Post Job Free

Resume

Sign in

Production Packager Auto Parts

Location:
Pueblo, CO
Posted:
April 19, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

Oscar David Ocampo Cervera.

Address: UNITED STATES OF AMERICA.

**** *** *********. ** **** Phone: 1-719-***-****

Pueblo Colorado. Colorado USA. ZIP. 80907. e-mail: adwnam@r.postjobfree.com adwnam@r.postjobfree.com

Technical Studies. Technician machines and tools, Electricity motors, Electronics control rooms, thermos par, present sensor, electromagnetic valves, Electro contactor, flux sensor. Welding and electrical machining tools, and milling machine gun around. Paint Gun, Blasting clean. Time and motion analysis. Basic Electronics, rheology of plastics and their processing by injection, injection, and extrusion blow as well as thermoforming. Professional Studies. Industrial chemical engineer. Chemical analysis, organic and inorganic synthesis, processing unit processes in batch or continuous flow, fluid flow, heat transfer, distillation, drying, design and development of production plants to industrial pilot scale, time studies and movements, supervision skills, Control production MRP. ERP. SAP. Re-engineering and costing of processes at constant and variable cost, design production lines. Quality assurance, inspection, length, waist, deep, dimensional inspections, diameters, use past no past gates, check parameters voltage, ampere, ohm meter, use multimeter, oscilloscope, scales millimeters, inches, cramping wire, Molex connector, harness plugin. W O R K E X P E R I E N C E.

COMPANY: PHILIPS MEDICARE INC. / SYNSTAFFING INC.

POSITION: ELECTROMECHANICAL TECHNICIAN/ ELECTRONIC TECHNICIAN SPECIALIST. PERIOD: JUNE 2022 TO OCTOBER 2022.

Activities: Reception and decontamination of the different laser models QVS, PHENIX, and LPS, with the use of chemical solutions

(Checklist Hazmat) verification of the state and acceptable operation of the microprocessors in their electronic cards, readjustment of voltages and amount of energy of the laser, review of the process of the motor and the Thyratron, removal of blood stains and residues from surgeries, preparation of the DECOM report and its suggestion for repair or disposal. For engineering and its correct disposal according to the process manuals of PHILIPS S.A. FDA, OSHAS-1800, RoHS, ISO-13485, 2002/95/EC ISO-9001, ISO- 14000, F94916. Disassembly of the lasers to repair their basses or plasma tubes and their subassemblies such as Thyratron, motor, degassing of the Hazmat plasma tube, use of gas recuperators such as Argon Ar, Zenon Zn, ceramic supports, ceramic resistances, and high amperage connectors and voltage. Continuing with cleaning the plasma tubes, pipes, valves, and high-pressure closed connections, replacing all the O-rings, gaskets, and electrical connectors with new ones, and assembling the pre-assemblies of the voltage and gas power supplies. Pressure, temperature, and hermetic closure tests, in the measurement furnaces, determine their acceptance or reprocessing. With the approval of the quality assurance area, they are placed in the warehouse and available for the next assembly. Production of electrical subassemblies, with electric motors, voltage and amperage rectifiers, high efficiency electronic controllers for increasing voltage and amperage, TOROID-type transformer assemblies and their controllers, connector bridge assemblies for high voltage and amperage, various high amperage and voltage and low voltage and amperage switches, installation of electronic cards with microprocessors, ESD certification, installation of chips for various uses in electronic cards, assembly of touch screens and their respective chips, assembly of soldering and capacitor resistors, chips, transistors, cables, terminals, ESD certification, Assembly of the laser starting with the elaboration of the work order and the generation of the production batch in the PHILIPS SAP-Windchill System and elaboration of the batches and production orders of the subassemblies, printing of the Diagrams and drawings of the assemblies, printing of the (BOOM) content of each and every one of the part s and pieces of the subassemblies and assemblies, as well as their screws, nuts, washers, fastening bands, labels, packaging, etc. Printing the manuals to be used for the assemblies and the torque manual, the general production manual, filling out the work and report forms, cleaning the work area and counting all the parts of the boom (Steading), and reading the important notes from the manuals. Start of laser assembly and sub-assembly operation, data collection of used sub-lots and their wiring, start in the main Frame, assembly of all sub-assemblies and parts of the laser, adjustment of the front side covers and of the screens, operation tests in conjunction with quality assurance, filling of all forms and closing production reports in PHILIPS SAP-Windchill, delivery of reports and laser to the FINAL TESTING department.

