Jesse B. Vejar Resume / * each pages
Objective: Seeking a Challenging Position
Jesse B.Vejar
c. 945-***-****
**********@*******.***
Desoto, Texas 75115
Work History:
Intertek PSI,
November 2021 to March 2023
Senior QA Inspector
My responsibilities include Initial and Final Inspections for
• Concrete Paving
• Structural Concrete
• Traffic Barrier on Streets and Bridges
• Structural Rebar
• Curb and Gutter
• Sidewalk
• Driveways
• Concrete Repair
• Punch List
Archer Western/PMC/Reyes.
Terminal D Expansion DFW Airport
Dallas, Texas
July 2019 to June 2021
Security Badged Superintendent
My responsibilities included
General Oversight of job for General Superintendent
Safety
Site prep and work
General Rough In Work
Finishes
Final punch list
Archer Western / Herzog
TEX Rail CM/GC Construction Services
27 mile Commuter Rail System Segment 3
Fort Worth to Grapevine, Texas
June 2017 to July 2019
Quality Control Manager
My responsibilities included inspections monitoring of :
• Construction at 3 Stations (Beach St. Iron Horse, and Smithfield)
• Forming, rebar, and placement inspections
• Drilled Shafts
• Abutments, Columns. and Caps
• Concrete Girders
• Bridge Decks
• Electrical R/I and Finish Installation
• Plumbing /Mechanical R/I and Finish Installation
• Architectural Concrete Misc. Metals and Finishes
• MSE, CIP, Structural, and Retaining Walls
• Prep, Lime, Fine Grade Park & Rides and City Streets
• Densities and Gradations
• Concrete Paving, Sidewalk, Approaches, Handicap Ramps
AGL Constructors
Archer Western Contractors, Granite Construction Co. and The LANE Co.,
(IH-35E) 35Express Segments 1 to 4
Dallas to Denton, Texas
July 2016 -June 2017
Quality Control Manager
I was responsible for the inspection of:
• Structural concrete, mass placements, bridge decks:
• MSE and CIP Walls
• Forming, rebar, and placement inspections
• CCRP and Small concrete: paving, box culverts, drainage structures, curb & gutter, driveways, sidewalks and ramps, slip form barrier
• Drilled Shafts
• Concrete Repair
• Abutments, Columns. and Caps
• Concrete Girders
• Densities monitoring
• Completion Punch List
Ferrovial Agroman
North Tarrant Infrastructure,
NTE 35W
Bluebonnet Contractors,
NTE 121/183
North Richland Hills to Fort Worth, Texas
Nov 2011 – Nov 2015
General / Concrete Superintendent
$1.0 & $1.6 billion, design-build, managed lane projects in Fort Worth. I was responsible for:
• Subcontractor and self-perform supervision
• Structural concrete, mass placements, bridge decks:
forming, rebar, and placement inspections
• Small concrete: paving, box culverts, drainage structures,
curb & gutter, driveways, sidewalks and ramps, slip-form barrier,
etc...
• Concrete repairs
• Dirt work and heavy equipment
• Purchasing/rental and tracking of tools and equipment
• Time keeping and reporting
• 3 and 4 week look ahead scheduling
• Safety enforcement
• Project completion punch list
Hensel Phelps Construction Company
Oct 1998 – Oct 2010
Superintendent
Sports and Entertainment Arena, Raleigh, N.C. Launch Complex 41, Cape Canaveral
Wal-Mart Distribution Center 63, La Grange, GA
Federal Prison, Bennetsville, S.C.
Concourse J, Miami International Airport
United States Southern Command Center, Miami, FL
I was responsible for:
• Equipment, tool purchases, and rentals
• Safety enforcement
• Subcontractor and self-perform supervision
• Planning Charettes
• 90 day & 4 week schedules with Microsoft Project • Chaired weekly schedule meetings
• Resolved quality issues
• Field engineer, office engineer and craft mentoring • Long and Short Interval Production Scheduling
• RFI's and Submittals
• Cost analysis management
• Project completion punch list
• Equipment, tool, purchases, and rentals
Centric / Jones Constructors
August 1996 to October 1998
Concrete / Self Perform Superintendent
Mohawk Water Treatment Plant
Tulsa, Oklahoma
• Equipment, tool, purchases, and rentals
• Clarifiers, Flocculators, Chemical Bldg, Pump Rooms, and Filter Bldg.
