AYACHI Mohamed

Advanced Technician – Designer

**** – Tunisian

*********@*******.**

TEL : +216-********

AREAS OF EXPERTISE

Senior designer, team management.

with 25 years of experience in civil and hydraulic engineering studies. Competent and experienced in 2D, 3D and BIM software (REVIT, Tekla, Autocad, ARMACAD, ADFER) Reinforced concrete designer.

FIELDS OF ACTIVITY

Nuclear and industrial facilities

Complex buildings

Transport infrastructure

Tunnels and underground structures

Hydraulic studies for roads and flood protection PROFESSIONAL EXPERIENCE

From

2007 to

present

Design office SETECMTP / BMCI (Subsidiary of SETEC FRANCE) Participation in the design studies of various projects as a draughtsman and senior designer.

CIVIL ENGINEERING STRUCTURE

2022

BUILDING of an interchange between the RD57 and the A86 at VELIZY VILLA COUBLAY emergency exit - section 3: Civil engineering structure

BUILDING of a 48 km long road linking TIZI-OUZOU to the EAST-WEST motorway at DJEBAHIA.

BUILDING of bridges and overpasses in SENEGAL.

Multinational road rehabilitation project RUMONGE LOT1: Rehabilitation, development and asphalting of the related section: GITAZA (PK25) - RUMONGE

(PK70): 45 KM and development of the multinational road: TANZANIA / BURUNDI: NYAKANAZI - KASULU - MANYOVU / MUGINA -GITAZA (45 KM) AND KABINGO - KASULU - MANYOVU (260 KM)

2021

DUPLICATION works of the DE DABOU road (WEST EXIT) IN ABIDJAN: LOT1.

BUILDING of 15 steel structures in the REPUBLIC OF CÔTE D'IVOIRE.

BUILDING of the French Embassy in LIBREVILLE - GABON: Water and fire reserve.

2018

REALIZATION of several engineering structures for underpasses and outside passages (WESTERN BYPASS OF STRASBOURG).

2013-2014

NÎMES-MONTPELLIER BYPASS HIGH-SPEED RAILWAY LINE "CNM". In charge of the team who detailed design studies of 2 lots of railway bridges within the framework of the project of the new high speed railway line " Circumvention of Nîmes- Montpellier" (80km of new railway line including 188 bridges). SETEC MTP's mission, carried out on behalf of the OC'VIA CONSTRUCTION consortium, includes the detailed design of 22 portal bridges and 5 reinforced concrete viaducts of the 4-girder type.

2012-2013

BRETAGNE-PAYS DE LOIRE HIGH SPEED LINE " BPL

SETEC MTP is in charge of the detailed design team for 15 railway bridges for the Bretagne-Pays de Loire high speed line project - 180 km of new high-speed line built between Rennes (Ille-et-Vilaine department) and CONNERRE (Sarthe department). SETEC MTP's mission, carried out on behalf of the construction consortium led by EIFFAGE, includes the detailed design of 15 reinforced concrete portal bridges.

2012

RIVIERA-MARCORY MOTORWAY LINK - ABIDJAN IVORY COAST In charge of the design team for the detailed design of various standard bridges in the framework of the Riviera-Marcory motorway link project in Abidjan - Ivory Coast. SETEC MTP's mission for the construction company Bouygues TP included the detailed design calculations and drawings for a road bridge made of reinforced concrete slabs and three composite steel-concrete pedestrian bridges.

NUCLEAR BUILDINGS

2022 to present

EPR NUCLEAR POWER PLANT - HINKLEY POINT C – UK

Senior designer on behalf of SICOS-1229 CONSORTIUM site monitoring at the new HL building of the nuclear island of the EPR nuclear power plant under construction at Hinkley Point C. Modifications of the models according to the instructions of the master builder BYLOR AND EDVANCE in 3D using TEKLA software.

2017 to present

EPR NUCLEAR POWER PLANT - HINKLEY POINT C – UK

Realization on behalf of EDF of reinforcement drawings of the entire APC (Airplane crash shell) of the buildings of the nuclear island of the EPR nuclear power plant under construction at Hinkley Point C in the south of England. The drawings are made entirely in 3D using TEKLA software.

2015-2017

ITER NUCLEAR POWER PLANT - TOKAMAK BUILDING

Assistance to the construction consortium led by VINCI for the detailed design studies of the TOKAMAK building of the ITER (International Thermonuclear Experimental Reactor) project under construction in CADARACHE in southern France. The mission of SETEC MTP includes the realization of part of the detailed design drawings for the reinforcement of the building.