COMPANY: HYDROLIC BASIN INC (DICKINSON NORTH DAKOTA USA). POSITION: ELECTRO GALVANIC TECHNICIAN /ELECTROMECANIC SPECIALIST TECHNICIAN PERIOD: APRIL 2020 TO NOVEMBER 2021.

Activities :Reception of all types of industrial shock absorbers, disassembly, verification of damage and request of spare parts for its assembly, the rectification of the internal cavity by polishing, review, and determination if it is sent to Chrome, the rectification of the main cylinder by polishing until fit in thousandths of an inch, With chrome and polished adjusted to the thousandths of an inch, we proceed to assemble, starting with the placement of O-rings and gaskets of various materials, rubber, plastic, Garlock, metal, in the cylinder and then place it in the internal cavity of the barrel. external cylinder, closing it and adjusting it with the corresponding torques, to pass its hydraulic pressure tests and activate correctly according to the shock absorber graphs and tables, Disassembly of transmission cases and their failure analysis and parts to be replaced, the rectification of the cases around them, welding if necessary and change of gears, replacement of gaskets and assembly, manifold functionality tests for different pressure ranges of gear operation. Pumps disassembly, cleaning, and review of the calipers, mechanical seals, gear packing, impellers, and Alaves, welding if necessary and grinding around, an adjustment in thousandths of an inch, replacement of damaged parts, for assembly, starting with the mechanical seals, impellers, O-rings or casing gaskets, to finish with the correct torque of the nuts and bolts, the corresponding work and pressure test. Electroplating. In the electrochemical or electroplating part, Hazmat checklist and preparation of chemical cleaning solutions for degreasing and their corresponding rinses, preparation and analysis of chemical solutions for pickling (calculated and controlled electrochemical attack, in acid vats with the use of current) Calculation of the thousandths of an inch of electrochemical pickling. With its consequent review and, if required, its chemical adjustment or around and reprocessing. Des nickel-plated Preparation of the polarized and reverse current electrochemical des nickeling solution, Hazmat checklist and calculation of the processing time and current, placement and masking of the cylinders to be dechromed so as not to damage sensitive parts that do not require des-nickel zing. Preparation of electro deposit solutions in different cations and their solutions such as copper Cu++, Ni++, Cr+6, Hazmat checklist and manufacture and preparation of anodes for each of the electro deposits, Calculation of AMPERS currents, Voltages V and process time for each piece, chemical cleaning and masking of the Cu++, Ni++, Cr+6 electro-deposited pieces, assembly in the cathodes of the vat, verification of correct contacts and the start of the electro- deposited process, control of parameters and its adjustment, temperature inspection and auxiliary services, control of the main parameters of the electro-tank, partial inspections and taking the thickness of the electro-tank, if it meets the requirements and specifications, rinsing and cleaning, verification of thickness and surface parameters, filling of the process and hazmat report, delivery of electrodeposited parts and work report to the Plant Manager. COMPANY: STALLION OIL SERVICES INC (DICKINSON NORTH DAKOTA USA). POSITION: DIESEL MECHANIC AND PIPE YARD.

PERIOD: SEPTEMBER 2019 TO MARCH 2020.

