Position Desired Instrument and Control Engineer

Name Felix T. Bongcawil, Jr.

Age: 64 Years Old

Home Address: **** ********* *****, ******, *********, Cebu City, Philippines 6000

Mobile Phone: +639*********

Date of Birth: June 10, 1958

Place of Birth: Poblacion, Maigo, Lanao Del Norte, Philippines, 9206

Height 1.68 Meters

Weight 70 Kilograms

Civil Status Married

Highest Educational Bachelor of Science in Mechanical Engineering

Attainment

License Mechanical Engineer - PRC #0021923

Passport P7602290A - Issued at DFA, Cebu City, Philippines

Date of Issue - 20 June 2018; Date of Expiry - 19 June 2028

e-mail adwpn7@r.postjobfree.com

Education

Primary MAIGO CENTRAL SCHOOL

Maigo, Lanao Del Norte

Philippines 9206

1964- 1970

Secondary MAIGO SCHOOL OF ARTS AND TRADES

Maigo, Lanao Del Norte

Philippines 9206

1970- 1974

College COLEGIO DE SAN JOSE RECOLETOS

College Of Engineering

B.S.Mechanical Engineering

Cebu City, Philippines 6000

1974- 1979

Work Experience

May 29, 2011 – June 26, 2014 Senior Instrument and Control Engineer - PMC

Tebobin (Middle East) Limited, Abu Dhabi - UAE

IRP-II EPC 2 Main Inter-Refineries Pipelines

TAKREER ADNOC Refineries

Abu Dhabi, UAE

Senior Instrument and Control Engineer - PMC

Tebobin (Middle East) Limited, Abu Dhabi - UAE

IRP-II EPC 2 Main Inter-Refineries Pipelines

TAKREER ADNOC Refineries

Project Home Office-Main IRP-II Package

S.I. Tower, 9th Floor, Yeoksam-Dong, 679-4

Gangnam-gu, Seoul, South Korea

Postal Code 135-977

Assigned as Project Management Consultant - Instrumentation and Process Control Engineer for the TAKREER Main Inter-Refineries Pipelines Project II including related Terminal Facilities. Main responsibility is review and approval of the Specification, Design, Supply and Installation of Instrumentation & Controls in the Facilities ensuring compliance to CONTRACT Project Objectives, Industry Standards and Best Practices for Safety, Reliability and Cost. Detailed Engineering, Material Requisitions, Technical Bid Evaluations, Tender Documents and Instrumentation and Control Systems Review and Evaluation of Engineering Deliverables for the Inter-Refineries Pipelines, Sectionalizing Valve Stations and Terminal Facilities and for Modification Works on Existing Facilities to be revamped, debottlenecked or modernized. Detailed Engineering Preparations include Scope of Work, Hot Cut Over Procedure and Inter-Connectability / Inter-Operability Review and Implementation, Sizing and Specifications, Construction Drawings and Details, Materials-Take Off, Site Surveys, Vendor Selection, Coordination with Operation/Production Engineers and Contractor Discipline Design / Installation Engineers. Coordinate with Airport Facility Authorities in Abu Dhabi International Airport (ADIA) and Al Dhafra Airbase for Jet Fuel Pipelines and Facilities for Fuel Receiving and Metering Installation. Project Designs include Process Control and Instrumentation for the Phase II Inter-Refineries Pipelines and Oil and Gas Facilities including ESD, DCS, Fire and Gas Detection Systems, ITAS, Machine Protection and Monitoring, Fiscal and Custody Transfer Metering Skids, Pipeline Leak Detection System, Utilities and LPG Bottling and Filling among others. Work also includes Design Supervision, Coordination and QA/QC for Design Packages done by the Contractor Design Engineering. Work also include Site Engineering, Construction Supervision and Commissioning of the Pipelines and Terminal Facilities.

