Post Job Free
Sign in

Project Manager Onsite Customer

Location:
Parkdale, AR
Posted:
March 18, 2023

Contact this candidate

Resume:

Fred “Leon” Vann

* ********** **.

Vilonia, AR **173

501-***-**** (cell)

**********@*****.***

Education

OSHA 30 General Industry

OSHA 30 Construction

Navy Technical Course(s)

EMT Nationally Certified

Hydraulics

Pneumatics

Refrigeration/ with EPA Certification

Diesel Maintenance

University of Arkansas at Little Rock

Major: Nursing (26 credits)

J.A. Fair High School, Little Rock, Arkansas

Graduate, 1986

Work History

Mechcore-Jacksonville, Florida

April 2021-Present

Position: Site Manager/Field Project Manager

• Maintain a safe work site in accordance with OSHA, Mechcore, and our customer’s safety standards and requirements.

• Know the scope of work and project deliverables based on the proposal and the layout drawings

• Manage communications with the onsite customer, Project Manager, the Mechcore Project Manager, Mechcore internal team, and all installation trades.

• Drive the project schedule based on the customer and Mechcore timeline expectations

• Manage site resources and communicate any needs and/or concerns with the Mechcore Project Manager

• Assist with the construction permitting process. This would include, scheduling inspections, delivering permit packages to the appropriate location in the area, obtaining the permit once it is ready for pick-up, coordinate with the inspectors, etc.

• Supervise the loading/unloading of trucks with material or equipment.

• Ensure that incoming loads are carefully inventoried and communicate errors to the project manager and the driver.

• Ensure all invoices and Bills of Lading/Packing List are sent to accounting in a timely manner.

• Maintain a good working relationship with the Customer and their representative.

• Assist the Project Manager as needed with project change m notices (PCN)

• Prepare and submit daily site reports using MS Word or Excel.

• Manage project quality in conjunction with the Project Manager

• Work with the Project Manager for a smooth handoff of the project to the customer upon completion.

• Manage and maintain an accurate set of “Red Lined Drawings” and make sure they are turned over to the Project Manager or engineering at the end of the project.

• Maintain an active punch list of items that need corrections and when those items are completed.

• Completed over a dozen jobs on time and under budget. S&H Systems – Jonesboro, Arkansas

May 2019-Apr 2021

Position: Site Manager

• Maintain a safe work site in accordance with OSHA, S&H, and our customer’s safety standards and requirements.

• Know the scope of work and project deliverables based on the proposal and the layout drawings

• Manage communications with the onsite customer Project Manager, the S&H Project Manager, S&H internal team, and all installation trades.

• Drive the project schedule based on the customer and S&H timeline expectations

• Manage site resources and communicate any needs and/or concerns with the S&H Project Manager

• Assist with the construction permitting process. This would include, scheduling inspections, delivering permit packages to the appropriate location in the area, obtaining the permit once it is ready for pick-up, coordinate with the inspectors, etc.

• Supervise the loading/unloading of trucks with material or equipment.

• Ensure that incoming loads are carefully inventoried and communicate errors to the project manager and the driver.

• Ensure all invoices and Bills of Lading/Packing List are sent to accounting in a timely manner.

• Maintain a good working relationship with the Customer and their representative.

• Assist the Project Manager as needed with project change m notices (PCN)

• Prepare and submit daily site reports using MS Word or Excel.

• Manage project quality in conjunction with the Project Manager

• Work with the Project Manager for a smooth handoff of the project to the customer upon completion.

• Manage and maintain an accurate set of “Red Lined Drawings” and make sure they are turned over to the Project Manager or engineering at the end of the project.

• Maintain an active punch list of items that need corrections and when those items are completed.

• Completed over a dozen jobs on time and under budget. Marietta American - Olive Branch, Mississippi

March, 2000 – May, 2019

Position: Lead Maintenance Mechanic

Produce soap from start to finish. Maintain and repair production equipment, using drills, lathes, end mills, band saws, small handheld tools as well as stick, mig, and tig welding. Fabricate parts as needed.

Birmingham Steel – Memphis, Tennessee

October 1999 – January 2000

Position: Maintenance

Outside maintenance as a millwright.

United States Navy

September 1988 - October 1999

Position: Machinist Mate 2nd Class

Worked on hydraulics, pneumatics, refrigeration, plumbing, diesel, and atmosphere control equipment. Attended various fire fighting and damage control schools. Nationally certified as an emergency medical technician.

Kentucky Fried Chicken Little Rock, Arkansas

November, 1984 – September, 1988

Position: Assistant Manager

Managed the restaurant in every aspect (employee and customer safety, customer service, preparing food, and managing employees).



Contact this candidate