Post Job Free

Resume

Sign in

Painting and Insulation Inspector/ Supervisor

Location:
Barangay 177, 1424, Philippines
Posted:
May 11, 2023

Contact this candidate

Resume:

ERWIN SOLIMAN UMAHON

**** *** **. ************ ***********, Bagumbong,

Caloocan City (North), Philippines 1421

adw2bd@r.postjobfree.com

Skype ID: erwin.umahon08

+63-998******* (Philippines)

+65-84557349 (Singapore)

SENIOR QA/QC COATING INSPECTOR / ENGINEER / SUPERVISOR

CAREER OBJECTIVE

To begin an employment in a company where I can make use and leverage my specialized knowledge and technical skills in a challenging position that can be utilized and developed in order to benefit the company and assist my career development for the organization.

JOB SUMMARY

With fifteen (15) years of extensive and diverse working experience in the field of inspection in various engineering practices for maintenance and construction of oil and gas industry, petrochemical plants, refinery light industrial plant, heavy fabrication yard, and marine new building and maintenance. Offer expertise in Quality Control Inspection of Industrial Coating of Piping and Equipment, Concrete Coating, Visco-Elastic Coating or Tape Wrapping of UG Piping, Tank Coating, Passive Fire Protection, Insulation and Personnel Protection ensuring product conformity and good quality of workmanship in accordance with the Project Specifications, Codes and Standards. Adept at managing multiple projects while ensuring maximum client satisfaction with the highest level of service and quality.

QUALIFICATIONS

Six Sigma Yellow Belt

Lean Six Sigma

Managing Operational Risk and Resilience in a Dynamic Environment

Organizational Resilience

ASNT NDT UT Level 2 Certificate No. 2021-UT-052

ASNT NDT MT Level 2 Certificate No. 2021-MT-055

ASNT NDT RT Level 2 Certificate No. 2021-RT-049

ASNT NDT PT Level 2 Certificate No. 2021-PT-056

NACE Ethics for the Corrosion Professional e-Course

Diesel Engine Tune Up Certificate No. KuGq5TginV

Packaged Air Conditioner Unit Servicing Certificate No. YixAY6VReh

NACE Coating Inspector Level 2 - Certified Certificate No. 269056, ID No. 21528

Approved SAUDI ARAMCO Coating Inspector

Khurais AL Crude Increment Project (Transmittal No. KALCIP/CPF/TR-00264/16)

Jazan Refinery Project (Transmittal No. SK/RCL-T-I-0649)

Approved SAUDI ARAMCO Work Permit Receiver Certificate No. 156871

Certified Tape Wrapping Applicator (STOPAQ) Certificate No. 1003905

Certified Fireproofing Inspector (Chartek) Certificate No. IP-QCCA-021

Certified Fireproofing Plural Spray Applicator (Chartek) Certificate No. IPS-S1508

Offshore Onshore Oil and Gas HSE Training Certificate No. NCR MMLA 000 021

Bachelor of Science in Mechanical Engineering

WORK EXPERIENCES

SinoTCC (Singapore) Pte. Ltd., 18 Boon Lay Way, #10-103 Tradehub 21, Singapore 609966

Painting and Insulation Inspector/Supervisor

Dates of Employment: September 29, 2021 to January 20, 2023

* Planned and executed daily inspections and approval of all painting and insulation activities with strict adherence to the specifications of applicable coating and insulation system to attain desired quality performance thru quality preparation and application.

* Coordinate between the Owner’s Representatives/Client and Construction teams to ensure our end product meets a reliably high level of quality with maximum satisfaction.

* Helped to ensure quality improvement by work in a systematic manner, formalized procedure design to incorporate contract requirements and design change.

* Performed all documentations, inspection reports and recommend corrective disposition on non-conformance report.

* Conducted seminars and trainings for further development of construction 100+ personnel and workers.

Client: Neste Singapore (October 2021 to January 20, 2023)

Project: Neste Refinery Singapore Expansion 2022

Description: Structural and Piping Construction and Assembly (Greenfield)

National Contracting Co. Ltd. – Construction Division (Rezayat Co. Ltd.), Al-Khobar, Kingdom of Saudi Arabia

Senior Inspector – Painting/Coating (ARAMCO Approved)

Dates of Employment: August 22, 2016 to August 30, 2019

* Planned and executed daily inspections and approval of all blasting and painting activities on Protective Coating with strict adherence to the specifications of applicable coating system to attain desired quality performance thru quality coating preparation and application.