1. Involved in review and approval of Engineering Deliverables for the TAKREER IRP-II (Inter-Refineries Pipelines and Terminals) LPG Pipeline Pig Launcher and Receiver from Ruwais Refinery to Mussafah LPG Bottling and Distribution Facility. Supervised and monitored the installation, testing and commissioning of Control System and terminal instrumentation installation including cabling, wiring and termination and testing of Process Control, Safety Instrumented System, Machine Condition Monitoring, Emergency Shutdown System, Fire and Gas System and Custodial and Fiscal Flow Metering System, PLC, SCADA, Security and Alarm Systems. Contractor supervision include strict implementation of HSE requirement in working in existing live plant, hazardous location.

2. Supervised and monitored installation of the Al Dhafrah Airbase Jet A1 Hydrocarbon Product Pipeline including Pig Launcher and Received, Fiscal Flow metering Facility, Tank Gauging System, Chemical Injection, Fuel Filtering System and associated Instrumentation and Control including Gas and Fire Alarm System, Safety Systems, Perimeter Security System and Control System.

3. Supervised and monitored installation of the Mussafah Unit 480 Gasoline, Diesel, Kerosene and Aviation Gas Fuel Receiving and Distribution Facility for TAKREER ADNOC Distribution. The Facility include Hydrocarbon Tank Farms, Fire Water Tanks and Fire Water Distribution Systems, Custody and Fiscal Metering System, New Control Room and Switch Gear Building, Transfer Pumps and associated Control and Instrumentation.

4.Supervised and monitored installation of the Ruwais Unit 1000 Gasoline, Diesel, Kerosene and Aviation Gas Fuel Receiving and Distribution Facility for TAKREER ADNOC Distribution. The Facility include Hydrocarbon Tank Farms, Fire Water Tanks and Fire Water Distribution Systems, Custody and Fiscal Metering System, New Control Room and Switch Gear Building, Transfer Pumps and associated Control and Instrumentation.

5. Supervised and monitored installation of the Madinat Sayed Unit 900 Gasoline, Diesel, Kerosene and Aviation Gas Fuel Receiving and Distribution Facility for TAKREER ADNOC Distribution. The Facility include Hydrocarbon Tank Farms, Fire Water Tanks and Fire Water Distribution Systems, Custody and Fiscal Metering System, New Control Room and Switch Gear Building, Transfer Pumps and associated Control and Instrumentation.

6. Supervised and monitored installation of the Al Ain Unit 1300 LPG, Gasoline, Diesel, Kerosene and Aviation Gas Fuel Receiving and Distribution Facility for TAKREER ADNOC Distribution. The Facility include Hydrocarbon Tank Farms, Fire Water Tanks and Fire Water Distribution Systems, Custody and Fiscal Metering System, New Control Room and Switch Gear Building, Transfer Pumps and associated Control and Instrumentation.

7. Supervised and monitored installation of the Swiehat Diesel Fuel Receiving Facility for TAKREER ADNOC Distribution for the Swiehat Electricity Station. The Facility include Hydrocarbon Tank Farms, Fire Water Tanks and Fire Water Distribution Systems, Custody and Fiscal Metering System, New Control Room and Switch Gear Building, Transfer Pumps and associated Control and Instrumentation.

8. Supervised and monitored installation of the ADIA (Abu Dhabi International Airport) Aviation Gas Fuel Receiving and Distribution Facility for TAKREER ADNOC Distribution. The Facility include Hydrocarbon Tank Farms, Fire Water Tanks and Fire Water Distribution Systems, Custody and Fiscal Metering System, New Control Room and Switch Gear Building, Transfer Pumps and associated Control and Instrumentation.

9. Supervised and monitored installation of the Interconnection Pipeline from Ruwais Refinery/Ruwais Refinery Expansion to Abu Dhabi Refinery Gasoline, Diesel, Kerosene and Aviation Gas Fuel Receiving and Distribution Facility for TAKREER ADNOC Distribution. The Facility include Hydrocarbon Tank Farms, Fire Water Tanks and Fire Water Distribution Systems, Custody and Fiscal Metering System, New Control Room and Switch Gear Building, Transfer Pumps and associated Control and Instrumentation.

