Post Job Free

Resume

Sign in

Power Plant Electrical Engineer

Location:
Chennai, Tamil Nadu, India
Posted:
May 01, 2023

Contact this candidate

Resume:

VETRI RAJAMANICKAM

Avvai nagar, choolaimedu Chennai Tamil nadu India

Mobile: +91-733*******,+965-********(Whatsapp) Email: adwuc9@r.postjobfree.com

Career Objective

“I am seeking an opportunity to merge my initiative, enthusiasm, and 15 years of proficiency to add value, both to the organization and myself. I aim at expanding my horizons and developing skills in the Maintenance Engineer- Electrical to work in a dynamic environment, which provides opportunities for my growth.” Maintenance Oil and Gas Refinery, Railway Projects, and Petrochemical Industries.

S.no

Company Name

Project Name

Position

Duration

1

M/s.Alghanim International General Trading & Contracting Co-Kuwait

KOC Water Knockout Project-4082 under the contract number-17051670

Commissioning and Maintenance of Electrical Equipments such as Breaker, MCCB,Panel Modules,UPS,Battery Charger, Battery and Generator, Transformer

Commissioning Engineer -Electrical

Dec-2021

to Present

2

M/s. Petrofac international limited(Rajasthan-Barmer)

Integrated Gas Development Projects- Commissioning and Maintenance of Electrical Equipments such as Breaker, MCCB,Panel Modules,UPS,Battery Charger,Battery and Generator,Transformer and Overall

incharge of Electrician, Technician A/C Mechanic and Plumbers.

Lead Commissioning and Maintenance Engineer

June 2020 to Feb- 2021

3

M/s. Petrofac international limited(Kuwait)

KOC New Gathering Centre

GC-29 Phase-2- North Kuwait

KOC Approved Commissioning and Maintenance Engineer

Mar 2017

to Mar 2019

4

M/s. Larsen and toubro limited,(Qatar)

Doha Metro Project-Qatar

Maintenance Engineer

Jul 2015

to

Jan 2017

5

M/s.Voltech engineers pvt ltd-international location (Qatar, UAE)

Larsen and Toubro limited (PT&D)-Kahramaa Power and water authority

SPIE -Oil & Gas UAE

Maintenance Engineer

May 2012

to

April 2015

6

M/s.Voltech engineers pvtltd-domestic location (India)

1.Cairn Energy India Limited (CEIL) through M/s L&T

2.Mangalore Refinery and petrochemical limited (MRPL) Through M/s L&T

3.Indian oil corporation limited (Vadodara-Gujarat) Through M/S VEPL 4.Indian oil corporation limited (Mathura-UP)

Indian oil corporation limited (Panipat)

Commissioning Engineer

Aug 2008

to

April 2012

Resume of VETRI.R 1 P a g e

Having a good experience and knowledge in projects, Maintenance, Testing and Commissioning of Railways, power plant, substation and process plant.

Successfully Completed ETAP (ETAP 115 Power System Analysis) training from ETAP Automation Pvt Ltd.

Successfully Completed Electrical Design and Detailed Engineering

Area of Interest

400,220,132KV Switch yards

Protection relays testingfor

LV & MV Motors,VSDtesting

Equipment testing and

Incomers feeder,

and pre-commissioning

functional check

Transformerfeeder,motorsfee

activities and solo run test

der for All make

,load test (upto 2000KW)

400V to 33KV Switchgear

Equipment testing and

Power Transformer testing

Pre-Commissioning

functional check

with RTCC/OLTC and stability

andvendor coordinationFor

test (up to 315MVA)

DCS,SCS& SCADA (DI&DO)

11KV RMU & 22KVRMGGas

insulated switchgear

Battery and UPS systems Pre-

High voltage test (hipot) for

Equipment testing and

Commissioning and vendor

Cable, breaker, bus bar

functional check

coordination

Upto33KV

Operation & maintenance of electrical Equipment’s in Main Substation, Sub-Centre& Trouble shooting of Electrical equipment’s in Process plants

Operation & maintenance of Switchgear’s 33KV, 11KV, 6.6 KV, 3.3 KV, 440V

Functional test of HT and LT Switchgears such as Power & Distribution Transformers and Motors

Operation & maintenance& Trouble Shooting of UPS Systems Up to 40KVA - 415V/ 230V AC, 110VAC

Preventive maintenance of the UPS batteries, Switchgear, MCC, Motors.

