Alfredo Carlos Acevedo Albarracin
*****************@*****.***
http://linkedin.com/in/aacevedo73
Phone: 713-***-****
About
Petroleum Engineer with 9 years experience on offshore Workover, Intervention and Completion operations (Subsea and Surface stack wells) at Chevron, 13 years experience on design, installation and commissioning of Electric Submersible Pumps systems with different companies as Chevron, Baker Hughes, Schlumberger, WoodGroup ESP (GE Oil & Gas) and most recently Project Management with AccessESP.
Education
1992-1998 Universidad de America 1998 - Petroleum Engineering Degree
Experience from most recent.
Dates (Month/Year): 03/2022 – Present
Business Unit: Artificial Lift Technology
Job Title: Lead Engineer/ Project Engineer
Location: Houston, TX
Company: Baker Hughes (AccessESP)
Project Engineer
oLead all local Client relations and responsibilities from a technical and operational perspective.
oContribute to projects and manage technical interfaces with all vendor and contractors, AccessESP internal teams, equipment and material suppliers.
oEnsure all equipment is inventoried, tracked, assigned, and always stored ready for use.
oCoordinate and collaborate with the local clients on job scheduling and ensure the region team is focused on delivering results in time, all the time.
oProactively lead in the area of health, safety and environment on-site and at our facility, leading by example.
oManage all operational aspects at shore base and well-site.
oUnderstand, follow, implement, and reinforce use of a Management of Change process.
oReview and comment on budgeting, risk assessment and associated procedures produced internally by AccessESP and externally by contractors and vendors.
Dates (Month/Year): 05/2021 – 02/2022
Business Unit: Artificial Lift Services
Job Title: Field Service Engineer
Location: Houston, TX
Company: Baker Hughes
Field Service Engineer
oInstallation/Pulling of (Complex) Electric Submersible Pump systems and associated equipment offshore and onshore locations.
oMonitoring, troubleshoot and test downhole ESP equipment including downhole monitoring tools in order to maximize well productivity and ESP run life.
oLead Dual Y-Tool ESP completion installation on Big Foot platform (Gulf of Mexico) for Chevron. New York and Nevada wells.
oLead ESP installation on Trinidad and Tobago (Alpha and Bravo platforms for Perenco.
oLead ESP installation on Deadhorse, AK (Spy Island) for ENI.
oLead ESP installation on Deadhorse, AK (Milne Point) for Hilcorp Alaska.
oESP installation on Perdido platform (Gulf of Mexico) for Shell. Caisson A work.
Dates (Month/Year): 06/2016 – 12/2020
Business Unit: GOM Drilling & Completions
Job Title: Field Completion Specialist
Location: Houston, TX
Company: Chevron
Field Completion Specialist
oEnsured all equipment needed for Completion operations is on location and correct. Work with all personal on location to ensure they are aware and understand the completion operations.
oCommunicated with office team on operations and keep them up to date with completion progress/concerns during execution of Lower and upper completions for Jack and St Malo, Blind Faith, Tahiti, and Bigfoot.
oCollaborated with the Big Foot team on the procedure for the upcoming MRWO (Major Rig Workover) for Colorado well.
oLead Upper Completion installation (Dual Electric Submersible Pumps) for Big Foot during Nevada and Colorado wells. Participated on discussions to identify ESP equipment failure root cause in Nevada and possible root cause for Colorado.
oCollaborated with the Big Foot team for upper completion deployment on Texas well to provide Gulf of Mexico Business Unit (GOMBU) with a completed well with 2 electrically stable Electric Submersible Pumps (ESP), utilizing all captured lessons learned from previous deployments.
oProvided Artificial Lift equipment support for the BigFoot project, evaluated current equipment offering condition and supplied recommendations or suggestions to maximize equipment reliability and installation efficiency (Installation Time).
oCollaboration with the Big Foot team for future deployment of Wireline Retrievable Electric Submersible Pumps (ESP) as a solution to minimize well intervention cost and increase ESP equipment reliability and efficiency.
oArtificial Lift knowledge sharing and mentoring of team members to increase confidence and awareness level as trade of with their Completion design experience, increasing personal work scope capabilities.