Jan 2011 – May 25, 2011 Senior Design Engineer/Lead Engineer

Control Systems and Automation Department

Fluor Daniel Philippines, Incorporated

Alabang, Metro Manila, Philippines 1781

Assigned as Sr. Design Engineer – Control Systems and Automation Department for EPC/EPCM Front End Engineering and Detailed Engineering Design for Oil and Gas, Mining. Power and Industrial Plants. Engineering and Design activities involving Proposals, Cost Estimates, Sizing / Calculations and Specifications of Instrumentation and Control using SPI/Intools and AutoCADD for Engineering Drawings and Deliverables. Main responsibility is the Review and Approval of Specifications, Design and Installation Details of Instrumentation & Controls in the Facilities ensuring that it meets Project Objectives, Industry Standards and Best Engineering Practices for Safety, Reliability and Cost. Detailed Engineering, Material Requisitions and Instrumentation and Control Systems Review and Evaluation of Engineering Deliverables. Work also involves Supervision and Training of assigned Junior Staff for Competencies. Instrumentation and Automation Systems overall Design, Integrity and Compliance with International Codes and Standards, Company Guidelines and Best Engineering Practices, Supervising and Directing Detailed Engineering Contractors during the execution of Engineering activities, ensuring the Highest Quality of the Deliverables according to the Contract Requirements. Providing Technical Input, in line with Project Requirements in Technical Studies and Design Basis for Mining, Offshore and Onshore Oil and Gas, and Industrial Facilities covering the Field Instrumentation to Control Room including Marshaling and Systems I/O cabinets.

Nov 2007 – Nov 2008 Principal Instrument/Electrical Engineer

Worley Parsons (Houston)

MEGPL Operations Projects Department

Marathon Equatorial Guinea Productions Ltd.

Malabo, Equatorial Guinea

Assigned as Instrumentation & Electrical Engineer for the newly organized MEGPL Operations Projects Department for Production Operations Support, Capital Projects, New Works and Upgrades and Modifications of Offshore and Onshore Gas Production Facilities. Main responsibility is review and approval of the Specification, Design, Supply and Implementation / Installation of Instrumentation & Controls in the Facilities to meet Project Objectives, Applicable Industry Standards and Best Engineering Practices for Safety, Reliability and Cost Effectivity. Primary activities include Project Feasibility Studies, Detailed Engineering, Material Requisitions, Technical Bid Evaluations, Tender Documents and Instrumentation and Control Systems Review and Evaluation of Engineering Deliverables for the Offshore and Onshore Oil and Gas Facilities and for Modification Works to be implemented in Existing Facilities to be Revamped, Debottlenecked or Modernized. Detailed Engineering preparations include Scope of Work, Sizing and Specifications, Construction Drawings and Details, Materials-Take Off and Site Surveys. Worked on the Detailed Engineering and Design of Fire and Gas System, Emergency Shutdown System, Safety Instrumented System, Relief and Blowdown System of Offshore and Onshore Oil and Gas Facilities. Prepared Scope of Work, Budgetary Cost Estimates, MTO and Work Packs for Contracted and In-House Projects. Participated in the HAZOP and HAZID and provided inputs for the Updates of HES Program of the Company.

Oct 2004 – Nov 2007 Instrument/Electrical Engineer

Downstream Pipelines & Pump Stations

Melut Basin Oil Development Project

OGP Petrodar PMC

Khartoum, Sudan

Assigned as Principal Instrument / Electrical Engineer and Alternate Resident Engineer for the Downstream Pipelines and Pump Stations of Melut Basin Oil Development Project of PDOC. OGP is a Subsidiary of PETRONAS- Malaysia appointed as Project Consultant of PDOC. The Downstream Pipelines Project Consist Of 1370 Kms of Crude Oil Export Pipelines, Six Pump Stations, Scraper Launchers and Receivers Facilities, 29 Block Valve Stations, ESD System, Cathodic Protection System, Pipelines Leak Detection System, Remote Location Solar Panels for Power Supplies, Emergency Generators And a Marine Terminal. Work Includes Detailed Engineering Review/Comments and Approvals, Vendor Offered Equipment / Electrical and Instrumentation Review / Comments and Approvals, Contractor to Contractor Interface and Inter-Discipline Interface Coordination.

