ARJUN SHANTARAM ZOPE
OBJECTIVE:
Seeking assignments and growth in commissioning/ production in oil and gas industry.
Executive Summary
He has over 25 years of experience in oil and gas plants, refineries and petrochemicals.
Recently worked at Saipem S.p.A. as Commissioning Supervisor
He is experienced in commissioning and mechanical completions. His scope of work includes:
Finalise Mechanical Completion status documents:
Responsibilities Handled related to mechanical completion
1. Update P&ID, General Arrangement Drawings Vendor documents for 'As Built'
2. Prepare various ITRs for Mechanical Completion dossiers.
3. Prepare and close the punch list and include it in dossiers.
Writing and issue of any Job Safety Analysis procedures
Responsibilities Handled related to JSA
1. Prepare JSA procedure before every major activity.
2. Get approved from management, safety department, client.
3. Discuss with commissioning team for the same.
4. Monitor follow up of the procedure during the activity.
Carry out vessel and column inspections against engineering specifications and participate in column internal installation check-out
Responsibilities Handled during vessel inspections
1. Prepare work permit, JSA
2. Prepare documents related to inspection i.e. latest P&ID, GA drawings, Contract documents related to the equipments, vendor manuals, notes from operating manuals etc.
3. Inspection with client representative for the equipments, note down the mismatch.
4. Follow up for update documents 'As built', clear the punch
5. Add the punch list to dossiers
Prepare Permit to Work Applications
Responsibilities Handled regarding Work Permits
1. He has attended trainings related to work permits at BAFCO, Qatar Petroleum, SAMIR refinery etc.
2. Responsible for prepare permits, related documents
3. Supported safety department for monitoring, improving work permit system.
Finalising sub-system Cold Commissioning Manuals
Responsibilities Handled regarding Cold Commissioning Manuals
1. He has experience of preparing manuals and operating procedures.
2. Review of procedure submitted by licensers, vendor and form contractor's engineering
3. Update and modify as per site requirements and HAZOP suggestions.
4. Get approved form the managements and clients
5. Arrange training for commissioning and client teams regarding the same.
Professional experience in detail
SPIE Oil and Gas International Ltd
Commissioning Specialist, for SABIC and KNPC Refinery
Since July 2016 to May 2021
Making improvements to and offering advice about commissioning procedures and operational procedures.
Scheduling and coordinating work to tight deadlines with EPC and PMT.
Review of EPC received deliverables like system definition, system register, generic pre-comm. procedure, system marked up P&ID’s, 3D’s and commissioning and start up procedures along with their respective focal points.
Issuing biweekly C&SU reports along with updated status from construction, pre-comm. & commissioning and operation readiness for management review.
Maintaining a tracing record for commissioning and operation binders, training schedule for operation folks in collaboration with technical advisors.
Review of Mechanical Completion Dossiers, Certificate and agreed Exception List; submitted for approval by EPC through PMT.
Witnessing of all pre-comm. activities along with discipline representatives and as per Aramco setting standards like cleaning matrix.
Saipem S.p.A.
Commissioning Supervisor, for ENI S.p. A. Congo
February 2015 to April 2016.
Participated in Systems Completion acceptance processes including punch lists, design changes and commissioning reports
to assist construction department by defining the priority systems according with overall construction and pre-commissioning and commissioning planning and schedule.
Assisting in the development and maintaining a detailed start-up schedule and detailed set of start-up packages to track Start-up completion and progress,
Preparation of Pre-commissioning, commissioning and start up execution details.
Commissioning Supervisor
Petrofac International Limited, for Qatar Petroleum, Qatar
September 2012 to August 2014
Prepare and update Outstanding Work List OWL regularly for process department.
Prepare commissioning procedures as for first gas in, hi pressure leak test, tie in points commissioning etc.
Monitor the preservation of equipments, facility packages, instruments, piping, vessels etc.
Prepare work permit and Job safety Analysis for various pre-commissionoing activities like air blowing, inerting, high pressure leak test and first gas in.
Get sign the Inspection and Test Records [ITRs] from the clients after inspections of system, packages etc.
Participate in safety walk, weekly meeting representing process commissioning department.
Coordinate with safety department for mob drills preparation for safe activity execution plan.
Prepare Job Safety Analysis before every activity and get approved from the client.
Process Shift Supervisor
Hindustan Petroleum Corporation Limited
October 2011 to September 2012
Direct, control and supervise the activities of assigned persons of fields and panel board, including start ups and shut downs.
Prepare various production reports.
Troubleshoots minor problems and report major problems, emergencies to Production Manager with proposed solutions.
Supervise the preparation of equipment for routine, break up and planned maintenance activities as per established procedure.
Supervise and ensure subordinates and contractors are fully aware and adhere to company's HSE policies, procedures, standards and systems.
Commissioning and Start Up Supervisor
Larson and Toubro limited
June 2010 to September 2011
Ensure all commissioning work executed conforms to the latest construction drawing and P&ID to the approved commissioning procedure.