* Coordinate between the Owner’s Representatives/Client and Construction teams to ensure our end product meets a reliably high level of quality with maximum satisfaction.

* Helped to ensure quality improvement by work in a systematic manner, formalized procedure design to incorporate contract requirements and design change.

* Performed test on coating as required i.e. holiday test, adhesion test, cross-cut test, etc.

* Performed all documentations, inspection reports and recommend corrective disposition on non-conformance report.

* Conducted seminars and trainings for further development of construction 30+ personnel and workers.

Client: Saudi Aramco – Saipem (Mar. 2017 to August 30, 2019)

Project: Khurais Central Processing Facilities Expansion Project GOSP

Description: Structural and Piping Construction and Assembly (Greenfield and Brownfield)

Client: Saudi Aramco – SK E&C (Sept. 2016 to Mar. 2017)

Project: Jazan Refinery and Terminal Project EPC-9

Description: Electrical and Instrument Construction and Assembly

Atlantic, Gulf and Pacific Company of Manila, Inc. (AG&P), Yard 1 San Roque, Bauan, Batangas, Philippines

QC Coating, Fire Proofing and Insulation Inspector

Dates of Employment: March 23, 2015 to December 16, 2015

* Planned and executed inspection for Painting, Fireproofing and Insulation Materials i.e. paints, thinner and blasting abrasives that they are suitable for the job.

* Helped to ensure all Blasting, Painting, Fireproofing & Insulation Activities are carried out in a safely manner.

* Maintained quality improvement by work in a systematic manner, formalized procedure design to incorporate contract requirements and design change to ensure the procedure for construction, inspection and test plan are implemented in line with the project specifications.

* Planned and executed daily inspections and approval of all blasting and painting activities on Protective Coating and Insulation with strict adherence to the specifications of applicable coating system to attain desired quality performance thru quality coating preparation and application including all documentations, inspection reports and recommend corrective disposition on non-conformance report are carried out.

* Performed test on coating as required i.e. holiday test, adhesion test, cross-cut test, etc.

Client: JSC Yamal LNG

Project: Yamal LNG Project Modular Work Package 2A (MWP2A)

Description: Modular Construction, Structural Fabrication & Assembly of Yamal LNG Project (Painting, Passive Fire Protection and Insulation)

Hempel Paints (Bahrain) S. P. C. (M.E. West Regional Office), Mina Salman, Kingdom of Bahrain

Technical Service Representative (Coating Advisor – Owner/Client Representative)

Dates of Employment: October 4, 2009 to November 2014

* Planned and carried out the daily inspections and approval of all blasting and painting activities on Marine Coating and Protective Coating (Industrial including Oil and Gas) which includes ballast tanks, cargo tanks, cargo holds, engine room, any void spaces, superstructure, main deck and external hull in Arabian Shipbuilding & Repair Yard (ASRY) and Bahrain Ship Repairing and Engineering Co. (BASREC) in a secure manner.

* Converged and aligned with Owner’s Representatives/Client on surface preparation and coating systems required to their maximum satisfaction to ensure strict adherence to the specifications of applicable coating system to attain desired quality performance thru quality coating preparation and application.

* Conducted inspection of all areas both internal and external of the marine vessels including Oil and Gas industry with Destructive and Non-Destructive Tests such as X-Cut, Cross Hatch, Pull-Off Test, DFT measurements, Holiday detection test, MEK test, etc. and to ensure accurate recording of all relevant data, prepare ERT reports or Coating Advisor Report Tool (CART) and certificates for the finished project.

Client: Tatweer Petroleum

Project: Mud Tank Maintenance

Description: Internal painting of Mud Tanks at production site

Client: Ministry of Electric and Water Authority

Project: Water Tanks (Riffa, Abu Jarjur, Hamad Town and Hidd)

Description: Painting of Water Tanks (Internal and External)

Client: V-Ship (Boston) USA LLC

Project: M/V Eastern Power (Bulk Carrier)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom), Cargo Holds and Crane Boom

Client: National Petroleum Construction Company (NPCC)

Project: PLB-648 (Heavy Lift Ship)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom), Decks and Tanks

Client: Kuwait Oil Tanker Company (KOTC)

Project: M/V Al Salam II (Cargo Tank Carrier), M/T Gas Al Mutlaa (LPG Carrier), M/T Gas Al Gurain (LPG Carrier) and Nakilat VI (Supply Boat)

Description: Painting of Cargo Tanks (Phenolic Coatings), Water Ballast Tanks (Double Bottom), Fore Peak Tank and Foreward Deep Water Tank and Hull (Topside, Vertical side and Flat Bottom) with Silicone application on Propeller and Rudder.