Activities Driving 5500 pickups and generators out the Dickinson*s workshop to WILLIS TON*s workshop and location around bunker oil rigs, Oil full change services replace diesel, air, and oil filters, and lubricant differentials. change shoe brakes on trailers, flatbeds, and pickups, Paint HVLP ELECTROSTATIC guns, replace valves, hoses, and airlines brake, Filling diesel, DOE, filling liquids such as antifreeze, motor oil, brake liquid and water, hydra oil pistons. Cleaning the engine and equipment controls cleaning, secondary electrical systems, checking electric lines and replacing the light bulb, pneumatic of construction machinery as scrubbers, cranes, machines blades, tractor, and Changing parts of the machinery. Lube is moving parts Trailer and flatbed-like shaft brake. Using equipment such as saws, jackhammers, drills, electric arc welding, and MIG, filing paperwork, security worksheet, check inspection list, and parts to fix. COMPANY: BARANKO BROTHERS INC (DICKINSON NORTH DAKOTA USA). POSITION: DIESEL MECHANIC AND LABOR.

PERIOD: JULY 2016 to OCTOBER 2016.

Activities: Driving pickup truck on the road 200 highway, inventory of the tools and equipment mechanical repair in the Trucks, repair damage and damage to main engine diesel and hydraulic, electrical secondary systems, electronic, repair woods on flatbed, Paint HVLP ELECTROSTATIC guns pneumatic of construction machinery as scrubbers, crane, machines blades, tractor, and packers. Change of parts of the machinery. Grease moving parts. I am filling diesel, DOE, filling liquids such as antifreeze, motor oil, brake liquid and water, and hydra oil pistons. Cleaning the engine and equipment, controls cleaning, repair of wire fencing, and placement of Cattle fence posts. Land cleaning, assembly, and pipe laying. Staking Using equipment such as saws, jackhammers, drills, electric arc welding CORD, TIG.MIG. Handling tractor and vibrato packer.

COMPANY: BAKER BOY INC (DICKINSON NORTH DAKOTA USA). POSITION: PRODUCTION PACKAGER AND LIFTHER LABOR.

PERIOD: JUNE 2012 to JANUARY 2014.

Activities: General production work as they are loading trays, bringing metal carts, collecting metal carts, putting the rack in the oven, bringing racks of the bread line, feed line with trays, loading the rack tray, packing the bread in various boxes, packing the boxes on pallets, take pallets to storage areas, cleaning equipment, cleaning of conveyor belts, cleaning floors, cleaning pipes, bands, and production equipment, sanitation, load the production lines bread, bread accommodate properly, check and ensure the quality of dough and bread as well as the packaging, and continuous fluid communication with my team leaders and supervisors of production in English all the time. I was driving the Gas and Electric lifter in the warehouse. COMPANY: TRANSFORMACIONES IBEROAMERICA INC.

POSITION: PRODUCTION MANAGER.

PERIOD: NOVEMBER 2010 to MARCH 2012.

Activities: I have developed 15 different chemicals for wastewater treatment and use in pools, as well as general cleaning products, through new product development, and scheduled production based on a quarterly sales forecast, I have developed the manufacturing processes for different products in both the powder and liquid in the area, develop procedure manuals for the manufacture of products, design the processing equipment of powders and liquids in a team of welders, scaled the cost of equipment 35% less with the change of design, lower manufacturing costs by 25% with the new procedures, currently working on new developments and to lay the groundwork for next year look for the ISO-900, I set up an inventory control warehouse management with SAP, as well as making lots of production and costing process unit cells, teach courses on the proper use of chemicals at the national and Central America.

COMPANY: SANMINA-SCI INC.

POSITION: ENVIRONMENTAL AND SAFETY ENGINEER (E.H.S). PERIOD: JULY 2006 to January 2009.

Activities: Industrial Security Projects at the three levels, environmental security, personal safety, and property security, project development management of hazardous waste according to the classification of CRETIB, and standards NFPA, STPS, and the law of ecological balance, project development waste management environmental management

