Name: Mr. Prakash K. Chhatpar
Email adwa5h@r.postjobfree.com,
adwa5h@r.postjobfree.com
PERMANENT ADDRESS
FLAT NO:A(202)
Sweet Co-op. Housing Society Sector-14,
PLOT No :-19 JUHUNAGAR
VASHI NAVIMUMBAI-400705
MAHARAHSTRA
Contact No :
ADDRESS: FLAT NO:A(202)
Sweet Co-op. Housing Society Sector-14,
PLOT No :-19 JUHUNAGAR
VASHI NAVIMUMBAI-400705
MAHARAHSTRA
Date of Birth: 23rd June 1969
Status: Married
Nationality: INDIAN
Languages Known:
Hindi, English, Gujarati, Sindhi
Passport No. : F-8250938
Visa Status: Employment Visa Expire: 20thDEC 2013
Position: Senior Engineer (Civil)
CAREER OBJECTIVE
I believe in offering my services to the organization, which uses my abilities to the fullest extent, so that the organization and I can work in tandem to reach the pinnacle of success.
EDUCATION QUALIFICATION
DIPLOMMA IN CIVIL ENGINEERING 1989-1993 NOV FROM GOVERNMENT POLYTECHNIC PORBANDAR
WORKING EXPERIENCE 10YEARS SIX 6MONTH INDIAN
EXPERIENCE 08 YRS 6 month GULF EXPERIENCE
POSITION : SENIOR PROJECT ENGINEER
EXPERIENCE – TWENTY (20) YEARS
08Years in UAE AND SULTANATE OF OMAN
As Senior Project Engineer in AL BAHJA CIVIL CONSTRUCTION LLC BASED SULTANATE OF OMAN
Projects Landmark completed
#1Industrial Warehouse at NUWAS OMAN CABLE FACTORY EXTENSION AT AT RUSYAL FACTORY SHED Consultant SEMAC AND PARTNERS including seprate staff office workshop loading and unloading bay in Duration 4 months all civil substructure and superstructure with anchor bolt pedestal columns
#2 1 AND HALF YEAR AT NIZWA HISN-AL SHAMOOKH PALACE EXTENSION PACKAGE 14A FOR CONSTRUCTION Consultant IBN KHALEEDAIN AHMEDIAN FOR CONSTRUCTION OF SERVICE COMPOUND BUILDIND,RCA,BOUNDARY WALL,IT ROOM GUARD ROOM SUBSTATION AND EXTERNAL INFRASTRUCTURE WORK LIKE KERBSTONE,INTERLOCK AND INTERNAL ROAD
Previous Experience
Designation SENIOR ENGINEER in KHANSAHEB CIVIL ENGINEERING L.L.C DUBAI UAE 6 YEARS
Projects Landmark completed
1.WAFI PYRAMID RAFFELS HOTEL TOWERS – RASHIDIYA WAFI DUBAI - 2005 to 2007 completed double basement,GF+18 STORIED TOWER WITH MALLS AND HOTEL ROOMS APARTMENT .
Consultant: ARIF & BINTOAK
2.IBIS AND SUITES HOTEL – AL BARSHA DUBAI 2007 to 2009 (Basement +GF+ 6storey incl. lower and upper roof)
Consultant: AITKINS (client- Majid al futtain MAF).
3.PULLMAN HOTEL, MALL OF THE EMIRATES - AL BARSHA
Consultant: NORR (client - Majid al futtain MAF).
4.DUCAB INDUSTRIAL PROJECT - AT JEBEL ALI FOR CONSTRUCTION OF CCV TOWER AND VCV TOWER .
Consultant HYDER
Name: Mr. Prakash K. Chhatpar
PERMANENT ADDRESS
FLAT NO:A(202)
Sweet Co-op. Housing Society Sector-14,
PLOT No :-19 JUHUNAGAR
VASHI NAVIMUMBAI-400705
MAHARAHSTRA
Contact No :
ADDRESS: FLAT NO. 21Dakhliya technical college near lulu super market Nizwa firq round about
Dakhliya
Contact No : 009***********
Tel: +Mob: 009**********
Date of Birth: 23rd June 1969
Status: Married
Nationality: INDIAN
Languages Known:
Hindi, English, Gujarati, Sindhi
Passport No. : F-8250938
Visa Status: Employment Visa Expire: 20th Dec 2013
Position: Senior Engineer (Civil)
JOB RESPONSIBILITY
Checking of formwork, shuttering RCC PERI SHUTTER .RMD SHUTTER
Preparing Method Statement of work like tiling, screed, foam concretEWaterproofing, blockwork masonary raise flooring and risk assessment
Conducting routine inspection test for all Civil construction material as per British Standard both physical and chemical test at every 10M.T for all Diameter of bars
Procurement of test mill certificate from suppliers and vendors
Preparing LPOS for various materials
Check and execute work at site as per tender specification
Closing of NCR work done by subcontractors and issuing NCR to subcontractor and raising inspection to clear the NCR from clients.
Quality Assurance and quality control of materials
Preparing Inspection Test plans
Health safety of skilled and unskilled workers operators and machines
Preparing and submitting RFI, CVI & chasing
Obtaining Shop Drawings from Subcontractors and executing as per Shop Drawing
Coordinating for approval of drawings with Architect, RCC Consultant and local authorities all civil works.
Monitoring all building construction material quality control as per British standard and recording
Checking drawing and getting approval from local authorities like Municipality Prior to pouring of concrete.
Raise Inspection Request for major pouring of concrete.
Checking of Subcontractors work like Internal & External finishes of structures like block work, Auto clave aerated blocks marble flooring, Tile flooring, wall tiling, stud wall partition and false Ceiling etc.
Quantity survey putting material requisition preparing LPOS for all building materials.