Client: SAIPEM S.P.A.

Project: S47, S46 & S43 (Barge)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom), Main deck and Survey of tanks

Client: ODFJELL

Project: M/V Bow Hector and M/V Bow Riyad (Chemical Tanker)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom), Water Ballast Tanks (Double Bottom), Fore Peak Tank and Foreward Deep Water Tank

Client: Nass Marine

Project: Ocean Diving 8 (Barge) – New Building

Description: Painting of Hull (Topside, Vertical side and Flat Bottom), Main deck and Void Tanks

Client: BW Fleet Management AS

Project: M/V Berge Summit (Crude Tanker)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom)

Client: MAERSK Line Ltd.

Project: M/V California (Container Carrier)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom)

Client: Kuwait Livestock Transport & Trading Co. K.S.C. (KLTT)

Project: M/V Al Messilah (Livestock Carrier)

Description: Painting of Sheep House and Hull (Topside, Vertical side and Flat Bottom)

Client: Seachange Maritime Pte. Ltd.

Project: M/V Madura (Cargo Carrier)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom), Cargo Decks and Hatch Cover

Client: Great Lakes Dredge & Dock Co.

Project: GL-143 (Barge), Sugar Island (Hopper), GL-10 (Barge), Buster (Booster) and Carolina (Dredger)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom), Void Tanks, etc.

Client: Hallworthy LLC

Project: Foresight Driller 5 (Rig)

Description: Painting of Hull (Topside, Vertical Side Shell and Flat Bottom), Leg Wells and Helicopter Landing Pad (Underneath Area)

Client: Van Oord DMC B.V.

Project: Sliedrecht 35 (Dredger)

Description: Painting of Dry Tanks, Fresh Water Tanks and Hull (Topside, Vertical side and Flat Bottom)

Client: Arab Maritime Petroleum Transport Company

Project: M/T Shaybah (Crude Carrier)

Description: Painting of Ballast Tanks, and Hull (Topside, Vertical side and Flat Bottom)

Client: Saudi Aramco

Project: Arabiyah 6 (Rig) and Arabiyah 7 (Rig)

Description: Painting of Hull (Topside, Vertical Side Shell and Flat Bottom) Superstructure, Accommodation Deck, Main Deck, Steering Compartment, Ballast Tanks, Fresh Water Tanks, Void Tanks, and Crane.

Client: Svitzer Bahrain S.P.C.

Project: Svitzer Pella (Tug Boat)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom)

Client: FAL Shipping Co. Ltd.

Project: M/T Zaabeel

Description: Painting of Hull (Topside, Vertical side and Flat Bottom)

Client: Huta Hegerfeld AG

Project: Huta 2 & Huta 4 (Dredger)

Description: Painting of Main Deck, Cutter Ladder and Hull (Topside, Vertical side and Flat Bottom)

Client: Acta Marine

Project: CC Biscay (Barge)

Description: Painting of Ballast Tanks, Main Deck and Hull (Topside, Vertical side and Flat Bottom)

Client: Sea Breeze Shipping Ltd.

Project: Abdullatif.S (General Cargo)

Description: Painting of Hull (Vertical side and Flat Bottom)

Client: ENSCO

Project: Ensco 96 (Rig) & Ensco 76 (Rig)

Description: Painting of Hull (Topside, Vertical Side Shell and Flat Bottom) Superstructure, Ballast Tanks, Fresh Water Tanks, Void Tanks, and Helideck

Assisted:

Client: ODFJELL

Project: M/V Bow Mekka and M/V Bow Riyad (Chemical Tanker)

Description: Painting of Water Ballast Tanks, Trunks, Double Skin Ballast Tanks, Double Bottom Ballast Tank, Hull and Exhaust Pipes.

Client: Ahrenkiel Shipmanagement GmbH & Co. KG

Project: M/V Lombardia (Chemical Tanker)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom)

Client: Kuwait Livestock (KLTT)

Project: M/V Al Kuwait (Livestock Carrier)

Description: Painting of Water Ballast Tanks and Hull (Topside, Vertical side and Flat Bottom)

Client: Wallem GmbH & Co. KG

Project: M/V Vogesailor (Cargo Holds)

Description: Painting of Hull (Topside, Vertical Side and Flat Bottom), Hatch Cover and Cargo Holds.