2013

ITER – TOKAMAK UPPER BASEMENT

Completion of reinforcement drawings for the upper basement of the TOKAMAK building on behalf of VINCI Construction France. SETEC MTP carried out more than 150 reinforcement and grounding drawings as part of this mission.

2007-2014

EPR FLAMANVILLE - FRANCE

Elaboration of the implementation drawings for the discharge structure as part of BMCI's participation in the execution studies of the Flamanville3 EPR nuclear power plant on behalf of the FLAMANVILLE studies consortium comprising the manufacturer Bouygues and SETEC TPI. BMCI's mission involves the production of more than 1,500 execution drawings for various buildings of the plant, mainly the electrical and backup buildings, the pumping station, and the discharge structure.

TUNNELS

2013-2015

ROMAN MILESTONE TUNNEL - SECTION OF THE A8 NICE-MONACO MOTORWAY DETAILED. Design studies of the tunnel and associated structures on behalf of the construction consortium led by VINCI. The project is an 800m long motorway tunnel - 3 unidirectional lanes - built on the A8 motorway between Nice and Monaco (section "Nice Est - La Turbide"). SETEC MTP's mission includes the calculations of the tunnel linings, the work of the tunnel heads, the emergency gallery, and the realization of the detailed design drawings of the project.

2013-2014

TUNNEL OF SAINT BÉAT - HAUTE GARONNE - FRANCE

Senior designer responsible for the detailed design study team of the tunnel and associated structures on behalf of the construction consortium led by SOLETANCHE BACHY. The project is a bidirectional 2-lane road tunnel - length 1020m built as part of the St Beat/Arlos bypass road project in the Haute-Garonne South-West department of France. SETEC MTP's mission includes the calculations of tunnel linings, tunnel head structures, emergency galleries, ventilation slab under normal and fire conditions and the execution of detailed project design drawings.

HYDRAULICS STRUCTURE

2020-2021

STUDY OF EXECUTION OF A WATER TOWER IN TOGO

Senior designer responsible for the team in charge of the realization of the formwork and reinforcement execution drawings.

2019

UGANDA STATION: KAMPALA WATER-LAKE VICTORIA WATSAN (KW-LVWATSAN) PROJECT. Package 4B KATOSI drinking water treatment plant and pumping pipe and NSUMBA reservoir CONTRACT No. NWSC-HQRS/WRKS/16-17/162209.

2010

GRÉSILLONS II WASTEWATER TREATMENT PLANT - FRANCE Senior designer responsible for the team in charge of the realization of detailed design drawings for the construction of biofiltration zones (Biostyr) C21, C22, C23, C24, 25 and C26 as part of the Grésillons II wastewater treatment plant project on behalf of Bouygues Construction (Contractor). SETEC MTP's mission consisted in the production of approximately 150 reinforcement drawings.

BUILDINGS & STRUCTURES

2011-2013

THE TERRACES OF THE PORT – LEISURE SHOPPING CENTER - MARSEILLE Elaboration of drawings for participation in the detailed design of the infrastructure of the building, built in MARSEILLE. BMCI's mission focused on the completion of the reinforcement drawings for the floors and beams, a study carried out on behalf of VINCI Construction France.

2012

Stade Vélodrome Marseille- FRANCE

Detailed design of the Ganay stands as part of the stadium restructuring project. The study carried out on behalf of Bouygues Travaux Publics included the modelling and justification of the structure and the execution of formwork and reinforcement drawings.

2011

ODEON MONACO TOWER

Responsible for the team in charge of drawing up plans for participation in the detailed design of the infrastructure of the ODEON Tower, a 170m high tower with floors, built in MONACO. SETEC MTP's mission focused on the realization of the reinforcement plans of the floor of the tower slab. Study carried out on behalf of VINCI Construction France. From

1997 to

2007

Design office "EGS - Tunisia"

Participation in the design studies of various projects as a Chief Draughtsman. MAJOR REFERENCES

PROJECT (SHORT

NAME)

YEAR CLIENT Purpose of project & MISSION

HPC - SICOS 1229

From 2022

to present

EDVANCE

Technical answers and adaptation of the model to the needs of the site.

Senior designer on HL buildings.

HPC - ICOS 1221 2017- 2022 EDVANCE

Extraction of 2D plans from models and control of drawings before issuance.

Senior designer on all HR/HL/HK buildings.

ITER Nuclear Power

Plant - TOKAMAK

Building

2015- 2017

VINCI

CONSTRUCTION

Realization of detailed reinforcement drawings for the reinforcement of the building.

Senior designer

ITER – TOKAMAK

Upper Base

2013

VINCI

CONSTRUCTION

Realization of reinforcement drawings for the upper basement of the TOKAMAK building and grounding

drawings. Senior designer

EPR Flamanville -

France

2007- 2014

BOUYGUES &

SETEC TPI

Realization of the execution drawings of various buildings of the plant, mainly the electrical and backup buildings, the pumping station, and the discharge structure.

