Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Cambodia
Salary:
0
Posted:
March 16, 2023

Contact this candidate

Resume:

RESUME

SANJEEV MEHROTRA

Contact No: +855********, +917*********,

E-mail - advynp@r.postjobfree.com

advynp@r.postjobfree.com

Skype ID: - advynp@r.postjobfree.com

Career Objective: - Seeking opportunity in organization repute in the Power Plant (Thermal/Oil/Gas/Combined Cycle)/Renewable Energy/Nuclear Power /Waste Management /Oil/ Gas /Refinery/ Metal/ or in such core Mechanical Eng. Where I can utilize my knowledge, skills, and attitude towards growth of organization.

Organisational total experience: - 14.0 years + continue.

Abroad experience : - 4 Years +

Expertise area: - Operation & Commissioning/Certified Clean Energy Professional

Thermal Power Plant-Supercritical/PFBC/CFBC}/Oil/Gas Power Plant/FGD

Combined Cycle Power Plant Exp. Gas Turbine+HRSG

Wind

Nuclear power (TG)

Key skills: - Operation (DCS) & Commissioning exp in Thermal power plant- CFBC, PFBC, SUPERCRITICAL, Coal/Oil/Gas fired Boiler, Steam Turbine, BTG, BOP, FGD (Flue gas desulphurisation), Combined cycle power plant, HRSG, WHRB, Gas turbine GE-7EA,6FA,9FA, Siemens V94.2, Nuclear power (TG), Wind, Chlorination Plant, PTW system. Hydrogen generation plant. Knowledge about the Solar power.

PROFESSIONAL CAREER: -

Current Status: - (3 Years + continue)- Currently working in Cambodia Energy Ltd, Sihanoukville as a Shift charge Engineer in Operation of 150MW CFBC Thermal power plant Since Nov 2019 to till date. Handling & maintaining plant operation, Commissioning &, Plant performance activity.

S. No

Organisation

Duration

Designation & work profile

Plant Capacity & Technology

2

Dodsal Enterprises Pvt. Ltd. At Nuclear power Corporation of India, KAKRAPAR, Gujrat.

Oct 2019 to Nov 2019

(02months)

Commissioning Engineer (TG)

-Worked in 2x700MW TG commissioning of nuclear power. NPCIL (Nuclear power Corporation of India, KAKRAPAR, Gujrat. Its IPHWR-700 (Indian Pressurized Heavy Water Reactor-700

3

L&T Sargent and Lundy in SES (Special Engineering Services) Department

May 2018 to Oct 2019

(1.5Years)

Operation & Commissioning Engineer

- Worked in L&T-S&L and deployed in Jindal Industries Thermal Power Plant (JITPL) 2x600mw. Angul Orissa, India. For monitoring plant operation, performance & Maintenance activity.

-Successfully completed Combined cycle power Projects. L&T provided Manpower support for Combined Cycle power plant Control Room Operation & Commissioning Engineer in EPC & O&M contractor of Çalık Energy Turkmenistan.This is Ministry of Energy of Turkmenistan project: - 1574 MW (Mary-3 Combined Cycle Power Plant, Turkmenistan) (4x264 MW (Gas Turbine) + 2x265 MW (STG + 4 HRSG). Gas turbine (GE GTG – 9FA) and STG. supplied by GE and HRSG (HP/LP dual Drum) supplied by CMI.

4

OMS Solutions Pvt Ltd O&M Contractor of Sravanthi Energy Pvt Ltd Kashipur Uttarakhand. India

Feb 2018 to May 2019

(3Months)

Control Room Operation & Performance.

{Combined Cycle Power Plant- GE-6FA}

Worked as a Control Room Operation & Performance Engineer

in OMS Solutions Pvt Ltd O&M Contractor of Sravanthi Energy Pvt Ltd Kashipur Uttarakhand. India. Its 450MW (Combined Cycle Power Plant) (2X225MW) (4x75MW Gas Turbine + 4x38MWHRSG). Gas turbine (GE GTG – 6FA). And HRSG (HP/LP dual Drum) supplied by Green Power Co.Ltd. STG supplied by Hangzhou Steam Turbine Co Ltd.

5

Enmas India Ltd. Under (National Contracting Co. Ltd, Saudi Arabia)

Qassim Central Power Plant (SAUDI ELECTRIC COMPANY)

Al Qassim Saudi Arabia.

Oct 2017 to Feb 2018

(05 Months)

Control Room Operation & Commissioning Engineer-

{Combined Cycle Power Plant- GE-7EA}

Worked in Qassim Central Power Plant. Saudi Arabia.

1128MW (Combined Cycle Power Plant) (3X376MW) (12x60MWGas Turbine + 12x34MWHRSG).

Gas turbine (GE GTG - 7EA). And HRSG (HP/LP dual Drum) supplied by CMI. 3x136 MW STG supplied by Fuji Electric Co.Ltd.

6

WIND WORLD INDIA LTD formerly known (Enercon India Ltd). Mandsaur MP

May 2017 to Oct 2017

(06 Months)

Assistant Manager- (Wind Power Operation & Maintenance.)

Worked as a Lead Site In charge.

