RESUME
M.SURESHKUMAR **************@*****.***
No.+91-709*******,
CAREER OBJECTIVE:
EXPERIENCE AND KNOWLEDGE IN POWER PLANT ERECTION, COMMISIONING AND O&M MANAGEMENT.
{NPTI &BOILER OPRATION ENGINEER CERTIFICATE HOLDER (BOE)} EXPERIENCE
Around 19 Years Experience in Power Plant Operation and maintenance CURRENT PROFILE
Currentlyworking as a Plant manager in Amaravathi associates pvt ltd. Working Period : April 2023 to Till now
Responsibilities : 18 MW Co-gen (operation & maintenance) Plant : 90 TonsWALCHAND NAGAR boiler, 18 MW Triveni Steam Turbine. Site : Chengalrayan co operative sugar ltd;periyasevalai,viluppuram district.
JOB RESPOSIBILITIES:
• Boiler and Turbine Desk operation.
• Plant startup and shut down.
• Control and Monitoring the Parameters of Boiler and Turbine.
• Synchronizing the Generator with Grid.
• RO plant operation & maintenance
• Daily checking the water parameters and fuel report.
• To report to plant Manager
• Running the plant efficiently and maintaining High PLF.
• Ensure the availability of fuel
• To monitoring water treatment plant
• Ensure the plant maintenance spares
• To maintain the optimum power generation
• Ensure Shut down maintenance plan
• Trouble shooting boiler, turbine, wtp ...
PREVIOUS EXPERIENCE:
ORRIL ENERGY PVT LTD:
WorkingPeriod : August2022 to March 2023
Responsibilities : Deputy Manager (ETP, WTP, BOIILER - O&M) Plant : 10 ton Thermax combipac FBC boiler & Thermax 10 ton CVL boiler. Site : Kaalesuwari oil refinery pvt ltd, palani, Dindigul,TamilNadu.india M/S.CETHAR ENERGY LTD
Working Period : JUNE 2021 to JAN 2022
Responsibilities : Plant Manager (operation & Maintenance) Plant : 18 MW, 90 TonsWALCHAND NAGAR boiler, 18 MW Triveni Steam Turbine. Site : Perambalur co-operative sugar factory,Eraiyur Perambalur, Tamil Nadu. India M/s. SHRIRAM POWER GEN PVT LTD
(Group of orient green power company ltd);
Working Period : April 2008 to April 2021
Responsibilities : DEPUTYMANAGER (O&M)
Plant : 7.5 MW 35 TonsISJEC Travelling grate wood Fire Boiler, 7.5 MW Steam Turbine Site : M/s. SHRIRAM POWER GEN PVT LTD, DINDIGUL, TAMILNADU M/s. SHRIRAM NON CONVENTIONAL ENERGY PVT LTD
(Group of orient green power company ltd);
Working Period : July 2007 – march 2008
Responsibilities : Engineer operation & maintenance Plant : 7.5 MW 35 TonsISJEC Travelling grate wood Fire Boiler, 7.5 MW Steam Turbine Site : M/s.SHRIRAM NON CONVENTIONAL ENERGY PVT LTD; PATTUKOTTAI,TAMILNADU
M/s. AURO BINDO AGRO ENERGY PVT LTD;
Working Period : July 2006 – Jun 2007
Responsibilities : SHIFT ENGINEER -OPERATION
Plant : 8MW, 35 TonsWALCHAND NAGAR Travelling grate wood Fire Boiler, 8MW Steam Turbine
Site : M/s. AURO BINDO AGRO ENERGY PVT LTD,KALAYARKOIL, TAMILNADU M/s..HIQ ASSOCIATES (O&M)
Working Period : Feb-2001 to Nov-2002
Responsibilities : SHIFT INCHARGE
Plant : 1*4 MW 30 TPH WHRB Boiler and 4 MW Steam Turbine. Site : NAVADURGA FUELS RAIGARH, CHATTISGARH
M/s..POWER LINKAR CONTRACT (under ALTSOM power project) Working Period : June-1999 to Jan-2001
Responsibilities : Engineer- operation -Trainee
Plant : 4*2 MW HYDRO POWER PLANT (MAHANADHI DAM PROJECT) Site : Chhattisgarh electricity board,damtari district, chattisgarh WORKING EXPERIENCE
Boiler:
• Experience in operation & maintenance of WHRB, water tube, single drum-boiler capacity of 1*35 TPH, Boiler working Pressure 60 Kg/sq.cm, Temperature 465 deg.C.
