Post Job Free
Sign in

Electrical Engineer Construction Manager

Location:
Al Dafna, Qatar
Posted:
April 03, 2023

Contact this candidate

Resume:

Page *

Muhammad Zubair

Electrical Engineer.

Contact: +974********, +92-333*******

Email: ***.********@*****.***

linkedin.com/in/muhammad-zubair-647a5b150

Overview,

I have More than 10 Years Of experience at mega Projects in Pakistan, Dubai & QATAR, of Building MEP Services Design/Supervision. Education

BSc

(Electrical Engineering) NFC Institute of Engineering & Fertilizer Research Faisalabad. Certification by (Chartered Institute of Environmental Health) LONDON SE1 8DJ

Health and Safety Level 1 & 2.

Emergency First Aid Level 1& 2.

Fire Safety Principles (QCF) Level 1 & 2.

Supervisor Leadership Training.

Tunnel & Safety Course.

CCRM Level 3 Training for Metro Rail. (ID 37676)

Person In Charge (PIC)- Level 2&3 Training for Metro Rail. (ID M19074269)

Course in Cable Testing & Commissioning.

Certified in LOCKOUT TAG OUT Training. (ASP-LOTO-060**********)

Training session, covering the Operation and Maintenance of Novec1230/FM200 Clean Agent Fire Suppression System Comprising of Kidde Novec1230 System, Scame System SIL-2 Panels & Hochiki SIL-2 Detection systems.

Certificate of Appreciation from RLR HSE (Qatar Rail)

Resume: Muhammad Zubair

Page 2

Employment Record,

Singapore Engineering and Contracting WLL.

MEP Manager

04 Feb 2022 to till date.

Projects:

Gewan Island Golf Course Hotel Beach Club, Qatar. Mughals Pakistan Pvt Ltd.

MEP Manager

05 Mar 2022 to 30 Jan 2022.

Projects:

Construction of DHA Head Office Multan.

Construction of Rumanza DHA Multan.

REDCO International WLL.

MEP Construction Manager

18 Nov 2020 to 10 Feb 2022.

Projects:

EXTERNAL WORK FOR LUSAIL STADIUM AND PRECINCS

DEVELOPMENT OF AL WUKAIR LOGISTICS PARK - PARCEL "C" MANATEQ. Itinera Ghantoot Joint Venture.

Electrical Manager

24 Feb 2020 to 15 July 2020.

Project:

REEM MALL Sector no. PR1, Plot no. (C5) – REEM ISLAND ABU DABHI, UAE. RLR Joint Venture of Rizzani de Eccher Spa, Qatar

Lotte Engineering & Construction Co. Ltd.

Redco International Trading & Contracting WLL.

Sr. Electrical Engineer

31 May 2016 to 15 Feb 2020.

Projects:

Doha Metro Train Green & Red Line Underground and Red Line Elevated Project.

Resume: Muhammad Zubair

Habib Rafiq (Pvt) Ltd.

Electrical Engineer

23 Sep 2015 to 25 May 2016.

Projects:

Construction of Islamabad High Court Project.

Guarantee Engineers (Pvt.) Ltd.

Electrical Engineer

17 Sep 2013 to 22 Sep 2015.

Project:

The Emporium Mall Lahore.

Habib Rafiq (Pvt) Ltd.

Electrical Sub Engineer

2.5 Year

Projects:

NADRA Provincial Head Office Complex Johar Town Lahore. Summary of Career:

Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local or international.

Reviewing technical specifications for installation and commissioning of the system. Technical discussions and document approval from consultant /client.

Project Procurement, Planning, and Site Work Progress Monitoring.

Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to execution of any jobs.

Managing electrical components and related cost estimates.

Installation, testing and commissioning, operation, and maintenance of electrical types of equipment and distribution systems.

Supervise review and coordination of submittals and shop drawings.

Excellent problem-solving skills and the ability to confidently and decisively take action.

Designing and managing Single-phase, three-phase control system troubleshooting and fixing the problem.

Containment, wiring, termination and testing and commissioning and Integration with SCADA of UPS, CCTV, VFD, Novec 1230, Fire Alarm, Parking System, Fire Telephone, Public Address, Telephone, TVM, AFC gates, Dali Control panel, Pre Action Assembly, Networking and Card access.

All the MEP services integrated with BMS.

Resume: Muhammad Zubair

Page 4

Installation and Maintenance of process field instrument PLC interfacing Through VFD Pre Commissioning according to specified specification datasheet.

Witnessed and Performed all stages of testing commissioning, Partial Stand-Alone Test, Stand-Alone Test, and System Integration Test.

Plan and schedule projects, estimate time and materials, supervise subordinates, maintain records and files and prepare reports.

Coordinated the start-up of chillers, All HVAC Equipment, Pumps, Smoke curtain, air curtain, sliding doors, roller shutters, VHTS, dampers, exhaust fan, hydrogen sensor, leak detection system, disabled toilet, and fire pumps.

Involved in QCDD inspection readiness, MEP System checks, and Independent Safety Assessment inspection.

Caring for the client during the installation, answering questions, keeping them informed, handing over the installation when complete, and supervision day to day of a team of electricians and apprentices.

Involved all BACS/SCADA/ICC aspects of the project with a focus on instrumentation, control, and integration.

Coordinated third-party services like Ooredoo, Vodafone, QNBN, MOI, and QAF. Skills

Revit Skill for 3D Coordination/Quantities Drawing.

Microsoft office.

Fire Alarm Well Knowledge about Life Safety Services Integration.

All MEP equipment’s interfacing/Integration with BMC/BACS System.

Instruction with Auto Cad, Internet & email.

Follow up with the procurement team for the pending material and keep in touch with the Store team.

Well knowledge about all kinds of permit procedures, Personal Information

Father name Abdul Qayyum (Late)

Religion Islam

Marital Status Married

Domicile Punjab

Nationality Pakistani

Passport # CL5091662

CNIC # 366**********

Reference

Reference will be furnished upon request



Contact this candidate