FEB. 2001- JUNE 2004 Instrumentation & Process Control Design Engineer

NAPOE/SSD-DESIGN UNIT

Saudi ARAMCO

PO Box 529 Tanajib Central

Dhahran, 31311, Saudi Arabia

JATCO MTS Contractor Employee- Instrumentation and Process Control Design Engineer for the Northern Area Producing Operations Engineering/Support Services Division-Design Unit for the Detailed Engineering Preparation of Projects related to the Replacements, Modifications, New Works and Upgrade Design Requests for the Northern Area Oil and Gas Onshore and Offshore Operations and Production Facilities. Detailed Engineering Preparations include Sizing and Specifications, Detailed Construction Drawings and Details, Material-Take Off, Budgetary Cost Estimates, Scope of Work, Site Surveys, Vendor Selection, Coordination with Operation / Production Engineers and Discipline Design Engineers. Project Designs include Process Control and Instrumentation for Test Barges and Oil and Gas Facilities including ESD, DCS, Fire and Gas Detection Systems, PLC, Machinery Protection and Surge Control among others. Work also includes Design Supervision, Coordination and QA/QC for Design Packages done by Saudi ARAMCO Design Engineering Contractors.

OCT 1998 – AUG 1999 Instrument Engineer

Common Facilities and Off-Sites

T.S.K.J. NIGERIA LTD

Nigerian L.N.G. Project (0-6333)

Bonny Island River State, Nigeria

Assigned as Field Installation Engineer for the Works related to the Installation, Calibration, Cabling and Terminations, Punch Listing and Acceptance of Systems and Loops Instrumentation for the Common Facilities and Offsites of the Nigerian Liquefied Natural Gas Facilities by the Joint Venture of Technip, Snamprogetti, Kellogg and Japan Gas Corporation. Works include Site Supervision, Coordination, Documentation, Quality Assurance, Schedule Coordination, Materials Coordination, Installation Field Verification, QA/QC Checking and Punch Listing, Acceptance and Turnover of Completed Loops, Systems or Works Completed by the Contractor/Subcontractors and Assistance/Mentoring to Owner’s Representatives/ Supervisors.

JAN 1996 – AUG 1997 Instrument Engineer (Technical Staff)

Nihon Overseas Services Co. Ltd

4th Floor JAKA II Bldg.

150 Legaspi St., Legaspi Village, Makati

Metro Manila, Philippines 1229

-FURTHER ASSIGNMENT AS-

Instrument Engineer (QA/QC & Design Review)

Mitsubishi Heavy Industries- Chemical Engineering Center

3-3-1 Minatomirai, Nishi-ku, Yokohama, Japan

-FURTHER ASSIGNMENT AS-

Instrument Engineer (Installation)

