Career Summary:

** - ***** ** ************ ********** in Oil & Gas projects & O/M (Qatar Gas, Qatar SHELL PGTL, Qatar Energy (QP) ) Power Plant and Cement Plant as an Electrical Engineer.

Employment Record

December 2017 to date Electrical Engineer

Med Gulf Construction

Company Doha Qatar

Experience with Med Gulf

Qatar Gas (Ras Gas) CO2 EXPORT FACILITES PROJECT.

Qatar Gas PLATEAU MAINTENANCE PROJECT.

Qatar Gas (Ras Gas) AKG2 SRU Unit – 169 –E011 EPC For Waste Heat Boiler Replacement Project.

Qatar Gas EPC for EAtoms #302 Improvement to Shore Base Facility XK- 39 and Associated Storage Yards Phase-2 Portable Offices and Porta CabinXk- 39.

Qatar SHELL PEARL GTL LTD Project’s Spent Caustic Over Head Line.

Qatar Petroleum Project EPIC for Gas Supply to Facility- D at Alwakrah – Phase -II, Alwakrah –Qatar.

Responsibility Overview:

Reviewing Engineering Documents, Preparing documents related to the Projects (Method Statement, EMOC, IA, MAR, MIR, RFI).

Authorized Electrical Person (AEP) approved from Qatar Gas.

Compliance with project safety Rules and Regulation.

Project Execution as per IFC Drawings and Scope of Work.

Coordination with vendors for getting quote for various electrical equipment’s.

Work execution and compliance with inspection and testing as per project approved ITP.

Leading of E& I Team During, Execution, Loop Checking, Trouble Shooting, Calibration and Pre- Commissioning of E&I Equipment’s such as

6.6 kV Switchgear and MCC panel, 415 V Switch board panel

Transformers (1600 kVA, 1000 kVA, 500 kVA), Bus Duct.

415V -240 V Distribution Panel, UPS Distribution Board. Thyristor panel

MV Variable Frequency Drive (VFD), MV Booster Pump Motors.

Neutral Grounding Resistor, HVAC Control Panel.

TEG REGEN Reboiler Heater CTRL Panel, Annunciator panel

Ring Main Unit (RMU), Power Factor Panel.

Instrument Air Compressor and its panel.

Scada Marshalling Panel, DCS Marshalling Cabinet, DCS System Cabinet.

ELICS Panel, FGS System Cabinet, CCTV Cabinet, Metering system Cabinet.

FM200 Panel and devices for Kharama Sub-station’s.

Lighting DB’s, Instrument, F&G devices and Jb’s.

Motor Operated Valves (MOV’s), Shut down Valve (SDV), Control Valve.

Electro Hydraulic Actuator, Oxygen Analyzer, Building F&G Junction Box.

Instrument Air Tube Bundle, N2 Purge lines and its Supports.

Lightning Protection, earthing works and Exothermic CAD weld connections

Power, Instrument, F&G and FOC cable Laying.

M.V Cable (1C x 500 mm, 1C x 240 mm, 3C x 240 mm ) Cable Laying.

Continuity test and Insulation Resistance test of various cables.

Lighting Poles, Lighting Fixtures (Flour sent Lightings) and Lighting JB”s.

Installation of Instrument Air tubing Supports and it’s Accessories.

Marshalling Box, Electrical Heat Tracers, Safety Switches.

Installation of Field Instruments. (P.T, T.T, T.G, P.G, RTD Temperature Elements, Thermocouples, Flow Meters, Temp Controller).

Inspection of Power Tools and Equipment’s.

G.I Conduit and accessories.

UPS system 5 kVA, 230 V, 50 HZ.

Instrument and F&G Devices ( Optical Smoke Detector, Heat Detector, Manual call Point, Sounder Beacon, Toxic Gas Detector, Flammable Gas Detector, Gas Alarm Sounder, Gas Beacon).

Power Switches, Power Sockets.

Cable Gladding and terminations.

Cable tray and its supports.

Dry Seal Gas Heater Controller Panel.

AC, DC UPS Distribution Panel.

MV Variable Frequency Drive.

Preservation of Electrical Equipment’s.

Modification of Existing 6.6 kV Switchgear / MCC (SB- 60341 A/B)-Panel A06-B06.

Isolate and De- Isolate of Power Equipment’s.

Isolate and De-isolate of instruments Components by ASM-Instrument.

Interface and Tie –in works with Existing system.

Pre-startup with production teams.

Leak Test /Loop check/ function test, Commissioning. December 2016 to November 2017 Electrical and Instrumentation

(E&I) Engineer

Port Qasim Electric Power Plant

Power China (SEPCO III)

Company Bin Qasim Karachi.

Worked in Coal Fired Power Plant, having Capacity of 1320 MW (2*660) MW

. at Bin Qasim Karachi.

• The Major activities were Testing and Calibration of following instruments.

• Thermocouples

• Pressure Transmitters

• RTD

• Pressure Switches

• Temperature switches

• Temperature Gauges

• Pressure Gauges

• Temperature Transmitters

• Preparation of Calibration reports and issuance of certificates.

• Supervision of Installations of RTD, Thermocouples, Sensors, Transient Speed Monitor, Transducers, Limit Switches and Vibro Meters. February 2013 to October 2016 Electrical Engineer

Rohri Cement Plant

Rohri, Sukkur.

Worked in Rohri Cement Plant having 5000 ton/day capacity at Rohri, Sukkur.

The major activities were:

• Planning and designing of Electrical system for Rohri Cement Plant.

• Supervision of erection of two transformers 20/26 MVA complete with all components and accessories, and Electrical system of Central Control Room

(CCR).

• Planning of 132 kV Grid Station and designing of 05 Substation, (Crusher, Raw Material Storage and Conveying, Raw Material Grinding, Kiln inlet and outlet) and Cable Root of overall plant.

• Supervision of Installations of MV and LV motors, soft starters, frequency inverter, panels (MV and LV) and MCCs.

• Carried out the Cable Trenches in various required Sub-Stations.

Operation and maintenance of existing grid station 66 kV / 3.3kV, Hammer Crusher Plant, Cement Ball Mill (Capacity 700 ton / day) and Packing House.

• Co-ordination with Chinese design firms and Electrical contractors. Internships

• Internship at Jamshoro Power Company Ltd., (JPCL), Electrical Engineering Department, Plant, having Capacity of 880MW (4*220) MW Jamshoro, Sindh, June 2010.

• Internship at Electrical Department, Bin Qasim Thermal Power Station, Karachi Electric Supply Corporation (KESC), Plant, having Capacity of 1260 MW (6*210) MW Karachi, July 2011

• Internship at Engineering Department, Jinnah International Airport Pakistan International Airlines (PIA), Karachi, August 2011.

• Internship at Sui Southern Gas Company Limited (SSGC), Electrical Engineering Department, Karachi, July 2012

Technical Skills

AutoCAD, Navis, PLC, MS- Office,

Education

SSC (Science), BISE, Sukkur, 2006

HSC (Pre Engineering), BISE, Sukkur,2008

B.E (Electrical), QUEST Nawabshah Sindh. 2012

REFERENCE

Will be furnished upon request.



Contact this candidate