Client: Kuwait Oil Tanker Company (KOTC)

Project: M/V Al Salheia (Very Large Crude Carrier) and M/V Al Sabiyah (Cargo Tank Carrier)

Description: Painting of Water Ballast Tanks, Fresh Water Tank, Hull (Topside, Vertical side and Flat Bottom) and Cargo Tanks (Phenolic Coatings)

Client: Great Lakes Dredge & Dock Co.

Project: Ohio (Dredger)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom), Ladder and Ladder Hoist

Foundation, A-Frame, Deck Trunnions, Cutter Motor Enclosure (External & Internal), Spud Carriage, Spud Carriage House (External & Internal), Void Tanks, etc.

Client: Ministry of Defense, UK

Project: RFA Lyme Bay

Description: Painting of Hull (Topside, Vertical side and Flat Bottom), Main Deck, Aft Ramp, etc.

Client: MAERSK

Project: M/V Ohio, M/V Kentuky, and M/V Wisconsin (Container Carrier)

Description: Painting of Hull (Topside, Vertical side and Flat Bottom)

Abu Dhabi Oilfield Services (ADOS), Industrial Area, Mussafah, Abu Dhabi, UAE

Assistant QC Engineer

Dates of Employment: June 20, 2007 to December 31, 2008

* Helped and maintained all inspection stages to ensure it was carried out in line with approved inspection plans and/or procedures, records for inspection and test status, final inspections and tests/work in progress plus the consistency of procedures application.

* Coordinated and liaised with clients’ QC representatives on matters related to inspection and has the full responsibility in documentation, inspection, and coordination for clients and third party inspectors.

* Conducted visual and dimensional inspection of tanks, piping, vessels and tube bundles, witnessed Hydrostatic test of the tanks, piping, vessels and tube bundles with visual inspection of the welded areas especially on pressure parts, and conducted painting inspection such as surface preparation and paint/coating application on the product as per project requirements.

* Worked hand in hand with a team of QC inspectors and engineers for the implementation of quality procedures and standards of project quality requirements as defined in the project specifications and applicable codes and standards plus abided by safety guidelines at sites.

* Reviewed all final documents, manufacturer data reports are filed progressively and in timely manner to ensure our end product are met prior to submission to client/customers.

Client: Daniel-Emerson

Project: Fiscal Gas Metering Skid – ESI Project and Rabigh Utilities & Offsites Umbrella Project (UOU)

Description: Piping and Skids

Client: JGC / Qatar Shell

Project: Pearl GTL Project

Description: ASME Vessels and Water Seal Pot

Client: CCC / GASCO

Project: Offshore Associated Gas (OAG) Package – 3 Project

Description: ASME Vessels and Tanks

Client: NPCC / Technip

Project: For QATARGAS II – Development Project Offshore Facilities

Description: Batch Transport Package (Tanks, Piping and Skid)

Client: Technip / Total E & P Yemen

Project: Project 240 Gas Compression Project CFT 14

Description: ASME Vessels

Velosi Certification L.L.C., 2nd Floor Eli France Building, Ramada Junction, Doha, Qatar

Inspection Coordinator

Dates of Employment: January 16, 2007 to May 4, 2007

* Coordinated with the clients, inspectors and other coordinators for the inspection to ensure all the inspection allocated are met with a reliably high level of quality with maximum satisfaction as per required project specification, codes, and standards.

* Maintained all the documentation such as Inspection Reports, Release Notes, Quotations and other documents.

* Reviewed all document reports like material test certificates, certificates of conformity, etc. and clarify queries as per client’s requirements.

Clients: Qatar Petroleum, McDermott, Technip, and Others.

MD Juan Enterprises, Inc., #2 Susano Road, Deparo, Caloocan City, Philippines

Quality Control Inspector

Dates of Employment: June 14, 2005 to December 18, 2006

* Met and coordinated with Contractors to oversee the production and inspection of all incoming materials, Stamping, Metal Assembly, and Painting section for our local and export end products such as vehicle bodies and accessories to ensure a constantly high level of quality with maximum satisfaction.

* Organized and ensured compliance with existing company codes, policies, rules and regulations on safety program, increases monthly safety by 4%.

* Witnessed hydro static test for the break lines of the car spare parts at Metals Industry Research and Development Center (MIRDC), Tensile/Tension Stress Cracking for chains, Brinell Hardness Test for handbrakes, Deflection and Compression test for Spring for production.

