ANKUSH
KAUL
CIVIL ENGINEER
PROFILE
An experienced professional in
billing & planning field of
construction with excellent time
management skills and a can-do
attitude. Inclined towards the
technical aspects of civil
engineering field.
As a graduate in B.E(Civil
Engineering) and having 5+ years
of relevant experience in various
civil engineering projects like
industrial, commercial &
residential,
CONTACT
+ 91 - 971-***-****
adwn4h@r.postjobfree.com
EMX – 01, Indus Town, Bhopal,
EDUCATION
Passed Senior Secondary School
Certificate with 74.8 % of marks in
2008.
Passed Higher Secondary School
Certificate with 65.6 % of marks in
2010.
WORK EXPERIENCE
GARDENIA INDIA LTD [BILLING ENGINEER]
July 2014 – March 2016
BBS preparation, material wastage calculation, indentation of material available in store, sub contractor’s bill preparation, column layout, quantity analysis of various civil construction work on site using architectural, structural drawings, Auto cad 2D, MS Excel.
GARDENIA GATEWAY, NOIDA
A township with 20, G+21 towers located at sector 74 Noida that took responsibility of elevating the lifestyle of the residents of Noida, by giving them a taste of both luxury and peace of mind under one roof, with its open terrace pool facilities, terrace gardens, etc.
SOM PROJECTS PRIVATE LTD [BILLING ENGINEER]
April’2016 – Aug’2016
BBS preparation, COR preparation, client billing, subcontractor billing, design of rigid pavement, estimation & costing of various civil engineering work, material testing and relevant document preparation, reconciliation of cement, sand, coarse aggregate, reinforcement steel, etc.
TATA NANO PLANT, SANAND, AHMEDABAD
An industrial project set up to produce “Tata Nano” by automobile giant “Tata Motors”.
SOM projects, pt. ltd., a construction contractor firm that deals with under maintenance related work of the plant,
SAFAL GOYAL REALITY LLP [BILLING ENGINEER]
Graduated in B.E. (Civil
Engineering) with 74.60 % of marks
from Bansal Institute of Research
Technology and Sciences in 2014.
NAUKRI PROFILE
LINKEDIN PROFILE
HOBBIES
Reading facts & figures.
Curiosity of knowing things.
Meditation.
Cooking.
SKILLS
Auto cad 2D
M S Excel
M S Projects
Communication Skills
Presentation Skills
LANGUAGES KNOWN
English
Sanskrit
Hindi
Gujarati
Punjabi
Sep’ 2016 – Sep’ 2019
Responsible for preparation & documentation of monthly client bill, certification of contractor’s bill, scheduling construction activities, planning & preparation of monthly material consumption, calculation of wastage of materials, etc. SKYCITY, AHMEDABAD
A 304 acres residential and commercial project with bungalow and high - rise residential schemes named “Sky city Arcade”,
“Aakash Residency 1, 2 & 3 “, “Riveira Elite”, a low-rise commercial project named “Sky city arcade”.
NKG INFRASTRUCTURE LIMITED [BILLING ENGINEER]
Sep’2020 – Feb’2021
Responsible for timely preparation, submission and documentation of sub contractor’s monthly bills & scheduling construction activities using MS projects, BBS preparation, etc. JABALPUR AIRPORT, JABALPUR
A state government project that was allocated to NKG Infrastructure ltd. for the expansion of runway for landing and take-off for “Airbus 380”.
ALL INDIA INSTITUTE OF MEDICAL SCIENCES, DEOGHAR
A central government project that needs no introduction. CIVIL ENGINEERING CERTIFICATE
CERTIFICATE IN GRADUATE APTITUDE TEST IN ENGINEERING 2019 Designing of RCC & Steel Structures using seismic load, wind load, live load, impact load and dead load as per IS code. Calculation of active & passive earth pressure as per soil test report.
Design of highway geomatics, road safety sign, etc. To calculate depth of rainfall in a catchment area, surface runoff, design of septic tank, Imhoff tank, sedimentation tank. To calculate water requirement for a crop.
Learned to do surveying, levelling and contouring on a piece of land.
CERTIFICATE IN SCHEDULING TECHNIQUES FOR CONSTRUCTION PLANNING & MANAGEMENT ISSUED BY IIT MADRAS
Identify critical path using critical path method. Learned precedence diagramming method, resource driven scheduling.
Made a schedule for the various construction activities to be carried out for the installation of a library using resource driven scheduling.