Jasen Blaylock
Groves, TX *****
*************@*****.***
Summary
I’ve worked in refinery, chemical, power generation, foods, and construction field for 15 years, 8 of those years in quality, and planning. 5 years as a CWI. I perform well as an inspector, field lead, or client rep working in new construction, maintenance, and turn arounds.
Employment History
Randstad Engineering – Burns & McDonnell
Field Quality Manager – Weston RICE
Mar 2023 - Present
• Coordinating sub-contractors work fronts
• Verify bolt ups for bolts, gaskets, fit up, seating surface
• Witnessed/signed off testing with QC
• Walk mechanical packages with QC for sign off
• Verify installation of equipment setting
Randstad Engineering – Burns & McDonnell
Field Quality Manager – ADM Utility Sustainability Project October 2022 – Mar 2023
• Responsible for verifying all welding on site
• Coordinating sub-contractors work fronts
• Verify bolt ups for bolts, gaskets, fit up, seating surface
• Witnessed/signed off testing with QC
• Walk mechanical packages with QC for sign off
• Verify installation of equipment setting
• Dealing with AI for boiler sign offs
Randstad Engineering – Burns & McDonnell
Field Quality Manager - Schwans Project Jayhawk
Salina, KS
November 2021 – October 2022
• Responsible for verifying all welding on site
• Coordinating sub-contractors work fronts
• Verify bolt ups for bolts, gaskets, fit up, seating surface
• Witnessed/signed off testing with QC
• Walk mechanical packages with QC for sign off
• Verify installation of equipment setting
S&B Engineers and Constructors – Lead QC
Cheniere LNG – August 2021- October 2021
Johnson Bayou, LA
• Walking mechanical packages for completion with client QA
• Witnessed testing with Client QA
• Verify bolt ups for bolts, gaskets, fit up, seating surface
• Inspect welding throughout entire process.
• Coordinate NDE
Kiewit - QC Inspector
Venture Global, LNG April 2021 – August 2021
Cameron, LA
• Walking mechanical packages for completion with field engineers
• Weld inspection at fit up, in process, final, and NDE coordination throughout the process.
• Quality Lead over testing ie; hydro, pneumatic
W.G Yates - Quality Control Inspector
EKPC Project Aug 2020 - February 2021
Maysville, Kentucky
• Walk down piping, civil, structural for completion with Client QA
• Witnessed testing of piping systems
• Verify bolt ups
• Perform system turnover walks with client
• Review P&IDs, ISO’s, Specs
• Compile inspection/surveillance reports
• Received Operator qualification/certification for Polyethylene Joining and Equipment operations
• Worked closely with personnel operating polyethylene joining machine to verify joints were correctly done.
Worley Parsons - Quality Assurance
Bayer/Monsanto Dicamba Project July 2019 – June 2020 Luling, LA
• Walk down piping, civil, structural packages for completion with Bayer QA
• Verify punch list items
• Testing; Pneumatic, Hydrostatic
• Verify bolt ups
• Perform system turnover walks with client
• Review P&IDs, ISO’s, Specs
• Compile inspection/surveillance reports
Aptim Maintenance – Site QC Lead
Citgo, B1E Boiler Rebuild March 2019 - June 2019
Lake Charles, LA
• Build and manage piping, civil and structural packages according to Client Specs
• Track Welders using weld logs
• Verify torqueing and flange mapping
• Verify welders are following WPS, PQR’s•
• Verify welders are certified/qualified via WPQ’s
• Verify installation and paperwork was done per requirements of the state of Louisiana.
• Walkdown for mechanical completion
ParFab Field Services - Site QC Manager
Tier 3 Can Heater Project January 2019 - March 2019 Texas City, TX
• Build and manage piping, civil and structural packages according to Client Specs
• Track Welders using weld logs
• Verify torqueing and flange mapping
• Verify welders are following WPS, PQR’s•
• Verify welders are certified/qualified via WPQ’s
• Walkdown for mechanical completion
• Sell off systems that are tested(hydro/pneumatic)
• Maintain good working relationship with client and all subcontractors. ParFab Field Services - Site QC Manager
Lyondellbasell Air Pre-heaters September 2018- December 2018 Pasadena, TX
• Build and manage piping, civil and structural packages according to Client Specs
• Track Welders using weld logs
• Verify torqueing and flange mapping
• Verify welders are following WPS, PQR’s•
• Verify welders are certified/qualified via WPQ’s
• Walkdown for mechanical completion
• Sell off systems that are tested(hydro/pneumatic)
• Maintain good working relationship with client and all subcontractors. Elite Turnaround Specialists – QC Inspector
March 2018 - September 2018
• VT welds throughout the day
• Verify MTRs and make sure all fittings/piping matched spec
• Weld map as needed, flag welds for Nde.
• Verify dimensions are per the drawing
• Coordinate with production to get issues resolved.
• Make sure all spools are complete and ready for paint or PWHT Parfab Field Services - Site QC Manager
NatGas July 2017 – March 2018
Beaumont, TX
• Build and manage structural, civil, and piping packages according to Client Specs
• Track Welders using weld logs
• Verify torqueing and flange mapping
• Verify welders are following WPS, PQR’s
• Verify welders are certified/qualified via WPQ’s
• Walkdown for mechanical completion
• Implemented Site Quality Plan for ParFab
• Sell off systems that are tested(hydro/pneumatic)
• Maintain good working relationship with client and all subcontractors. Parfab Field Services – QC/Planner
IFCO Fertilizer June 2016 – June 2017
Weaver, IA
• Assemble and track packages for final acceptance ie; weld log, flange map.
• Track all ongoing torqueing
• Turn over final packages to client
• Maintain punch list items from client to production Qualspec - NDE Technician
Flint Hills July 2013 - June 2016
Port Arthur, TX
• Lvl II UT-T, PT, MT and PMI
• NDE Coordinator, input requests from welding contractors
• Give appropriate work to UT, PT, MT, and RT technicians
• Enter reports on tracking spreadsheets
• Isometric sketching for any MI issues.
• Pre T/A Planning for 2015 turnaround, build construction packages
• Follow up on all jobs ongoing throughout plant, following NDE packages, hydros, visuals.
JZRussell Industries - NDE Technician
March 2012 –July 2013
• Lead technician (nights) 2012 244 GFU catalyst change.
• Technician on Conoco Phillips DCU/GRP turnaround.
• Ran crew doing baseline inspections as well as unit wide inspections.
• Experienced LVL II MT, PT, and UT-T
• Hand sketching iso’s due to revisions.
CarBer Testing - Planner/Scheduler
Motiva CEP Project February 2011- February 2012
Port Arthur, TX
• Scheduling of bolting connections for crews in field.
• Planned all connections to coincide with work scope for the month.
• Adobe X, Microsoft excel, word,
• Worked on Motiva CEP Project
Applied Standards Inspection - NDE Technician
August 2007 - February 2011
• Achieved 40hr radiation safety for RT
• Achieved all field hours for PT, MT, UT-T, VT, RT
• Ran RT crew, doing various forms of inspection from pipelines to tank farms to offshore drilling rigs.
• Worked on the Development Driller III offshore.
• Worked rigs that were dry docked in Galveston.
• Knowledge of codes as follows ASME, AWS, API.
Education
• 2001 Obtained G.E.D
Other Experience
• AWS CWI
• OSHA 30
• Operator qualified for Polyethylene Joining and Equipment operations 9/20
• Former ASNT Lvl II PT, MT, UT-T, RT, PMI
• Microsoft office products; word, excel, powerpoint
• Can type 50-60 wpm.
• Very well versed in computers and associated programs References