AR Razi III Project

Saudi Methanol Company

Jubail Industrial Estate, Jubail, Saudi Arabia

Assigned as Sr. Instrument Engineer for the Installation of Instrumentation and Control for 850,000 MTPY Methanol Synthesis Plant for the Saudi Methanol Company (AR RAZI III). Works include Supervision, Planning, Scheduling, Materials Control, Documentation, Progress Monitoring, Quality Assurance, Client / Vendor / Subcontractor Liaison, Site Engineering, Modifications, Punch Listing, Acceptance and Turn-Over to the Commissioning Group the Loops and Systems after Testing and Pre- Commissioning. The Plant Consist of Utilities Area Tie-In to Existing Utilities Plant consisting of Plant and Instrument Air Compressors System, High, Medium and Low Pressure Steam Systems, Process and Fuel Gas Inlet Stations, Sea Water and Fresh Water Intake Systems, Closed and Sea Water Cooling Systems, Electro- Chlorination Plant, Chemical Storage and Treated Water Storage Systems. The Process Plant Consist Of Methanol Storage Facilities, Vent And Flare Systems, Synthesis, Evaporation, Distillation, Reaction, Reforming, Cooling, and Gas Compression Systems among others. Instrumentation and Control Consist of PLC based Package Skid Control System, Smart Instruments and Yokogawa Centum CS DCS System Interconnected by Hardwiring and Fiber-Optics.

JUL 1994 – MAY 1995 Chief Electrical/ Instrument Engineer

3X 250 MWatt Steam Turbine Generation System

Pulau Seraya Power Station Stage III Development

Jurong Engineering Limited, Pulau Seraya, Singapore

Assigned as Over-All Supervisor to the Works involving Installation and Testing / Commissioning of the Instrumentation and Controls of the Pulau Seraya Power Station for the Public Utilities Board of Singapore. The Plant Consists of 3 Units Reheat Steam Turbine Generators, Cooling System Sea Water Intake, Sea Water Intake Band Screens and Washing System, Electro Chlorination Plant, Air Compression System, Control Hydraulic System, Closed Circuit Cooling Water System, Sea Water Cooling Water System, Steam Condensate and Feedwater System, Electrical Switchgear and MCC Installation, Cabling and Termination, Testing, Pre- Commissioning and Commissioning Works.

OCT 1993 – MAY 1994 Instrument Engineer

King Wilkinson (Saudi Arabia) Ltd.

Khassiogi Building

Po Box 1110, Al Khobar 31952, K.S.A.

Involved with the Detailed Engineering Checking and Field Verification Works for the Collection of Data, Documentation Update, Drawing Update and other Relevant Activities Related to the Design and Modernization of the Saudi-ARAMCO UGP II Uthmaniyah Gas Plant- Sulfur Recovery and Utilities Plants Instrumentation and Controls. Utilities Plants consists of 6 units Gas Fired Steam Boilers, Feedwater System, Deaerators, Feedwater Treatment, Electro- Chlorination, High and Low Pressure Steam Systems, and Plant / Instrument Air System. The Sulfur Plant consists of 3 Trains Sulfur Recovery Units, Circulating Cooling Water System, Underground Sulfur Storage System, Steam Jacket Heating System, Combustion Air Inlet System, Fuel Gas Finned Fan Cooling System.

JAN 1991- OCT 1993 Manager - Gasoline Station

Felgon Petron Refilling Station

Poblacion, Maigo, Lanao del Norte, Philippines 9206

Established, constructed and managed a family owned venture of retailing petroleum products. The family owned business started in 1960s as Agricultural products dealer and General Merchandise vendor and later expanded to selling Petroleum products (Fuel and Lubricants) on retail. Conducted the feasibility studies, Marketing strategies and retailer negotiation with Petrophil Corporation (PETRON) and applied for business permit to engage in petroleum product with the Philippine Government. Supervised and commissioned the start-up operations and actual retailing activities until the venture stabilized and since then turned over the operation to the family proprietorship.

SEPT 1987 – OCT 1988 Commissioning Instrumentation Engineer

Dubai Electricity Company Station “E”

Contract Dub 110

Korea Heavy Industries Co. Ltd/ Stone and Webster’s, Ltd.

PO Box 11859, Dubai, U.A.E.