(environmental waste) from CRETIB and the law of ecological balance, project development for the contingency plan based on the search and rescue brigades. evacuation, first aid and firefighting, project development for the operation of joint committees for each of the plants, renovation of storage of hazardous and chemical materials according to law rules STPS and ecological balance, fulfillment Study of light, noise study, study isokinetic (atmospheric pollutants, mechanical safety study NOM-04-by-post risk study, study for the purchase and use of personal protective equipment (PPE) per machine and post ( POE) NOM-17, development of chemical management program (NOM NOM-05- 10), development of hazardous waste and non-hazardous HOSAS-18000 (recycle) (NOM-18, NOM-26 ISO 14000) COA reports its final disposition, determination of industrial safety program for new revenues, development of safety data sheets, development and control of plant accident (compilation of the index of claims) through prevention campaigns such as cargo handling and watch your hands, courses, development of brochures, team work with occupational health to control accidents, safety program diffusion HOSAS- 18000, emergency response NOM-02, program development for the issue of licenses risky work height, open flame, coordination with the departments of Eng. of equipment, process and production, occupational health, participation and attestation of inspections and audits of government agencies SEMADES, SIAPA, PROFEPA, PROTECTION CIVIL, FIRE, after clearance of the license of operation, implementation of the courses for civil protection and development of self-management project, certified trainer before STPS GOVERNMENT OACO-661015 2CA -0005.

COMPANY: INDUKER PHARMACEUTICAL LABORATORIES INC.

POSITION: PRODUCTION MANAGER.

PERIOD: OCTOBER 1998 TO JULY 2005.

Activities: Production is planned according to the estimated half-yearly sales for some products, programming was done six months of this monthly to weekly and thus per day per shift in accordance with the capabilities of the equipment and layout of raw materials and production personnel, control of production batch quantity, quality time for delivery all the time, checking controls and checkpoints by the laboratory, checking the quality of batches of raw materials, development of formulations with penicillin 4th, 5th and sixth generation (ivermectin, gentamicin, etc..) and preparation of analgesics, multivitamins and protein powder by homogenization processes ribbon blenders and paddle, as well as pants, development of formulations for remove parasites, serum liquid mixing tank and automatic cup filling gravitational development of equipment for the production of liquids and powders, management and sterile clean room measuring particles in the air, soda cleaning equipment, hot water, cold and taking samples for physicochemical analysis, biological, sanitizing equipment and packaging lines, reconditioned products, development of manuals of good manufacturing practices, development of manuals ISO standards 9000 -14 000, management and control of plant wastewater treatment dig ester reactor in the process of alkali - acid neutralization and control of parameters for discharge into drainage industrial park. (Controls following standard national sewer water), unionized personnel management, skills development multi-function for operators, and making the labels of the products. COMPANY: CALTECO AGRO- CHEMICAL INC.

POSITION: HEAD BUYER.

PERIOD: SEPTEMBER 1995. TO SEPTEMBER 1998.

Activities: Purchases of all kinds of products, general stationery, auto parts, office furniture, computer equipment, laboratory equipment, and safety, chemical reagents, tortilla, hardware, plates and profiles, international shopping and mining rig and their parts, industrial process equipment, development of computerized shopping with reorder point by time or batch economic management MRP II and costing structures with constant or variable costs, development of national and international suppliers, management accounting sequential and purchase orders, management of office staff, drivers and the vehicles of transportation, logistics, and critical path routes Rolling Stone, PowerPoint, internet, stat graphics. COMPANY: PHILLIPS LOCKS AND PADLOCKS INC.

POSITION: PRODUCTION SUPERVISOR (ENG. PRODUCT).

PERIOD: JUNE 1992. TO AUGUST 1995

Activities: Control plating production lines, phosphate, acid copper, nickel, zinc, bluing, and anodized (natural, gold, and black), nickel removal, adjustment of electrolyte solutions through-hull cells and laboratory analysis, electrostatic painting, operation plant wastewater treatment and reverse osmosis ultra-pure water. Balancing line and process re-engineering (layout), inventory control, and scheduling for MRPII production. Quality audits to the statistical tools letters p, XR, Six Sigma, production of manuals and records, and quality audits according to ISO 9000. Training in six sigma statistical tools. Stat graphics, Paint HVLP ELECTROSTATIC guns, use of PC (Windows, Word, Excel, and PowerPoint), care providers, and management of unionized workers both-sexes.



Contact this candidate