Senior designer

High-speed railway

line Nîmes-

Montpellier bypass

" CNM "

2013- 2014

OC'VIA

CONSTRUCTION

Detailed design of 22 gantry bridges and 5 reinforced concrete viaducts of type 4 beams. Realization of detailed formwork and reinforcement drawings.

Senior designer

PROJECT (SHORT

NAME)

YEAR CLIENT Purpose of project & MISSION

Tunnel of Saint Béat

- Haute Garonne -

FRANCE

2013- 2014

SOLETANCHE

BACHY

Calculations of tunnel linings, tunnel head structures, emergency galleries, ventilation slab under normal and fire conditions and execution of detailed design drawings for the project. Senior designer

Borne Romaine

Tunnel - Section of

the A8 motorway.

Nice-Monaco

2013- 2015

VINCI

CONSTRUCTION

Calculations of tunnel linings, tunnel head works, emergency gallery and realization of detailed design drawings of the project.

Senior designer

Brittany-Pays de

Loire high-speed

line " BPL

2012- 2013 EIFFAGE

Detailed design of 15 reinforced concrete portal bridges. Creation of detailed formwork and reinforcement drawings. Senior designer

link Riviera-Marcory

- Abidjan Ivory

Coast

2012 BOUYGUES TP

Calculations and detailed design of a reinforced concrete slab road bridge and three composite steel-concrete footbridges. Senior designer

Velodrome Stadium

Marseille- FRANCE

2012 BOUYGUES TP

Modelling and justification of the structure and execution of formwork and reinforcement drawings.

Senior designer

Grésillons II

wastewater

treatment plant -

France

2010

BOUYGUES

CONSTRUCTION

Detailed design drawings for the construction of the biofiltration zones (BIOSTYR) C21, C22, C23, C24, 25 and C26.

Senior designer

Study of flood water

spreading

structures in the

governorate of

Tataouine

2002-2004

CRDA

TATAOUINE

Study of 25 groundwater recharge works and 4 flood water spreading works in the governorate of TATAOUINE.

Chief Draughtsman

Preliminary study of

the implementation

of 3 wastewater

treatment plants in

Libya

2006 THE LYBIE

Preliminary design of 3 wastewater treatment plants in Libya. Provide detailed drawings and layouts of the existing and projected networks in addition to drawings of the auxiliary buildings of the plants.

Chief Draughtsman

-African artificial

river Oubangui-

Chari-Libya

2004-2005 THE LYBIE

Preliminary study of the trans-African artificial river Ubangi- Chari-Libya

Chief Draughtsman

Flood protection

study of the city of

Ariana

1999-2001 DHU

Study of protection against floods in the city of Ariana, realization of the projected works in the layout of the city with the proposed arrangements on the plan views.

Draughtsman

Study for the

dewatering of the

Tunis/Algiers

railway line

1999-2000 SNCFT

Study of dewatering of the railway line Tunis / Algiers 220 km, development of the planned route of hydraulic facilities for protection of the platform against flooding.

Draughtsman

Implementation

study of the

sewerage network

of the cities of

Mateur, Ras Jebel,

Raf Raf and El Alia

1998-2003 ONAS

Provide plans of the wastewater system and civil

engineering drawings of pumping and discharge stations including profiles along proposed pipes.

Draughtsman

Study of 6 hill dams

in the governorate

of Tataouine

1998-1999

Ministry of

Agriculture

(DG/ETH)

Study of 6 hill dams in the governorate of Tataouine. Elaboration of the drawings file including the civil engineering drawings of the dam including spillway, and wing walls. Draughtsman

TRAINING

2019 Tekla 3D Training Certificate (Reinforcement) 2017 Tekla 3D Training Certificate (Concrete)

2011 3D CAD Operator Certificate (Computer Aided Drafting) 1998 2D CAD Operator Diploma (Computer Aided Drafting) 1997 Diploma of computer input operator (Microsoft Office) 1992 Literary Baccalaureate

THE SOFTWARE USED

Windows and MAC OS operating systems in addition to Microsoft Office Software:

2D and 3D (Autocad / Adfer / Armacad / Revit / Tekla ).

Topography data processing (SDR map and Covadis).

Geographical information systems (Arc-view, Arc-info and Arc Gis).

Remote sensing and digital mapping image processing (Envi).

Raster (Photoshop, Corel Draw) and Vector (Illustrator) image processing.

Calculation and dimensioning of pipes and structures (Assaini, piste+, pla...) LANGUAGES