Preparation & Updating of Maintenance Schedule for Preventive Maintenance of all electrical Motors

Preparation and Updating of Daily, Weekly, Monthly Reports for Breakdown

Conditional Monitoring of Switchgears, Transformers & Motors

Operation & maintenance of Lighting System, Photocell, Timer Controls, Fire Alarm System, Extinguishing Systems with Smoke & Heat Detectors, EOT crane Control System

Following Work Permit System with Job Safety Analysis Worksheet in Plant and field environments

Checking and Upgrading the Single Line, Three Line Schematic and Control Drawings

Handling of BDV test, Oil Purification for Transformer RTCC, OLTC, MOG, OTI, WTI, PRV Control Circuits

Electrical panel management for Machines & utilities to minimize the break down time

HVAC System and Mechanical related such as Fire Fighting system, PAGA, MEP related activities.

Preventive & predictive maintenance of production machines and its documentations

Planned Maintenance Schedule and timely attendance to Breakdown.

ERP system for various Maintenance & Spares procurement activities.

Complaint management system for internal customers and take of corrective action with in time.

Preparation of Maintenance Schedule

Coordinating with Testing Engineers, Manufacturer, OEM, and Vendor, QA/QC,

Coordinating with Consultant and Clients

Preparation and implementation of Field Change Request and SOP/SMPs (Standard Operating

/Maintenance Procedures).

Red Mark-Up drawings verification

Preparation of MR and EMR

Preparation of Maintenance schedule plan

Attending Progress Meeting & Site related issue

Coordinating Design related issues and Identify & develop alternate vendors for repairs other than OEM

Nature of work

Operation & maintenanceof all Electrical equipment from 415 volts to 765 KV (AIS & GIS) System,

Testing, Diff Stability and REF Stability of Power Transformer (100MVA).

Operation & maintenanceof Motors (2000KW), L.T, MV, and H.T Switchgears, Switchyard (CT, CVT, CB, Busbar, Disconnector, and Earth switch).

Testing and commissioning of Control & Protection panel and Protective Relays (Numerical- Areva, ABB, Siemens and, Electromagnetic) for

Transformer, Generator, and Motor Protection relays (Differential, over current & Earth fault, REF and Stability and schemes.

Feeder Protection and Busbar Stability with Bus transfer scheme

Inspection of control and relay panel, preparation of Test Report, cable schedule, As built Drawings, Method of statement for shutdown jobs and Operation & Maintenance for sub- station, power plant, and process plant.

Switchgears

Switchgears ratings up to 380KV,132KV,33KV,11KV,13.8KV,415V ABB, Hyundai, Schneider,132KV Control Wiring Modification with New System

Medium Voltage & Low Voltage-Isolated Phase Bus duct, Non-Segregated Phase bus duct, Busbar Contact Resistance Test, IR Test, Torque check, AC High-Pot test, Current/Voltage Transformer IR, Winding Resistance Test, Ratio Check, Saturation test, Flick On Test

HV, MV and LV Circuit Breaker IR, Contact Resistance Test, Breaker Timing Test, High-Pot Test

Checking and Testing the Interlock Intertrip Systems between Up and Down Stream Breakers, Earthing Interlock Systems for Busbar & Feeders, Transformer, Motor Feeders 380KV,132KV,33KV,11KV,13.8KV,415V Systems

