CAREER PROFILE

Electrical Engineer with 35 years of experience in instrumentation & control in projects related with oil, refinery and petrochemical industry with performance in tasks such as engineering, construction and commissioning for compressor plants, flow stations, boilers, pipeline control systems, turbo generators and fuel distribution plants.

TECHNICAL HIGHLIGHTS

Project Management of Automation, Instrumentation and Control Systems

Grown with all aspects of engineering like EPC. Design Engineering and Project Management (Manpower Planning, Construction & Commissioning).

Field instruments, Fire and Gas detection systems.

Electrical Projects, Medium voltage (Conveyors).

Competency in electrical equipment for hazardous area (EEHA).

DCS and PLC. Based systems.

Emergency Shutdown Systems (ESD)

Experienced in the preparation for metering system equipment (Flow Computer).

Management of engineering and construction for compressor plants (planning, organizing and controlling)

Coordination of detail engineering in instrumentation, ESD and fire system.

Supervision of construction.

EXPERIENCE

Visiontec C.A.

Engineering Project Manager (April. 2004-August 2021)

Responsible of planning, organizing, controlling and technical support in the projects. I managed + 20 projects. (Petrochemical industry, Flow Station, MLAG, etc.), Achieving the average, a net profit at the end of the all the projects 30%, with an investment of about US$ 250.000,00/project in automation and control engineering.

REPRESANTATIVE PROJECTS:

●Flare automation at Chevron, Campo Boscan, Venezuela (March 2018-October 2018)

●Flow station automation FE 83 and FE 20 at Chevron, Campo Boscan, Venezuela (July 2004-Febrary 2005)

●ESP and VFD installation engineering, at Chevron, Campo Boscan, Venezuela (July 2004-Febrary 2005)

●Rod Pump Controller and RTU installation engineering, at Chevron, Campo Boscan, Venezuela (June 2006-January 2007)

●Review of the ASDPE El Palito refinery project (Electric SCADA) (November 2020-March 2021)

●Review of the Water Quality Improvement Project (January 2020-September 2020)

●Automation of Flow stations BB8, JJ9, JJ66, Lake Maracaibo PDVSA, Venezuela (August 2018-April 2019)

●Basic engineering and detail of Chemical Injection Packages of Flow Stations BA9, CC6. PDVSA, Venezuela (November 2017-April 2018)

●HH8 control system update PDVSA, Venezuela (January 2016-September 2016)

●Replacement of Relay Logic by PLC in Compressors and Integration to the Control System in the Bajo Grande Plant, PDVSA, Venezuela (February 2006-December 2006)

●Development of the detailed engineering of the change of the BMS and ESD of the project of the boilers of Block 29, Amuay, PDVSA, Venezuela (October 2003-February 2004)

●Development of the detailed engineering of the project "ESD Planta Lubricantes Amuay", PDVSA, Venezuela (September2004-March 2005)

HYTEK Ingeniería C.A, Punto Fijo, Venezuela

Project Engineer (Apr. 2003-Apr. 2004)

Responsible of Detail Engineering of Instrumentation for 4 projects refinery equipment (boilers, tanks, compressors, heat exchangers) also includes the control system (DCS, PLC) and protection (ESD). Achieving the average, a net profit at the end of the all the projects 25% with an investment of about US$ 150.000,00/project in engineering of automation and control.

REPRESANTATIVE PROJECTS:

●Development of the detailed engineering of the project "Change of FCC Honeywell Controllers", Amuay, PDVSA, Venezuela (January 2003-July 2003)

●Development of detailed engineering of the project "ESD Catalitica, Cardon", PDVSA, Venezuela (October2004-April 2004)

STICA, Maracaibo, Venezuela

Engineering Coordinator (Jan. 1996- Aug. 2002)

Responsible for development of the project according to the scope of the specifications given by the customer, planning, organizing, and controlling. technical support in the projects, Automation of 8 turbo compressors, + 8 boilers and 2 project related with automation of pipe line (metering system equipment & Instrumentation) with an investment of about US$ 150.000,00/project in engineering of automation and control. Achieving the average of a net profit at the end of the all the projects 25%.