* Conducted regular inspections on facilities, work areas, tools, equipments, products, and materials of the company, observes work methods and procedures of workers to determine unsafe working condition. Evaluates and review Non-conformance products and documenting all products and reports.

Dragon Asia Rolling Mill Inc., Sitio Malinis St. Bagbaguin, Valenzuela City, Philippines

Production Checker and Quality Control

Dates of Employment: July 12, 2004 to April 20, 2005

* Organized and receives production schedule and activities of the staff relative to the completion of outputs and commitment dates adherent to the quality and quantity standards, increases productivity by 25% quarterly.

* Worked hand in hand with production team and engineers for the implementation of quality procedures and standards required as defined in the specifications and applicable standards plus abided by safety guidelines at sites.

* Planned and implemented skills upgrading program, conducted performance appraisal of all the staffs under supervision on a specified period.

* Conducted regular inspections on work areas, tools, equipments, products, and materials of the company, observes work methods and procedures of workers to determine unsafe working condition. Evaluates and review Non-conformance products and documenting all products and reports.

* Conducted hourly product quality checking such as weight, dimension and other quality attributes to meet the set quality standards, prepared product samples for sales use, assisted the staff in their work to expedite the prompt completion of such work, and ensure proper housekeeping is being followed in the work place.

* Reviewed all document reports are filed progressively and in timely manner to ensure our end product are met.

United Containers Corporation, 720 A General Luis St., Kaybiga, Caloocan City, Philippines

Quality Control

Dates of Employment: November 18, 2003 to May 15, 2004

* Conducted hourly product quality checking such as weight, dimension and other quality attributes to meet the set quality standards, assisted QA staff in their work to expedite the prompt completion of such work, and ensure proper housekeeping is being followed in the work place.

* Lead and supervised 50+ apprentices in their workplace and carry out inline inspection of products to ensure quality standards are met.

* Reviewed all document reports are filed progressively and in timely manner to ensure our end product are met.

QUALIFICATIONS AND SKILLS

* Strong leadership skills. Ability to influence people to improve quality, safety & productivity

* Ability to effectively engage with the client and project key personnel

* Good communication and organizational skills

* Learning agility

* Strong knowledge in Saudi Aramco Engineering Standards and other International Standards in Coating/Painting (SSPC, NACE, ISO, BG, etc.)

* Able to read and interpret various engineering drawings (Isometric, P & ID, GA, etc.)

* Well-experienced in site works especially confined and elevated areas.

* Computer literate. Knowledgeable in Microsoft Office, & AutoCAD

* Leadership skills: became a Seminar Coordinator at school batch 2002-2003, member of the Board of Directors in graduating class of 2002-2003.

EDUCATIONAL ATTAINMENT

Tertiary

Mapúa University (Formerly Mapúa Institute of Technology) SY. 1998 to 2003 - B.S. Mechanical Engineering Graduate

Intramuros, Manila, Philippines

Secondary

Saint James Academy (1994 to 1998)

Malabon City, Philippines

Primary

Saint James Academy (1988 to 1994)

Malabon City, Philippines

SEMINARS AND TRAININGS ATTENDEND

Webinar: Lean Six Sigma Yellow Belt (January 7, 2023)

Dr. Farruk Kidwai and Blue Ocean Training and Consultancy, Dubai

Webinar: Lean Six Sigma (September 23, 2022)

Blue Ocean Training and Consultancy, Dubai

Webinar: Managing Operational Risk and Resilience in a Dynamic Environment (October 17, 2021)

LEORON Professional Development Institute, Sweden

Webinar: Organizational Resilience (September 23, 2021)

Mapúa CCESC and BSI Asia Pacific, Caloocan City, Philippines

Webinar: Emerging Offshore Wind Opportunities in the Philippines (September 22, 2021)

Scottish Development International, Caloocan City, Philippines

Certified Asset Integrity Professional Training: Free Demo Session (September 15, 2021)

Velosi Training Institute, Dubai, UAE

ASNT NDT Ultrasonic Testing Level 2 (August 24, 2021)

The American Society for Non-Destructive Testing Dammam, Kingdom of Saudi Arabia

ASNT NDT Magnetic Particle Testing Level 2 (August 17, 2021)

The American Society for Non-Destructive Testing Dammam, Kingdom of Saudi Arabia

Virtual Technical Session (August 11, 2021)