• Bi drum, Water tube, Multi Fuel Stoker fired boiler of 1*35TPH, 65 kg/sqcm, 495deg.C.
• AFBC boiler of 45 TPH,43 KG/ Sqcm, 420 degC.
• Experience in operation & maintenance of Tangential corner firing, high pressure with intermediate re-heat, wind box,SCAPH,RAPH,DOUBLE FLOW economiser,Bi- Drum Natural circulation, coal/pet coke fired boiler capacity of 1750TPH, Boiler working Pressure 180 Kg/sq.cm, Temperature 545 deg.C.
• Experience in Waste Heat recovery Boiler (WHRB)
ON JOB TRAINING: ( MAKE : BHELL -Hardwar)
• Responsibilities, System Description, Organization, Working Parties, Test Teams, Documentation, Safety, Plant Certification, Plant Completion Report
• Boiler and Auxiliaries: Commissioning Activities, Preparation – Planning Various Activities, Typical Commissioning Schedule
• Hydraulic Test and Wet Preservation: Water Filling, Drainable Parts, Hydrostatic Testing, Wet Preservation
• Air and Gas Tightness Test: Procedure for the test, Furnace Zone, Second Pass of Boiler, Electrostatic Precipitator, Forced Draft Fan Ducts, Primary Air Fan Ducts, protocol on smoke generator test of the boiler
• Trial Run of Equipment: Fan, Air Heaters, Mills
• Commissioning of Electrostatic Precipitator: Pre-commissioning Checks – Mechanical, Pre- Commissioning Checks – Electrical, Before the First Light of the Boiler, Gas Distribution Test
• Fuel Oil System: Flushing of H.S.D Lines with Oil, Tests, constructional Tests, Pre-commissioning Tests, Commissioning Tests
• Preparation for First Light Up: System, Checking of Ignitor System, Check on Oil Characteristics, Check on Equipment in Oil/Air Lines, Pre-Check Before Light-up, Testing Furnace Probe, First Light Up of The Boiler, Expansion Movement of Boiler
• Alkali Boil – Out: Chemical Cleaning of Boiler, Water Washing, Alkali Boil Out, Rinsing, Commissioning Protocol for Alkali Boil Out
• Acid Cleaning & Passivation: Process, Acid Cleaning, Rinsing After Acid Cleaning, Citric Acid Rinsing, D.M. Water Rinsing, Neutralization, Passivation, Pumps, Tanks, and Miscellaneous Items, Specifications of Chemicals, Commissioning Protocol for Each Cleaning
• Thermal Flow Test of Economizer, Water Walls and Superheater: Instrument, Principle of Operation, Procedure For Water Walls and Economizer, Procedure For Superheaters, Commissioning Protocol for Thermal Flow Test
• Commissioning of Valves: Check List of Valves, Motorized Valves, Pneumatic-Operated Valves, Control Valves, Safety Valves
• Steam Blowing: Basic Technique Used, Scheme, Reheat Safety Valve Setting, Precautions
• Safety Valve Setting: Constructional Test, Pre-Commissioning Tests, Commissioning, Protocol on Safety Valve Setting
• Commissioning of Soot Blowers: Readings for Operation with Steam (Mechanical), Check Up of Electrical System, Commissioning of Blowers without Steam TURBINE: ON JOB TRAINING
• Experience in commissioning, operation & maintenance of subcritical with high pressure, Single Reheat, Double casing Double flow condensingTurbine of 1*500 MW [BHELL].
• Experience in commissioning, operation & maintenance of Bleed Cum Condensing Turbine of 1*7.5 MW
[Triveni Eng Ltd bangalore ].