REPRESANTATIVE PROJECTS:

●-Development of the Instrumentation Detail Engineering of the Flow Station UD-03 PDVSA. (February 2002-August 2002)

●Coordinator of Detail Engineering and Construction of the Project to Replace Control System Frame V Units, Las Morochas LM-10 Power Plant. Dresser-Rand Controls Houston, PDVSA Venezuela (March2001-December 2001)

●Coordinator of Detailed Engineering and Construction of the Project to Replace Control System Frame V Units, Power Plants Punta Gorda PG-14 and Pueblo Viejo PV-09. Dresser-Rand Controls Houston, PDVSA Venezuela (January 2000-September 2000)

●Coordinator of the Atacama Gas Pipeline Supervision System, GASATACAMA, Chile and Argentina (January 200-April 2000)

●Project Management, Detailed Engineering and Construction of the Supervision and Control System of the Steam Generating Plant HH-8 PDVSA, Venezuela (February 2000-November 1999)

●Project Management, Detail Engineering, Construction Coordination of the LPG Anti-Swell Control System in Bajo Grande PDVSA, Venezuela (October 2008-March 1999)

●Detail Engineering Coordinator, QA/QC for construction, testing and start-up of the Fisher-Provox distributed control system at the Fior Pto. Ordaz Plant, Venezuela (July 2000)

●Detail engineering, interconnection with the Dresser-Rand control system of the automation project for the new Barúa V and Motatán II compressors, PDVSA, Venezuela (September 1997-January 1998)

MCL CONTROL, Maracaibo, Venezuela (Jan 1991-Dec 1995)

Field Engineer

Responsible for more than 10 projects as Field Engineer offshore and onshore, Achieving the commissioning on time.

Design of + 10 Engineering Projects in Electrical, Instrumentation and Control Systems.

REPRESANTATIVE PROJECTS:

Detail engineering of the Integration of Signals of the Fire Fighting System of the Lama Complex, PDVSA. (January 1994-April 1994)

-Engineering of details of the operational integration of four (4) Solar turbo-generators using "Power Measurement" measurement systems. (July 1993-November 1993)

-Detail Engineering of the Fire Protection System of the Lamarlíquido plant, (March 1993-July 1993)

-QA/QC of the Instrumentation of the Sumandes Project, El Vigía Distribution Plant, San Lorenzo, PDVSA. (January 1991-July 1992)

-Basic Engineering of the electrical supply system of a distributor control of the Plastilago plant. Provap Project, (May 1992-July 1992)

C.A. CERVECERA NACIONAL, Caracas, Venezuela

Engineering Coordinator (Apr.1988-Dec.1990)

REPRESANTATIVE PROJECTS:

Coordination of the automation with Programmer Logic Controller (PLC) and implantation for the area of the packing of the beer. Achieving the commissioning on time

-Engineering details for power supply and instrumentation of train 1-A, Barquisimeto Plant, Cervecera Nacional, (March 1998-July 1998)

-Design and execution of electrical installations for the production and packaging area, Cervecera Nacional., (January 1998- March 1998)

-Project of Electrical Installations and Control of the modification of Train 6 of the Boleíta Plant for the packaging of Non-returnable Bottles. Includes: Depalletizer, Rinser, Fillers, Pasteurizer, Level Inspectors, Labeler, Wrapper, Thermoplastic and Palletizer, Boleita Plant, National Brewery.

-Installation and development of control logic for the palletizing machine with PLC 2/16 ALLEN BRADLEY, Boleita Plant, Cervecera Nacional

ECTROIND, Valencia, Venezuela

Service Engineer (Jul..1987-Apr.1988)

Service Engineer in charge of speed control systems for DC motors.

INTEC GUAYANA

Project Engineer (Mar.1987-Jul.1987)

Control systems design for industrial ovens

EDUCATION

Electrical Engineer, Andes University, Venezuela (1978-1986)

Integrated Learning Language (English), CEVAZ, Venezuela (1998-2000)

The Secrets of Effective Leadership (2007)

Manufacturing Procedures for Control Panels Dresser-Rand Controls, Houston (2001)

Operational Procedures for GE Frame V Turbines General Electric. (2001)

Selection of Control Systems Jornadas Panamericanas de Instrumentación y Control (1994).

Design of Control Strategies for Industrial Process

Instrumentation and Measurement Principles. MCL Control, S.A.

Programming and System Configuration Triple Modular Redundant TRICONEX. HONEYWELL.

Basic Instrumentation and Control System Technologies. MCL Control, S.A.

Communications Processor CP 526. Siemens.

TSX-47 Programmable Controller Schneider Telemecanique

Simatic S5 - 115U/ PG685.Siemens

Allen Bradley PLC-5 Series Programmable Logic Controllers.

Allen Bradley PLC-2 Series Programmable Logic Controllers.

AETI CLP-44 Series Programmable Logic Controllers.

Basic Industrial Applications for Programmable Logic Controllers. CIV

Speed Control for DC Motors, Reliance, Electroind. Valencia.

LANGUAGES

Spanish (Native)

English (Medium)



Contact this candidate