Dates (Month/Year): 08/2013 – 04/2016
Business Unit: SASBU Drilling & Completions
Job Title: Well Intervention//Workover Engineer
Location: Cabinda, Angola
Company: Chevron
Well Intervention/ Workover Engineer
oPrepared detailed well work procedures (Slickline, e-line, offline well preparation, dry tree and Subsea scale squeezes using the Multiple Application Reinjection System (MARS)), cost estimates, Simultaneous Operations Plans, Risk Assessments and contingency plans for both rig based and non-rig based well interventions in Block 0 Offshore Angola.
oProvided daily direction to offshore Well Site Managers (WSM) to manage daily activity and generate forward plans.
oFacilitated and collaborated with the introduction of key cost reduction alternatives for workover operations within Southern Africa Strategic Business Unit (Wireline Deployed Electric Submersible Pumps and Hydraulic Workover Unit projects).
oLead installation of Electric Submersible pumps in Nigeria (Nigeria Mid Africa Business Unit) in well Meren 8Ei ESP-Reverse Y-Tool Water Dump Flood solution.
oElectro Submersible Equipment design review using Schlumberger’s ESP pump design software (Design Pro) and complete installation procedures review prior execution as well as recommendations for ESP equipment stand by (due to subsea equipment delays after installation).
oPrepared detailed MRWO (Major Rig Workover) procedures, cost estimates, risk assessments and contingency plans for the current queue of wells assigned to the Hydraulic Workover Project.
oFacilitated Risk Uncertainty Management Standard (RUMS) sessions, employ risk management, technology innovation, and document/collate/employ lessons learned and best practices.
Dates (Month/Year): 04/2011 – 07/2013
Business Unit: ETC
Job Title: Artificial Lift Hardware Specialist
Location: Houston, TX
Company: Chevron
Artificial Lift Hardware Specialist
oProvide Artificial Lift equipment support to the different business units and evaluate current artificial lift equipment selections; providing recommendations and suggestions to maximize performance, understand current issues and evaluate possible solutions.
oElectric Submersible Pump (ESP) equipment support to the BigFoot team (GOMBU).
oUtilization of Baker’s design software (Autograph) to review current provider designs and compare equipment capabilities/specifications with previous designs done by Schlumberger on their design software (Design Pro) for Big Foot (GOMBU).
oUtilization of Prosper for Artificial Lift design and optimization with Nodal Analysis (GOMBU).
oUtilization of Surface Network GAP for full field optimization (GOMBU).
oElectric Submersible Pump (ESP) equipment support to the LTAD team (SASBU).
oGas Lift equipment recommendation for BBLT (SASBU).
oGas Lift equipment recommendation for Lianzi (SASBU).
oCompletion Equipment recommendation for Malange team (SASBU).
oStrategic research project support for the Frac-pulse project (Bakersfield, CA)
oArtificial Lift knowledge sharing, mentoring and training of team members to increase confidence, awareness level and broaden personal work scope capabilities.
Experience previous Chevron
Dated (Month/Year): 04/2009 – 03/2011
Employer: WoodGroup ESP (GE Oil & Gas)
Location: Houston, TX
Sr. Application Engineer
oDesk Engineer for ExxonMobil Chad, Africa Project, Electric Submersible Pump (ESP) and Progressive Cavity Pump Design and Optimization, equipment forecast and materials Management. Mentoring and training for customer and internal colleagues
Dated (Month/Year): 12/2005 – 03/2009
Employer: Schlumberger
Location: Houston, TX
Application/Sales Engineer
oEquipment design, marketing and sales of Electric Submersible Pumps and Horizontal Pump Systems in US Land as well as installed systems monitoring and surveillance.
Dated (Month/Year): 06/2003 – 11/2004
Employer: Baker Hughes
Location: Bogota, Colombia
Alliance Coordinator (Base manager)
oCoordinator of entire delivery and installation of electric submersible pumps (ESP), Well Pump Design, Inventory Management, equipment testing, assembling, teardown and Failure Analysis for Occidental Petroleum (OXY) Colombia (Caño Limon Field). 22 Direct Reports.
Dated (Month/Year): 02/2001 – 05/2003
Employer: Baker Hughes
Location: Bogota, Colombia
Field Service Engineer
oElectric Submersible Pump Equipment Installation, pulling and on-site customer technical support for Occidental Petroleum (OXY) Colombia (Caño Limon Field).
Dated (Month/Year): 06/1998 – 12/1999
Employer: Alpha Consultores
Location: Bogota, Colombia
Support Engineer
oPart of the team in charge of performing Reserve Calculations, Production Analysis and Artificial Lift selection recommendation for several small to mid-size operating companies.