inspection fabrication and erection.
Witness Bolt torqueing, flange face inspection gasket verification as per ISO Drawing.
Witness hydro test, service test of piping systems.
Prepare RFI as per Aramco SAIC as per requirements.
Have knowledge in SAES, SAEP, SAIC, SATR, SATIP.
Inspected Materials for Piping and Structural. As per ASME SEC II PART A, B AND C ASME B31.3, AWS D1.1.
Inspect hydro test pneumatic test, flange bolting and gasket verification.
Inspected Alignment and Orientation for piping. As per WPS and Specification.
Witnessed VT, PT, MT & RT NDT Methods.
Inspection of RFI and final submission to client.
Review and interpretation of NDT reports and acceptance of welds, pipes and fittings as per ASME B&PV SEC V (VT, PT & MT), ASME SEC II, ASME SECIX.
To Check Welder id, Welding Consumables, Machine set up and give permit ion to welder to weld.
To check the welding parameter like voltage, amps, travel speed.
Experience in piping and pressure vessel inspections, preparation/review of piping pressure test pa cks and leak testing, Able to perform piping walk downs before hydro test and reinstatement and system walk down after hydro test and populate/Monitor close out of punch lists items.
Daily arrant the RT work schedule
RT film evaluation as per the given code or given client specification and to prepare the RT report
Two monitors prepare RT reports, time sheet, job completion status for RT team PROFESSIONAL EXPERIENCE - 4
COMPANY NAME: ARKAD ENGINEERING & CONSTRUCTION COMPANY(EPC) – SAUDI ARABIA
DESIGNATION : QA/ QC WELDING INSPECTOR
EXPERIENCE : 03 MAY 2016 TO 09 SEPTEMBER 2018
CLIENT : SAUDI ARAMCO
PROJECT : MASTER GAS SYSTEM EXPANSION PHASE – II (PIPELINE PROJECT)
`
Page 6 of 7
DUTIES:
Fit up inspection fabrication and erection.
Witness Bolt torqueing, flange face inspection gasket verification as per ISO Drawing.
Witness bolt tensioning 50% and 100%method.
Welder performance evaluation.
Inspection of Manual and Automatic Mainline, Tie-In welding
API 1104, ASME Section V and relevant project specifications.
Have knowledge in SAES, SAEP, SAIC, SATR, SATIP.
Inspected Materials for Piping and Structural. As per ASME SEC II PART A, B AND C ASME B31.3, AWS D1.1.
Pipeline are used to transport gas, water, oils and other liquids from one point to another.
And as all pipes are produced at a fixed length, there is a requirement of welding to join pipes and make kilometer of pipelines 226km North and East region pipeline project, pipe dia 46inch
So, pipeline welding is a very important activity in pipeline construction and is always a demanding profession.
Pipe and Pipeline welders are required in construction industries, Oil and Gas Fields, Water industries, fabrication shops, nuclear energy industries, Ect. to law new pipelines or repair an old pipe.
Pipeline welding is popular as girth welding which is performed alone the circumference of the pipes to be connected
As compare to pipe welding as usual plans, pipeline welding position various additional challenges
Pipeline welding should conform to the relevant ASME codes like B 31.4, B31.8, ASME BPVC Etc.
Daily arrant the RT work schedule
RT film evaluation as per the given code or given client specification and to prepare the RT report
Two monitors prepare RT reports, time sheet, job completion status for RT team PROFESSIONAL EXPERIENCE - 3
COMPANY NAME: CHINA PETROLEUM JILIN CHEMICAL ENG.& CONSTRUCTIONCO.LTD. – SAUDI ARABIA
DESIGNATION : QC INSPECTOR
EXPERIENCE : 14 DEC 2014 TO 11 JAN 2016
CLIENT : GS & CA ARABIA Ltd
CONTRACTOR : SAUDI ARAMCO & SUMITOMOCHEMICAL
PROJECT : RABIGH II REFINING AND PETROCHEMICAL PROJECT(CP3&CP4) DUTIES:
Responsible for quality assurance processes in aviation manufacturing products.
Perform manual inspection during process using various measuring instruments.
Performs close tolerance acceptance inspection of complex manufactured components, sub– assemblies, and complete requiring numerous steps in the manufacturing process, produced on a wide variety of conventional and numerical controlled machine tools.
Used the Geometric Dimensioning & Tolerance inspection by using related measuring instruments.
