Post Job Free

Resume

Sign in

Land Surveyor Construction Inspector

Location:
Oak Creek, WI
Salary:
100,000
Posted:
April 07, 2023

Contact this candidate

Resume:

Omoregie Igiehon

**** * ******* ******* **, Oak Creek, WI 53154

(adwesx@r.postjobfree.com) 312-***-****

Summary

I am an assistant Project Manager and a Land Surveyor Crew Chief with over twenty-five (25) years’ experience collecting professional field data for architects and engineers.

Organized and worked in many different projects in design and construction.

Developed a passion for establishing Project Management and Land Surveyor procedures for field and office operations.

Acquired outstanding communication and interpersonal skills.

Planned and led teams to achieve and surpass corporate goals.

A hard worker who puts the interest of the organization first.

Dedicated, reliable, and an asset to any team and organization.

Proficient in using the Leica, and Trimble total station (Fully Robotic) and GPS systems, with a little experience in laser scanning.

Familiar with word, excel, power point presentation.

Education and Training

Herzing University-Madison WI December 2022

B.S. Project Management

Madison Area Technical College.

Associate in Civil Engineering September 2018

Devry University

Project Management Certificate September 2010

Oakton Community College

AutoCAD Certificate September 2004

Government technical College Department of Science and Technology, Ogun State, Nigeria

Associate Degree Mechanical Engineering Craft September 1992

Employment

KGPCo 2022-Present

Martin & Whitacre 2022-2022

Toki & Associates 2020-2022

Millman Land Services 2019-2020

Payne & Dolan 2019-2019

Himalayan Consultants LLC 2019-2019

Burse Surveying & Engineering 2018-2018

Accurate Group Inc 2014-2018

Wayles Engineering Surveying 2009-2014

D.B. Sterlin Consultants Inc 2002-2009

Teng & Associates 2000-2002

Wayles Engineering 1999-2000

A.P. Surveying, Wilmette, Illinois 1997-1999

Kanuyi Industry (Carpenter Nail Manufacturers) 1992-1996

Highlights of Projects Completed

Assistant Project Manager/Land Surveyor/Operations, Production, and Maintenance Manager

KGPCo

Monitoring and Supervising the placement of underground conduit cable for 5G network (Ongoing).

Martin & Whitacre/Crew Chief:

Location of lot corners (LOC) and section corners (SCR) for the purpose of eminent domain in the city of Wapello, Iowa.

Toki & Associates:

Assistance Project Management,

Construction Inspector

Survey Crew Chief.

Himalayan Consultants Inc/Crew Chief:

Land Surveyor Crew chief

Staking of pavement and bridges.

Burse Surveying & Engineering/Crew Chief:

Land Surveyor Crew Chief

Staking of foundation for Real estate developers

Measuring and drafting of Regular

Alta, and Topographic Surveys.

Accurate Group Inc/Crew Chief: Expansion and remodeling of I-94 exit and entry ramp (8 ramps) at grand Ave in the city of Gurnee Illinois.

The setting of horizontal and vertical control

Taking topo of existing ramps

Monitoring quantity control of excavation of asphalt, concrete, and base rock foundation. Staking and grading of all ramps (cuts and fill)

Topo of final as built.

D.B. Sterlin Inc/ Crew Chief:

Popular Creek, Addison Creek, and Plainfield Creek. Topographic data to support the development of hydraulic models for the evaluation of streams and waterways located in the western cook county.

Taking cross section of streams and waterways.

Developed maps showing location of control points, performed quality assurance, confirmed the relative accuracy of existing benchmarks.

Lemont Plant Expansion MWRD Chicago, Illinois: Full boundary and topo survey (11 miles).

Lower Des Plaines Watershed: Taking cross sections of the Des Plaines River to enable evaluation of flood control (FEMA).

IDOT Illinois 71: Set control (Horizontal and vertical), run level loop, take topography.

Stickney Water Treatment Plant (MWRD) Chicago: Setting control (Horizontal and vertical) to monitor the installation of structures.

IDOT US Route 41: Setting control (Horizontal and vertical), stake and grade (cuts and fills).

West Kinzie Ave: Set control (Horizontal and vertical), and take topographic survey.

I-94 Reconstruction and Widening (ISTHA 1-06-5424), Ill-132 to Ill Russell Rd, Grand Ave to the Wisconsin state line. Resurfacing and widening, setting control, topography of existing roadway, staking out, grading, elevation control from pilling to as built, quality and quantity control.

Calumet-Sag Watershed Plan, Phase B: Running a level loop for elevation control of structures. Metra, 95th and Cottage Grove Rd: Setting horizontal and vertical control for full topo, construction layout, elevation control of new platform and railway station building.

Solidarity Drive-Lake Front Underpass: Setting horizontal and vertical control, staking out pilling positions, controlling pilling elevations and structures, stakeout roadway, grades as in cuts and fills, topo of final as built.

Metra, 26th and Cicero: Setting horizontal and vertical control, topographic survey.

Hydraulic Survey at I-294/Des Plaines River: Setting horizontal and vertical control for cross sections every 50 feet of the Des Plaines River, 1000 feet east and west of the I 94 bridge.

Teng & Associates Survey Technician

Topography survey

Reconstruction and widening of I-294 between Dundee Rd and Lake Cook Rd.

I-80 Topographic survey

I-394 reconstruction

North Michigan Ave Chicago Ill.

George, Barry, Menard, Altgeld and Nelson Street.

I-90 Devon Plaza to River Rd Plaza

111th, Peoria, and green Street.

Learned, Ardmore, Catalpa, Lavergne, and Strong Street

Luna, Leland, Column, Kostner, Kilbourne, and Menard Street.

Adams Street over Union Station in Chicago Ill.

Indiana Skyway

18th Street Overpass

11th Street underpass

Carol Avenue

Metra Station in Cicero Ill

Columbus Drive underpass in Chicago Ill.

O’Hare International airport

Center street Chicago Ill’159th and River Oaks.

Shed Aquarium Underpass

I-55 Toll Plaza



Contact this candidate