Functional test of Extra High Voltage, Medium Voltage, Low Voltage Switchgears, Circuit breakers, Transformers and Motors

Functional Test of High-Speed Bus Transfer System, Auto Transfer Schemes

Testing and Calibration, Trouble Shooting, Protective Relays, Transformer, Motor, Over Current and Ground Fault Relays, Under/Over Voltage Relay, Motor Protection Relays, Protective Relays, Preparation and Updating of Relay data sheet. Transformers Stability, Sensitivity and REF

Checking and Upgrading the Single Line, Three Line Schematic and Control Drawings for the Extra High Voltage, Medium Voltage, Low Voltage Switchgears, Generator Protection Control Panels, GIS Interface Panels, MCC& PMCC Panels,

Preparation and updating the Final as built drawings, Test Reports, Training Manuals

Transformers

Power Transformers, Auxiliary Transformers, Distribution Transformers with Two &Three winding rating up to 60MVA and Dry type Transformers-ABB, Hyundai

Factory Acceptance Test activities for Medium and Low Voltage Transformers

Transformers -IR Test, Polarization Index Test, Turns Ratio Test, Vector Group test, Oil BDV Test, Winding Resistance Test, PRV, MOG, ExcitationTest, Tan-Delta Test and Transformer Functional Check

Functional Test of OLTC with Automatic Voltage Regulator Panels,

VSD Drives & UPS

Maintenance and Troubleshooting of ABB make ACS-1000 Variable Speed Drive in Crude Export

Maintenance and Troubleshooting of Nidec make Variable Speed Drive in TV compressor

Maintenance and Troubleshooting of Nidec make Variable Speed Drive in Heater Blower’s

Maintenance and Troubleshooting of CEG make UPS and Battery charger with Battery

Maintenance and Troubleshooting of Shaft make UPS and Battery charger with Battery

Maintenance of Electrical Equipment’s (Power Transformers, Generators, Motors, CT, and CB, Disconnections, Earth switches and Protective Relays).

Scheme checks and Relay co-ordination as per specification.

Preparation of safety documents and method of statements for outages.

Preparation of as built drawings, cable schedule and Site acceptance test records according to the specifications.

Trouble shooting of all Electrical control and protection circuits.

Co-ordination of SCADA.

MiCOM P632 - Transformer Protection MiCOM P120, P127, P143, P142 - O/C & E/F Protection

MiCOM P220, P242 –P141 - Motor protection & Motor differential CDG, CAG - Current operated relays

MVAJ, MVAX, MVTT, MVT - Voltage Operated relays

RET 670 - Transformer Diff.Protection.

SPAJ, REF541 - O/C & E/F Protection.

SPAM and REM - Motor protection.

SPAU - U/V and O/V relay.

SPAJ 115c - SEF and REF.

REL 670 - Distance protection relay

REF-615 - Feeder Protection relay

REM-615 - Motor Protection relay

T-series- T/F - Protection

M-series - Motor protection

7SJ6005, 7SJ6225 - O/C & E/F Protection.

7UT612 - Transformer Diff.Protection.

7SJ62, 63,64 - Multi function Relay

SEL 751 A - O/C & E/F Protection.

M-comp - Motor Protection relay

Bachelor of Electrical & Sapthagiri college of Engineering (ANNA UNIVERSITY) 2008 78%

Electronics Engineering (Tamil Nadu)

Office Packages MS-Office

Operating Systems Windows XP, 7, 8

Name

VETRI.R

Languages

Tamil, English, Hindi

Father’s Name

RAJAMANICKAM.K

Date of Birth

09.05.1986

Sex

Male

Marital Status

Married

Nationality

Indian

Passport No

N2955829

Age

36

Native Place

CHIDAMBARAM

Declaration

I hereby declare that the above information given by me is true to the best of my knowledge. Place: Yours Sincerely,

Date: (R.VETRI)

Technical Skills

Personal Details



Contact this candidate