Responsible for the welding inspection and mechanical inspection of Pressure Vessels & Power Project Pressure Parts Piping
Monitor the fittings like flange to pipe & valves
Carry out material traceability, fit-up inspection, dimensional inspections, line check, hydro test reinstatement, material control, witnessing NDT activities, punch list clearing, document control, test Pack
`
Page 7 of 7
Monitor the execution of proper fabrication methods subjected to quality requirements at different stages as per QC plan
Prepare inspection reports and documentation works as Quality standards
Daily arrant the RT work schedule
RT film evaluation as per the given code or given client specification and to prepare the RT report
Two monitors prepare RT reports, time sheet, job completion status for RT team PROFESSIONAL EXPERIENCE - 2
COMPANY NAME: NASSER S.AL-HAJRI COLTD - QATAR
DESIGNATION : QC/WELDING INSPECTOR
EXPERIENCE : 10 JULY 2012 TO 03 JANUARY2014
CLIENT : RAS GAS, RASLAFFAN, QATAR
CONTRACTOR : JAPAN GAS CORPORATIONS
PROJECT : BARZAN ONSHORE PROJECT
DUTIES:
Fit up inspection fabrication and erection.
Witness Bolt torqueing, flange face inspection gasket verification as per ISO Drawing.
Witness bolt tensioning 50% and 100%method.
Witness and check various valve installation ball MOV check plug control etc.
Alignment inspection of rotary connections, fin fan connections and relief valve Installation, alignment and bolt torqueing inspections.
Preparation of hydro test package, pneumatic testing.
LinecheckingasperlatestISOandP&IDdrawingsmakingpunchAwithlatestdrawing as per requirement.
Witness hydro test, service test of piping systems.
Material verification bolts nuts as per service requirements.
Witness and check instrument connections.
Prepare RFI as per Aramco SAIC as per requirements.
Have knowledge in SAES, SAEP, SAIC, SATR, SATIP.
Verify support drawing fit up, tolerances and orientation.
Check and clear reinstatement punch B and final line checking.
Good practical, theoretical knowledge in the interpretation of drawings, working knowledge of international codes, specifications and QA/QC procedures.
To visit the construction site daily to check whether all works, materials, equipment’s are in accordance with QA/QC program, Project drawing &specification.
Verification of isometric sketches and marking joint numbers or as-built isometric.
Inspected Materials for Piping and Structural. As per ASME SEC II PART A, B AND C ASME B31.3, AWS D1.1.
Inspect hydro test pneumatic test, flange bolting and gasket verification.
Inspected Alignment and Orientation for piping. As per WPS and Specification.
Verification of Inspection & Test Plan for Piping, Structural Works.
Inspect materials as per ISO and Specification.
Day-to-Day of fit-up, weld visual inspection & Surveillance of piping & equipment’s erection works at site.
Daily arrant the RT work schedule
RT film evaluation as per the given code or given client specification and to prepare the RT report
Two monitors prepare RT reports, time sheet, job completion status for RT team
`
Page 8 of 7
PROFESSIONAL EXPERIENCE - 1
COMPANY NAME: SHRIDI SAIINDUSTRIES – TRICHY - INDIA
DESIGNATION : QC INSPECTOR (WELDING & PIPING)
EXPERIENCE : 04 FEBRUARY 2010 TO 10 APRIL 2012
DUTIES & RESPONSIBILIES:
Witnessed VT, PT, MT & RT NDT Methods.
Visual inspection of Completed welds. As per Codes and Std.
Maintaining NDT reports and Weld history sheets.
Maintaining the entire QC related documentation.
Maintaining Project records, reports, and final submission to client.
Daily arrant the RT work schedule
RT film evaluation as per the given code or given client specification and to prepare the RT report
Two monitors prepare RT reports, time sheet, job completion status for RT team ACADAMIC TRACK PROFILE
BACHELOR OF TECHNOLOGY (B.E. - MECHANICAL)
Institution : Roever Engineering College, Perambalur.
Percentage : First Class
Year of Passed: 2010
H.S.S.C (12TH)
School : Government Boys Higher Secondary School.
Year of Passed: 2004
S.S.C (10TH)
School : KM Boys Higher Secondary School.
Year of Passed: 2002
PERSONNEL DETAILS:
Date of Birth : 17.05.1988
Father’s Name : Mr. R. Panchalan
Permanent Address : 9B/1C, Sivan Kovil Street, Adirampattinam, Thanjavur (Dist), Tamil Nadu
Marital Status : Married
Languages Known : Tamil & English [Read, Write & Speak]
Passport Details : No. U4382860 Date of Expiry: 23.08.2030 DECLARATION
I hereby declare that the information furnished here is true to the best of my knowledge. Yours truly,
P. KARTHIK