Conducting meeting with various subcontractors, MEP Contractors for coordination and approval prior to concrete.
Managing big project construction works, control of construction schedules, control of cost and project planning.
Preparing Bar chart of various Civil activities like plumbing electrical Mechanical sanitary ware installation.
Checking of Quality Control for steel and concrete during and after concrete and monitoring results at 07 days and 28 days also recording
Fixing of mechanical cladding and surface preparation prior to Installing Dolhpur stones
Checking of Internal and external accessories for various activities and procurement of material from vendors
Safety Control of plant manpower and machineries
Checking raising inspection for activities like Kerb stone Fixing Bullnose type and straight edges type Quantity 27000meter
Checking raising insp.ection of interlock pavements Bevel Type Quantity 17kms
Checking preparation for internal roads prior to pre asphalting and post asphalting
MUMBAI-WORKING-EXPERIENCE-: 11Years
SNO
Company Name
Duration
Type of Project
Site Location
Designation
1
NAHAR AMRIT SHAKTI(FI0RELLO & FRANGIPANI
2003-2006
Multisoreyed GF+PODIUM+18
Chandivali Powai
ASSISTANT PROJECT MANAGER
2
RajYog Premises BHAVYA APARTMENTS
1999-2003
Residential cum commercial Building
Sewree/wadala
Site Engineer
3
Rotary MEC Engineering
1996-1999
Tankpads, terminals Truck loading cum unloading facility, Gantry,Petrochemical Industrial Project.
Indian OilTanking Navghar,Uran
Civil Engineer
4
ADVANCE CONSTRUCTION COMPANY
1994-1996
NRI MULTISOREYEDCOMPLEXES 11nos 18 storeyed RESIRENCY PROJECT
Seawood Estataes Nerul
Assisstant Engineer
MULTISTORIED OMPLEXES
RESPONSIBILITIES & JOB PROFILES :
•Involves in Supervising of Deep Foundation of substructures .
•Checking of formwork, shuttering and Reinforcement for all Structures.
•Coordinating for approval of drawings with Architect, RCC Consultant and local authorities all civil works.
Checking drawing and getting approval from local authorities pouring of concrete.
•Monitoring all building construction material quality control and recording.
•Checking drawing and getting approval from local authorities pouring of concrete.
•Verifying Subcontractor
Inspection Request for major pouring of concrete
•supervise and control of Structural Finishes Like internal external plastering,rendering,neeru plastering,stucco plastering,screed etc
•Internal & External finishes of structures like block work, marble flooring, Tile flooring, wall tiling, stud wall partition and false Ceiling etc.
•Conducting meeting with various subcontractors, MEP Contractors for coordination and approval prior to concrete.
•Managing big project construction works, control of construction schedules, control of cost and project planning.
•Checking of design mix coordinates with contractor and clients for supervising of works estimate quantity, verify claims etc. and reminder for permission from local Govt. bodies at various stages of construction for procuring of N.O.C Certificate •Calculation of Barb ending Schedule at site,Estimating the Quantity of Steel before placing an order in Control manner
All Construction material estimation prior to procurement from local supplier.
ROTARY MEC ENGG PVT LTD.URAN NAVAGHAR NAVI MUMBAI JULY1996-DEC 1999 ENGINEER PACKAGE i nine tankpads of various diameter,timely completed 11tankpadspackage-02 including truck loading and unloading bay completed package-3 six tank pads, gantry train loading and unloading control building admin building,trusses with sheeting roof timely completed and two water tanks raw water and drinking water tanks indian oil tanking farm (terminal) at port uran, navghar.
FARMONSHORE FOR INDIAN OILTANKLING AND INDIAN OIL AT URAN AND MEHUL CHEMBUR
SCOPE OF WORKS
a.Inspection and monitoring establishment of rigs for DMC METHOD OF PILE FOUNDATION FROM ERECTING TO COMPLETING CONCRETE FOR M;40 GRADE Pile
b.Construction of Raft tankage pads including pile caps tie beams etc
c.Monitoring rock pattern and observing rocks and terminating for concrete at hard rock level
d.•Involve in Supervision of Pile foundation for various Diameter Raft Pad
e..Terminal at URAN NAVGHAR 16 Numbers and 02 numbers watertank
Overseas execution of loading and unloading bay.
f.•Checking of Columns pedeatal Anchor Bolts Installation and Gantry 1.5kms Erection
g.•Supervising of Control Building administration Building Substructure and superstructure
h.•Involve in Construction of Oil water separator Tank
i.•Laying pf Precast pipe sleepers for various Diameter GI & Steel pipe, For HSD,.PETROL, Neptha, Blackoil
j.•Coordinating for approval of drawings with Architect, RCC Consultant and local authorities all civil works. Checking drawing and getting approval from local authorities pouring of concrete.
k.•Monitoring all building construction material quality control and recordingChecking drawing and getting approval from local authorities
l.rendering, gypsum neerru plastering,stucco plastering,, screeds for different types of flooring Internal & External finishes of structures like block work, Mmarble flooring, Tile flooring, wall tiling, stud wall partition and false Ceiling etc.
m.•Conducting meeting with various subcontractors, MEP Contractors for coordination and approval prior to concrete.
n.•Managing big project construction works, control of construction schedules, control of cost and project planning.
o.•Checking of design mix .coordinates with sub- contractor, clients and consultants structural and architectural .supervising of works estimate quantity, verify claims
p.•Marking point on to site from drawing by coordinating with Surveyors consultants and clients.
q.•Supervising each stage of construction from excavation,substructure and superstructure for oil furnace flairs foundation with bolts embedded in it both precast and cast in situ and planting it on the site.
DATE 25/12/2013 SIGNATURE Prakash .K. Chhatpar