ON JOB TRAINING COMMISSIONING EXPERIENCE ( MAKE : BHELL -Hardwar)
• Turbine and Auxiliaries, Acid Cleaning of Oil Pipelines, Lubrication and Governing System, Jacking Oil System, Governing System, Regenerative System, Boiler Feed Pump Commissioning, Barring Gear, Vacuum Tightness Test, Check List of First Rolling of Turbine
• Turbines and Auxiliaries
• Acid Cleaning of Oil Pipelines: Passivation and Drying, Final Erection in Position, Safety
• Lubrication and Governing System: Preparation for Oil Filling in Man oil tank, Charging of Oil Systems, Oil Flushing Circuit of a Turbine Lube Oil System, Oil Flushing, Hydraulic Testing of Oil System, Additional Checks to be Made on Turbine Oil System
• Jacking Oil System: Oil Flushing, Relief Valve Setting, Preparation for Hydraulic Testing, Hydraulic Testing
• Governing System: Checking of Governing System
• Regenerative System: Preparations, Procedure, Shell Sides and Drain Lines of Heaters, Safety and Precaution, HP/LP Heaters
• Boiler Feed Pump Commissioning: Constructional Tests, Pre-Commissioning, Commissioning Tests
• Barring Gear: Preparation, Trial Run of Motor, Preparation for Putting The Barring Gear in Operation
• Vacuum Tightness Test: Preparation of the System Before Filling with DM Water, Vacuum Tightness Test By Filling Up with DM Water, Raising the Vacuum in Condenser
• Check List for First Rolling of Turbine,Preparation, Preliminary Operation Before Rolling, Operation to Be Carried out For The Units with HP/IP Bypass System, Data to be Collected During Commissioning and Also After Loading to Full Capacity Turbine Generator Set Distribute Control System
• ABB DCS Model: AC800M.
• ABB 800XA
• SIEMENS PCS 7.
Utilities:
• Experience in operation & maintenance of Rotating equipments like pumps, fans etc.
• Experience in Switch yard,CT,PT,breakers,transformers,NGT panel,LASPT panel, Bus bar maintenance
• Experience in operation of Fuel and Ash handling systems.
• water treatment plant (RO).operation & maintenance ( Make: enviro pure india)
• Screw compressors [Atlas Copco].
• Experience in operation & maintenance of Surface Condenser & Air Cooled Condenser.
• Experience in operation & maintenance of Steam Jet Ejector.
• Knowledge in Operation of Cooling Tower, DM Plant and R.O Plant.
• Fire fighting system and emergency DG system Handling.
• Well known about 100 and above power plant malfunction & remedies
• Experience in Gasifiererection and commissioning ACADEMIC DETAILS
PERIOD : APRIL 1998
DEGREE : DIPLOMA IN ELECTRICAL AND ELECTRONICS
COLLEGE : VALIVALAM DESIKAR POLYTECHNIC,NAGAPATTINAM TECHNICAL DETAILS
PERIOD : DEC 2002- DEC 2003
DEGREE :POST DIPLOMA IN THERMAL POWER PLANT ENGINEERING COLLEGE : NATIONALPOWERTRAININGINSTITUTE,
NEYVELI (UNDER INDIAN MINISTRY OF POWER)
DIRECTORATE OF: BOILER OPERATIONAL ENGINEER CERTIFICATE BOILER, TAMILNADU(BOE) -2017
TRAINING CONDUCTED DETAILS
PERIOD : 15 DAYS /2003
PLACE : 210MW Power Plant Simulator Operation
Conducted by: Thermal Power Plant Training Institute, Western Region, Nagpur, India. COLLEGE : NATIONAL POWER TRAINING INSTITUTE,
FARIDABAD (UNDER INDIAN MINISTRY OF POWER)
PERSONAL DETAILS
NAME : SURESHKUMAR.M
FATHER’S NAME : P.MARIMUTHU
DATE OF BIRTH : 21.07.1977
SEX : MALE
NATIONALITY : INDIAN
LANGUAGES KNOWN : TAMIL, ENGLISH, TELUGU,HINDI
MARITAL STATUS : MARRIED
PASSPORT NO : L4671220
ADDRESS : 19/A4, MARUTHUVAR STREET, PATTUKOTTAI,THANJAVUR DISTRICT, TAMILNADU, INDIA
DECLARATION
I hereby declare that all the facts mentioned above are true to the best of my knowledge and belief. M.SURESHKUMAR