Assists in reviewing engineering drawings and commissioning procedures to ensure that adequate provisions have been made for testing, flushing, cleaning and other commissioning activities.
Maintains a safe and healthy work environment by following and enforcing established project procedure relating to safety, work permitting and work order systems adhering to legal requirement.
Participates in team execution plans to support project schedules.
Support cleaning, flushing, and pre-commissioning of all plant mechanical activities.
Supports equipment vendor Technical Assistants, as required, during the pre-commissioning, commissioning and start up
Supports project specific Lock Out / Tag Out (LOTO) program.
Commissioning Supervisor
Snamprogetti, for SAMIR Refinery, Morocco
September 2008 to January 2010
Preparation of commissioning method statements.
Prepare punch lists
Operation test procedure, systems markups in P&ID, Test pack review etc.
Preparation and follow up of plans for pre-commissioning activities.
PMC Engineer
Chiyoda Corporation, For Ras Gas, LNG Project
January 20008 to August 2008
Prepare punch lists and follow up for the punches.
Coordinate subcontractors with regards to their daily activities.
Monitor work progress by subcontractors and PMC team in accordance with PMC schedule.
Prepare different types of procedures and related documents.
Pre-commissioning Supervisor
JGC Corporation for BAFCO Refinery
October 2006 to May 2007
P&ID check for system readiness for mechanical completion, prepare punch lists,
Compiling 'As built' drawings to reflect changes implemented during construction, commissioning phase.
Supervise pre-commissioning and commissioning activities like blowing flushing, leak test, inerting etc.
To carry out Tool Box talks with commissioning team.
Prepare work permit for the various pre-commissioning and commissioning activities and carry out safety walk downs.
Commissioning Supervisor
JGC Corporation for Aromatic project, Indonesia
January 2006 to July 2006
Pre-commissioning activities like leak test, Mechanical Test Runs, Vessel Inspection.
Start up activities of the plant.
Participate in performance guaranty test run by monitoring and optimizing the performance as per instructions.
Commissioning Operator
Bharat Petroleum Corporation Limited/ Larson and Toubro Limited
June 2005 to August 2005.
Pre-commissioning activities and start up and stabilization of each unit of the plant including compressor test run with nitrogen and hydrogen.
High pressure hydrogen storage unit 180 barg/sq. cm and steam generation unit.
Participated in performance test run.
Reliance industries limited
Process Operator
December 1989 to June 2003
The para-xylene plant I worked, also produce additional aromatic products like benzene and LPG.
The key units include:
Naptha hydrotreating: The process included removal of toxins from naptha for Platforming reactor
Reforming – The UOP CCR Platforming process selectively reforms naphtha to aromatics (BTX) and high purity hydrogen.
Para-xylene Separation – The UOP Parex process recovers high purity para-xylene from mixed C8 aromatics isomers.
Xylene Isomerization – The UOP Isomar process re-establishes an equilibrium mixture of xylene isomers via xylene isomerization and conversion of ethyl benzene to benzene or xylenes.
Toluene and Heavy Aromatics Conversion – The UOP Tatoray process disproportionates toluene and transalkylates toluene with C9/C10+ aromatics to produce benzene and xylenes.
Toluene Selective Disproportionation – The PX Plus™ Process selectively disproportionates toluene to produce benzene and xylenes with near 90% para-xylene content, significantly above the equilibrium.
Aromatics Extraction – The UOP ED Sulfolane™ process extracts benzene and toluene from the reformate using an extractive distillation flow scheme.
Monitoring in the field by patrolling regular intervals.
Equipment changeover/isolation for maintenance.
Ensuring strict compliance with safety procedures and work permits.
Follow up for proper housekeeping.
Participate in safety mob drills, fire fighting drills, quality circle activities etc.
Internship
Trained in same plant since September 1988 to September 1989 as an Apprentice Process Operator.
ACHIVEMENT:
While reading round found a pump mechanical seal found excessive leak and further rising, immediately informed to shift supervisor and prepared stand by pump for change over. During changeover of the pump a cloud of xylene fumes was formed. The pump changeover and isolation of the defective pump was done in cloud and showers of xylene. I was appreciated by GM and rewarded appreciation letter for the same.
Academic background and professional qualifications
S.S.C. Mumbai 65.57% 1984
Diploma in Chemical Engineering Mumbai 70.18% 1988
TRAINING ATTENDED:
a)Permit Issuer Training
b)SCBA Training
c)Lockout-Tagout Safety Training
d)Confined Space Training
e)Scaffolding Safety Training
f)H2S Gas Safety Training
g)Work at Height Training
h)Fire Fighting Training
PERSONAL DETAILS:
Name: Arjun Shantaram Zope
Address 102, Mauliashish CHS, Near Model English School,
Pandurangwadi, Dombivli East, Maharashtra, India
Phone No. +998*******
Email ID adw01n@r.postjobfree.com
Date of birth: 4th July 1969
Languages English, Hindi and Marathi.