NACE Philippines and SSPC Philippines Chapter, Caloocan City, Philippines

ASNT NDT Radiographic Testing Level 2 (August 10, 2021)

The American Society for Non-Destructive Testing Dammam, Kingdom of Saudi Arabia

ASNT NDT Dye Penetrant Testing Level 2 (August 5, 2021)

The American Society for Non-Destructive Testing Dammam, Kingdom of Saudi Arabia

NACE Ethics for the Corrosion Professional e-Course (June 22, 2021)

NACE International, Caloocan City, Philippines

Diesel Engine Tune Up (October 13, 2020)

eTESDA Division/NITESD @ Caloocan City, Philippines

Packaged Air Conditioner Unit Servicing (May 7, 2020)

eTESDA Division/NITESD @ Caloocan City, Philippines

Underground STOPAQ Application Training (June 18, 2017)

Albab Trading Co. Ltd., Dammam, Kingdom of Saudi Arabia

SAUDI ARAMCO Work Permit Program (Receiver) (June 8, 2017)

Saudi Aramco Rig Office, Khurais, Kingdom of Saudi Arabia

Chartek 1709 Fire Proofing Inspector Training (July 24 - 26, 2015)

AG&P Yard 1, Batangas, Philippines

Chartek 1709 Fire Proofing Applicator Training (April 7 – 9, 2015)

AG&P Yard 1, Batangas, Philippines

Yamal LNG Project Induction Training (March 20, 2015)

Working at Heights (HSE)

Safety Orientation Course Awareness Training

AG&P Yard 1, Batangas, Philippines

NACE Webinar: Corrosion Under Insulation: What’s Really Under There (February 27, 2013)

Hempel Paints, Bahrain

Hempel Extended Technical Course (October 8 – 17, 2012)

Hempel Paints Kunshan, China

NACE Certification CIP Level 2 (April 21 – 26, 2012)

Dammam, Kingdom of Saudi Arabia

Hempel Inspection Training Course (May 8 – 14, 2011)

Hempel Paints, Kuwait

Windows 7 (February 6 – 10, 2011)

Hempel Paints, Bahrain

Hempel Open Training (April 4, 2010)

Hempel Paints, Bahrain

NACE Certification CIP Level 1 (January 10 – 15, 2009)

Petroleum Institute, Abu Dhabi, UAE

Offshore Onshore Oil and Gas HSE (April 14 – 18, 2008)

O3G HSE, East Ortigas Mansions, Pasig City, Philippines

4th Mechanical Engineering Student Conference (November 28 – 29, 2002)

Mapúa Institute of Technology, Manila, Philippines

Oil Drilling (MALAMPAYA) and Evaporative Air – Conditioning (September 8, 2002)

Mapúa Institute of Technology, Manila, Philippines

ISO 9000 (2000 Edition) Industrial Plant Application (September 1, 2002)

Mapúa Institute of Technology, Manila, Philippines

Waste Water Treatment System for Industrial Plants (August 18, 2002)

Mapúa Institute of Technology, Manila, Philippines

Fire Fighting System (Class B) for Industrial Plants (August 11, 2002)

Mapúa Institute of Technology, Manila, Philippines

Industrial Plant Steam System (August 4, 2002)

Mapúa Institute of Technology, Manila, Philippines

AFFILIATION

NACE Certified Coating Inspector

Member 2009 to present

National Association of Mapua Alumni (NAMA)

Member 2003 to present

Mechanical Engineers Alumni Association of Mapúa Institute of Technology (MEAAMIT)

Member 2003 to present

Society of Manufacturing Engineers (SME)

Member 2001 to 2002

Mathematical Society of Mapúa (MSM)

Member 2001 to 2002

Philippine Society of Mechanical Engineers (PSME)

Member 2001 to 2002

REFERENCES

Rodante B. Idio

QC Lead Painting,

Atlantic, Gulf, and Pacific Company of Manila, Inc. (AG&P)

Email: adw2bd@r.postjobfree.com

Paul M. Fernandez

Painting Supervisor

National Petroleum Construction Co. Ltd.

Email: adw2bd@r.postjobfree.com

Alberto Calayag

QC HS Coating (Team Leader)

Yamgaz B.V.

Email: adw2bd@r.postjobfree.com

Armando Sayat

QC Engineer

Abu Dhabi Oilfield Services (ADOS)

Email: adw2bd@r.postjobfree.com



Contact this candidate