Post Job Free

Resume

Sign in

Journeyman Electrician Electric Co

Location:
Seattle, WA
Posted:
April 08, 2023

Contact this candidate

Resume:

OBJECTIVE

I wish to obtain technically challenging employment as a journeyman electrician in an industrial, commercial, residential, or maintenance capacity.

HOW TO REACH ME

adwfr0@r.postjobfree.com 1-907-***-****

SKILLS

•Fire Alarm4 (4 years)

•Msha (1 year)

•Flash (5 years)

•Electrical (10+ years)

•Blueprints (10+ years)

•Maintenance (10+ years)

•Hand Tools (10+ years)

•Blueprint Reading

•Low Voltage

•Cabling

•NEC

•Programmable Logic Controllers

•Troubleshooting

•Equipment Repair

•Fabrication

•Electrical experience

EDUCATION & TRAINING

PLC & VFD Advanced Programming in PLC & VFD Advanced Programming

ELECTRICAL TRAINING SCHOOL

February 2020 to Present Online VIN 95

West Anchorage High School

HIGH SCHOOL DIPLOMA 2009

February 2020 to Present Online VIN 95

WORK HISTORY

Journeyman Electrician

Build Force - February 2022 TO April 2022 and September 2022 to Current

Commercial Remodel.

Journeyman Electrician

Hard Hat Resource Solution - August 2022 TO September 2022

FedEx Hangar Construction.

Journeyman Electrician

Access Skilled Resources - April 2022 TO September 2022

Temporary - On Call

Journeyman Electrician

Conoco Phillips - December 2021 TO February 2022

Commercial installations on hangar expansion.

Journeyman Electrician

ELECTRICAL FIELD SERVICES INC- March 2022 TO Current

Commercial installations at a wastewater treatment facility

Journeyman Electrician

SILVERBAY SEAFOOD - MAY 2021 TO JULY 2021

Maintain Electrical Equipment during the season, whatever it takes to keep Plant going

Journeyman Electrician

LUDVIK ELECTRIC CO. - SALT LAKE CITY, UT - MARCH 2020 TO MAY 2020

Commercial installations on airport expansion.

Journeyman Electrician

GLOBAL / PAUL DALTON / NESCO / KONISTO / - MINNESOTA- JULY 2019 TO OCTOBER 2019

Solar electrical work for these four contractors in Minnesota.

Journeyman Electrician

SAMSON ELECTRIC INC. - BETHEL, AK - FEBRUARY 2019 TO JUNE 2019

Electrical Installations on the hospital project

PREVIOUS WORK (CONTINUED)

Journeyman Electrician

HSE - SAINT CLOUD, MN - DECEMBER 2018 TO JANUARY 2019

Work on Solar Projects

Journeyman Electrician

TRIDENT SEAFOODS CORPORATION - AKUTAN, AK - AUGUST 2017 TO NOVEMBER 2018

Maintain all electrical equipment in the plant, and all other electrical apparatus on the Akutan Trident Seafood plant including vids, soft starts, and plc's (input and outputs devices, no programming, however, taking a course on it) to keep the processing plant going.

Journeyman Electrician

CONAM CONSTRUCTION - ANCHORAGE, AK SEPTEMBER 2018 TO OCTOBER 2018

Wired and installed equipment for well houses at Milne Point

Journeyman Electrician

BIG G ELECTRIC AND ENGINEERING - SOLDOTNA, AK AUGUST 2018 TO SEPTEMBER 2018

Worked on 2 turnarounds at bp oilfield gc2 and flow 3 primarily changing out MCC buckets

Journeyman Electrician

GLOBAL / PAUL DALTON / NESCO / KONISTO / - MINNESOTA- JULY 2019 TO OCTOBER 2019

Solar electrical work for these four contractors in Minnesota.

Journeyman Electrician

SAMSON ELECTRIC INC. - BETHEL, AK - FEBRUARY 2019 TO JUNE 2019

Electrical Installations on the hospital project

Journeyman Electrician

GLACIER ELECTRIC - ANCHORAGE, AK - JULY 2016 TO OCTOBER 2017

Installed High bay fixtures emt up to 3" terminated lighting contactors, panelboards grow light for hydroponics plant

Journeyman Electrician

KUPARUK, AK - MARCH 2013 TO OCTOBER 2015

Hooked up communication modules for GCI at point Thompson, installed cable tray, FHLMC cable, rigid conduit, terminated various conductors in panels, communication cabinets, and terminal boxes, and hooked up drilling rigs to utility power with 13.8kv or 34.5kv. Built 15kv elbow breaks and bolt ups, 35kv bolt ups installed various wiring methods in modules and process facilities, and packed cables.

Journeyman Electrician

ALL-ALASKA ELECTRIC - PRUDHOE BAY, AK SEPTEMBER 2012 TO FEBRUARY 2013

Installed electrical systems on two camps both retrofitted for breaking down and putting back together to be able to move camps. Used mchl wire way and so. with the pin and sleeve plugs laid out and fabricated support systems. Built two diesel additive fuel modules with no prints using conduit. Two electrical remodel jobs.

Journeyman Electrician

KUPARUK, AK- MARCH 2012 TO AUGUST 2012

Operation and maintenance position; Worked with all crew. High-line crew, hooked up and de-energized rigs when they move involved using 15kvand 35kv, feeder cables, hi-potting cables, and a staging support system for feeder cables. Well, house lateral crew duties; remove instruments and devices, rolled back power and instrument cables. Replace damaged ones. Installed a new heat trace system on new well house pipe laterals. Field primarily installed a new choke panel system that included work with VEDS that controlled the down pump and the speed-rated transformers. Shut down crew, the crew helped with pre-work on one of Kuparuk's process facilities.

Journeyman Electrician

CH2M-HILL - OLIKTOK POINT, AK JUNE 2010 TO OCTOBER 2011

Performed many facets of industrial work including supervision of two apprentices. Pulled, stripped, and stuffed multiple types of conductors; installed cable tray. Bent and installed ridged metal conduit. Installed temporary power to facilities; Installed and troubleshot transformers, switch gears, programmable logic controls, control cabinets, motor control centers, and panel boards.



Contact this candidate