Brandy Sheardown
I had been with DGS Astro Paving for 17 years as a Quality Control
Technician. I was responsible for sampling and testing of all materials out of the DGS Taylor Pit responsible for meeting the required standards, and if required, requested changes to DGS’s Asphalt Plant and crushing operations. My daily responsibilities included being DGS’s Lab Supervisor overseeing the training and mentor-ship of junior technicians. My seventeen years of working at DGS took me all through the Peace Country, from Fort Nelson to Tumbler Ridge and I know the area well.
I has been a member of the Fort St. John community for the past fifteen years as a mother, wife and homeowner.
Training:
EPS Aggregate Testing
EPS Asphalt testing
Preparation in EPS Blanks
EPS Coring
Taylor Pit Asphalt Production
Taylor Pit Aggregate Production
CCIL Asphalt Certification
CCIL Gravel Certification
EDUCATION:
Graduated for Osoyoos Secondary School in 2000.
WORK EXPERIENCE:
ACP TESTING / DGS ASTRO PAVING 2004 TO PRESENT
SENIOR QUALITY CONTROL TECHNICIAN
Various Projects Include
Municipal Asphalt Paving 2004 - 2020
Taylor Pit Asphalt Production 2004 - 2020
Taylor Pit Aggregate Production 2004 – 2020
Chetwynd Redi Mix Aggregate Production 2004- 2020
Phase 1 and 2 EPS Alaska Hwy Project 2005
EPS West Bypass Project 2008
Texaco Bridge Replacement
City of Fort St. John LAS
Fort Nelson Public Works Paving 2013
Fort Nelson First Nations Paving 2013
Hwy# 97 63 mile passing lane (2015)
Hwy# 97 Chetwynd- Base and Frost Treatment (2015)
Pine Pass Flood Repairs (2016)
DGR Signalization- EPS (2016)
Old Fort Road- EPS (2017)
NP Side Roads- EPS (2017/18)
South Peace Flood Repairs (2017/18)
Zonnebeke Culvert Replacement (2018/2019)
Farrell Creek Rd (2018)
Wonowon Road Improvements (2020)