• Foundations and Structural walls
• Structural and Slabs on Metal Decks
• U/G pipe, electrical, and Storm structures
• Assisted with equipment installation
• Filter Media installation
• Punch list
• Final finishes and turnover
• Equipment, tool, purchases, and rentals
Goodwin Brothers Construction Company
July 1994 to August 1996
North Topeka Waste Water Treatment Plant
Topeka, Kansas
• Equipment, tool, purchases, and rentals
• Excavation and Rebar
• Foundations and Structural walls
• Clarifiers, Head Works, Chemical Bldg, Pump Rooms
• Foundations and Structural walls
• Structural and Slabs on Metal Decks
• Excavation for U/G pipe, electrical, and Storm structures
• Assisted with equipment installation
• Punch List
• Final finishes and turnover
• Equipment, tool, purchases, and rentals
Centric / Jones Constructors
November 1992 to June 1994
Concrete / Self Perform Superintendent
Metropolitan Water Treatment Plant
Kansas City, Kansas
• Equipment, tool purchases and rentals
• Excavation and Rebar
• Structural and Slabs on Metal Decks
• Mass concrete placements
• Foundations and Structural walls
• Clarifiers, Chemical Bldg, Pump Rooms, and Filter Bldg.
•U/G pipe, electrical, and Storm structures
• Assisted with equipment installation
• Filter Media installation
• Punch list
• Final finishes and turnover
• Equipment, tool, purchases, and rentals
Centric / Jones Constructors
June 1989 to November 1992
Concrete / Self Perform Superintendent
Central Arizona Project
Twin Peaks and Sandario Pump Stations
Marana, Arizona.
Black Mountain / Snyder Hill Pump Stations
Tucson, Arizona
• Bank Protection / Canal liner prep and placement
• Excavation and Rebar
• Mass concrete placements
• Foundations and Structural walls
• Clarifiers, Chemical Bldg, Pump Rooms, and Filter Bldg.
• Structural and Slabs on Metal Decks
• U/G pipe, electrical, and Storm structures
• Assisted with equipment installation
• Punch list
• Final finishes and turnover
McGrath Construction Company
November 1987 to June 1989
LACTTC Blue Line
Foreman
Long Beach to Los Angeles, California
• Excavation and Rebar
• Foundations and Structural walls
• Concrete Paving
• Traffic Barrier
• Curb and Gutter
A&A Concrete Company
February 1985 to June 1989
Various Commercial,Industrial, and Residential Constructon
In the Tucson, Arizona Area
General Field Foreman
W.J. Hardy Concrete Contractor
February 1980 to June 1985
Crew Foreman
Various Commercial,Industrial, and Residential Constructon
In the Tucson, Arizona Area
Various Commercial,Industrial, and Residential Construction
In the Tucson, Arizona Area
Estes Homes Construction
June 1975 to February 1980
Concrete Superintendent
Several Residential Projects in the Tucson Arizona Area
Ortega Construction Company
June 1971 to June 1975
Laborer / Framer / Concrete Worker / Foreman
Various Commercial,Industrial, and Residential Construction
In the Tucson, and Sierra Vista, Arizona Area
EXPERIENCE
45+ Years in Construction
Veteran of the US Marine Corps
American Citizen
ACCOMPLISHMENTS
• Safety award for supervising 500,000 Man-Hours
without a lost time accident
• Honorable Discharge United States Marine Corps
• First Aid/CPR
• OSHA 30 / Competent Person Certified
• Completed North Tarrant Express project one year ahead of schedule
• Completed LC 49 Atlas 5 launching pad for Lockheed Martin, ahead of the Boeing complex, allowing Lockheed
Martin to launch a highly sought after
communications satellite first
• Completed Federal Prison project 6 months ahead of schedule and saved $1 million
• Several awards for labor. safety,
and money saving ideas that have been successfully implemented
LANGUAGES English – Fluent Spanish - Fluent
FEDERAL AND MILITARY PROJECTS
NTTP 121 / 183 Toll and Managed Lanes with 14 Bridges /Hurst to Bedford, Texas
35W Fort Worth, Texas Managed Lanes with 4 Bridges crossed Trinity River
US Southern Command /Doral, Florida
Concourse J, Miami International Airport
FBOP Federal Prison /Bennettsville, S.C.
NASA/Evolved Expendable Launch Vehicle (EELV) / Cape Canaveral, Florida
PRIVATE SECTOR PROJECTS
Parkland Hospital Parking Garage/Dallas, Texas
Wal Mart Distribution Center DC#64/La Grange, Ga,
Entertainment & Sports Arena/ Raleigh, N.C
WATER TREATMENT PLANT PROJECTS
Mohawk WTP/Tulsa, Oklahoma
North Topeka WWTP/Topeka, Kansas
Metro WTP/Kansas City, Kansas
Central Arizona Project / Marana Az. to Tucson Az.