Post Job Free

Resume

Sign in

Production Manager Chemical Engineer

Location:
Riyadh, Saudi Arabia
Salary:
35000SR
Posted:
April 10, 2023

Contact this candidate

Resume:

ABOUT ME

To work with leading organization

and achieve all the KPI’s for the

plants with e ciency and

commitment. Keep close eye on

each part of the Project.Work hard

for better output from existing

units and try to implement

measures for the improvement of

the system regarding fuel, energy

and manpower.

EDUCATION

University Of The Punjab Lahore /

Lahore / 2007

SKILLS

WORKFORCE TRAINING

TRAINING COORDINATION

PROCESS CERTIFICATION

PERFORMANCE EVALUATION

MAINTENANCE PLANNING

PLANNED EQUIPMENT CONSTRAINTS

CONTINUOUS IMPROVEMENT

PROCESSES

HEALTH AND SAFETY COMPLIANCE

KNOWLEDGE OF 5S METHODOLOGY

EXPERIENCED IN PRODUCTION

SCHEDULING

WORK EXPERIENCE

Bisha Saudi Arabia

Mar 2020 - Present

• Responsible for two lines of cement production as one is FLSmidth (Denmark) 4000TPD and other is Sinoma

(China)5000TPD.

• Section Head of the following Sections are reporting to me 1) Production 2) Quality Control 3) Garage 4) Quarry 5) Civil

• Provided assistance to teams in all manufacturing areas, including safety, inventory control, and implementing processes.

• Achieveing KPI's e ciently and targets for Production and Sales eagerly.

• Planning for the annual budget and planning for shutdown jobs.

• Resolve product and equipment issues and improved quality of manufactured items by systematic monitoring of

processes.

• Over 200+Employee working under me.

Mian Wali Pakistan

Nov 2017 - Dec 2019

•Working as Manager in Production for the commissioning of 7300 tpd new line as its FLSmidth line.

•Successfully completed the project and run it up to full capacity.

•Leading the Commissiong team to complete successfully all stages up to Performance Guarantee test.

•Planning work in progress for future targets and shutdown.

•Area punch list and routine jobs listing being accomplished by coordinating with maintenance department.

•Daily DPR preparation to maintain all records for production and sales.

•Manpower distribution and handling.

•During my stay in Maple Leaf I was also in charge of 2 FLSmidth lines having capacities of 4000 and 6700 tpd five stage pre heater kiln, In line calciner with multi fuel used for burning as oil and coal at main burner and oil, coal and pet coke used at PC burner. We used now up to 30 % of the Pet Coke at PC.

Turaif Saudi Arabia

Aug 2012 - Aug 2017

• Worked as Production UnitChief and worked as

Commissioning Engineer during commissioning of line 2.

• Comprised of two modern turnkey green field lines, one is CTIEC and other is Sinoma by China.

• Each having capacities of 5000tpd five stages pre heater, In line calciner oil fired kiln with ICAN single drive cooler & all BSC CHEMICAL

ENGINEERING

SOUTHERN

PROVINCE CEMENT

CO

Production Manager

MAPLE LEAF

CEMENT COMPNAY

Production Manager

ALJOUF CEMENT

COMPANY

Unit Chief Production

MUHAMMAD

ASAD

PRODUCTION MANAGER

House # DD-45 Street # 4 Sector D

Bahria Town, Lahore, Pakistan

+923********* +966*********

adwgi7@r.postjobfree.com

LANGUAGES

ENGLISH

ARABIC

URDU

DRIVING LICENSE

Driving license category

Saudi Driving License

PERSONAL DETAILS

Date of birth

01/12/1983

Nationality

Pakistani

Visa status

Valid Work Visa Saudi Arabia

Marital status

Married

modern supporting equipments.1500tph lime stone crusher, 450tph vertical mills (UBE, Japan and Pfei er Germany). Four cement mills each having 150 tph capacity for clinker grinding and PLC by Siemens China Up-graded version (PCS 7). Packing Plant by H&B, Germany. Auto Packer by Beumer. Attock Pakistan

Jun 2007 - Jul 2012

• Worked as Shift Engineer and later as Commissioning Engineer on the first major project of Polysius Germany in Pakistan having capacity of 7200TPD which is currently Pakistan’s Largest.

• Unit having latest Plc. by ABB Switzerland. DOROL Vertical Raw Mill having capacity 560 TPH (Output, dry basis) and DOROL Vertical Coal Mill having capacity 50 TPH for Coal grinding.

• POLRO Kiln (78*5.2~5.8 m (nominal dia)) 7200 TPD clinker production plant.

• Double string Pre heater with inline Calciner. Polytrack Cooler with Roller Crusher in center.

• Two Vertical Cement Mills LM 53.3+3 by Loesche, Germany having capacity of 180TPH each.

COURSES

May 2015

Jul 2016

Sep 2016

Oct 2021

Apr 2022

HOBBIES

SWIMMING TABLE TENNIS

FAUJI CEMENT

COMPANY

Shift Engineer

SINOMA Process Engineering

REFRATECHNIK

GERMANY

Refractory Installation

SAUDI ENERGY

COMMISSION OF

RADIATION EXPERT

Radiation Protection

LABS ( LOGICAL

APPLICATION FOR

BUSINESS SOLUTIONS)

SAP S/4 HANA

AL JAHOOD Succession Program



Contact this candidate