Assigned as Commissioning Instrumentation Engineer for the 3 X 90 MWatt Gas/ Distillate Turbine Generation Power System and 24 Million Gallons a Day Sea Water Desalination Plant and Auxiliary Plants. The Plant Consists of 3 Units Frame 9 A.E.G. KANIS 20 kV 90 MWatt Turbine Generators, G.E. Speedtronic Control System, Waste Heat Boilers, 24 Million Gallons a Day Desalination Plant, Sea Water Intake System, Water Treatment Plant, Gas/ Distillate Fuel Systems, 2 Units WARTSILA I Mwatt Emergency Generating Sets, and SIEMENS AS 230 DCS System. Works include Installation Checking and Acceptance Documentation, Field Calibrations, Loop Checking and Simulations, Pre-Commissioning Checking and Hot Commissioning. Works also include Trouble- Shooting and Performance Running.

APR 1984- AUG 1987 Instrument Supervisor

Instrument Section

Plant Engineering Department

Mabuhay Vinyl Corporation

Assumption Heights, Iligan City, Philippines, 9200

Reporting to the Plant Engineering Superintendent, was assigned as Supervisor for Maintenance, Preventive Maintenance, Repairs, Trouble- Shooting, Calibration, Loop Checking, Modifications and Rehabilitation of Instruments and Controls for a 30,000 MTPY VCM Plant. The Plant consists of a new 20,000 MTPY and an older 10,000 MTPY VCM Polymerization Plants and Utilities and Chlor-Alkali Facilities. Duties include Daily Supervision and Scheduling of Activities in Support of Production, Preventive and Reactive Maintenance, Spare Parts Monitoring and Requisition, Personnel Mentoring and Competencies, Training and Evaluation and Maintenance and Planning Coordination with Plant Fabrication, Piping, Mechanical and Electrical Maintenance Supervisors and Production Management.

FEB 1982 – FEB 1983 Instrument Mechanic

Instrument Maintenance Department

Power and Desalination Division

Dubai Aluminum Company, Ltd.

PO Box 3627, Dubai, U.A.E.

Involved with the Maintenance, Preventive Maintenance, Repairs, Trouble- Shooting, Calibration, Loop Checking, Modifications and Rehabilitation of Instruments and Controls for a 690 Mwatt G.E. Gas / Distillate Turbine Generators, 20 Million Gallons a Day Seawater Desalination Plant and Auxiliaries. The Plant Consists of 8 Frame 5 Gas / Distillate Turbine Generators, 3 Frame 9 Gas / Distillate Turbine Generators, G.E. Speedtronic Control System, D.C.S. System, 13 Units Waste Heat Boilers, 2 Trains Desalination Plant, 4 Emergency Gas Fired Boilers and Water Treatment Plant.

MAY 1980 – FEB 1982 Instrument Engineer

Plant Construction Department

Mabuhay Vinyl Corporation

Assumption Heights, Iligan City, Philippines 9200

Involved with the Detailed Engineering Preparations, Research, Designs, Documentation, Sizing, Calculations, Specifications and Planning for a 20,000 MTPY VCM Plant Expansion Project for Mabuhay Vinyl Corporation. The Design was based on the Existing 10,000 MTPY VCM Polymerization Plant built by Hitachi Corporation of Japan. The New Design utilizes Electro-Pneumatic Technology as against the purely Pneumatic Control System of the Old Plant.

JUNE 1980 – DEC 1981 Part Time College Instructor

St. Peter’s College - College of Engineering

Sabayle St., Iligan City, Philippines 9200

Part- time Mechanical Engineering Instructor at St. Peter’s College - Night School for the following subjects:

1.) ME-313- Kinematics and Machine Elements

2.) ME-511- Steam Power Engineering

3.) ME-516- Industrial Processes and Control Engineering

4.) ME-524- Power Plant Design

Prepares Course Lessons for each Subject, Prepare and Submit Lesson Plans, Lectures on the Subject Matters as Per School Curriculum Course Outline and Prospectus, Assign Projects and Assignment for each Subject, Conducts Periodical Examinations, Prepares Student Grade Sheets, Evaluates and Grade the Competencies of Each Student by Preparation of Report Cards and Submit to the Dean of Engineering and the School Registrar all Records pertaining to Course and Subject Matter Students Progress, Classroom Attendance and Student Grading Reports.