Maintained of WEC Operation, performance of total 45 no of WEC-E53 (840KW/WEC) - 38MW.

7

GMR Chhattisgarh Energy Limited, Raipur (CG. India)

Aug 2014 to April 2017

(2.8 Years)

Control Room Operation & Commissioning Engineer

(Associate Manager)

{Thermal Power Plant (Super Critical Power Plant)}

Worked in 2x685 MW Supercritical thermal power plants, boiler & turbine plant erection and commissioned by Doosan Heavy Industries & Construction Company. Turbine supplied by Doosan power system India ltd and make by GE (General Electric).

8

TATA Power Co. Ltd, Trombay, Mumbai, India

Sep 2010 to Aug 2014

(3.11Years)

Control Room Engineer.

& FGD In Charge.

{Thermal power Plant (Coal+Oil+Gas) Fired power plant.

Combined Cycle Power plant- Siemens V94.2.

FGD (Flue gas Desulphurisation)}

Worked in 2x500 MW coal/oil/gas fired)/205MW (combined cycle) power plant.

Trombay plant is 1580 MW. I worked in 2X500 MW Thermal power plants Boiler Make by BHEL and Turbine supplied by CRAFTSWORK UNION & BHEL, Here India 1st 500mw and FGD (Flue Gas Desulphurization) plant. And its own 2*500MW, 1*250MW, and 1*150MW pulverized coal fired boiler and 1*205MW CCPP (combined cycle power plant.).

9

BHUSHAN POWER & STEEL LIMITED, SAMBALPUR ORISSA, (India)

July 2008 to Sept 2010.

(2.2Years)

Control Room Operation & Commissioning.

{Thermal Power- CFBC

(Circulating Fluidised Bed combustion )}

Worked in 2X130 MW (CFBC Boiler) thermal power plant.

It is an integrated steel plant having 2X130 MW (CFBC Boiler) thermal power plant of ISGEC JOHN THOMPSON make and 4X58 TPH WHRB (Thermax make). Its 2X130MW unit has 4X210TPH CFBC Boiler. TG unit has been supplied by Siemens.

COMMON JOBS & RESPONSIBILITY: -

THERMAL /OIL/GAS POWER PLANT RESPONSIBILITY: -

Hands on experience in control room operation & commissioning of 2x685MW (Super Critical Boiler), India first 2x500 MW PULVERISED COAL/OIL/GAS FIRED BOILER (Subcritical Boiler), 2x130MW & 150MW CFBC (Circulating Fluidize Bed Combustion), steam turbine & BOP equipment, plant startup / shut down/emergency handling & smooth control room operation.

15 Days Inhouse simulator training in 685MW Supercritical (GMR Energy ltd) & 500MW (TATA Power Co. Ltd).

15 Days training, conducted by Doosan Heavy Industries, in South Korea for 2x685MW power plant familiarization.

Working knowledge on DCS (YOKOGAWA) and turbine operation of GE -MARK VI.

Worked as a shift in charge in India first FGD (Flue Gas Desulphurization).

Worked in chlorination plant and HYDROGEN Generation plant.

Boiler/Turbine/BOP Commissioning Activity: - Knowledge of activities like Pre-Commissioning checks, Chemical Boil out, Hydro test & Steam blowing, ESP GD test, Furnace Air leak test, Furnace balance test, Refractory dry out, Boiler Air Distribution Test, Fan Lube oil flushing, ID/FD/PA fan commissioning, Fuel Firing Equipment. Bed material charging, Furnace Bed air Distribution test, Coal mill/Coal feeder commissioning, Coal mill clean air flow test. Condensate System, CW, CCW, Feed Water system flushing, HP/LP bypass operation & Equipment Commissioning.

Interlock & Protection checking with required modification and implementation of Boiler & Turbine.

Working experience in Reheat, condensing and regenerative steam turbine.

Work with Safety aspect, with Permit to Work (PTW), and follow up and Release Equipment with tagging and LOTO Implementation, Monitoring safety aspects of maintenance jobs being carried out during shutdown.

Maintain and improve Plant Performance Parameters -Heat Rate/Aux. Power/Availability/PLF/Reliability.

Always maintain operation related activities including Logbooks, Check List, Shift Routines, PTWs, and Logic Forcing Register etc.

Protection of Environment and operating the Plant within the permissible emission norms.

ESP (Electrostatic Precipitator) Operation and maintaining Particulate and environment norms.

Handling Electrical Switchgear and Switchyard operation, Bus changeover, breaker operation and emergency handling.

Working knowledge in Front & Rear Burner Combustion system/Tangential firing & Dry Low NOx Burner system.

Implement and Maintain - 5S and (IMS) Integrated Management Systems and ISO Monitoring 14001 and 9001 and OHSAS-18001.

Certified as “Authorized Person” & “Responsible person” for PTW(LOTO) & SAP system by current organization.

CCPP & GAS TURBINE & HRSG(WHRB) RESPONSIBILITY: -

Hands on experience in combined cycle power plant – HRSG + Gas Turbine GE-7EA, 6FA, 9FA and Siemens V94.2 control room operation & commissioning experience.

Hands on control room operation experience combined cycle power plant of 205MW - (125mw Gas Turbine SiemensV94.2 +80mw STG-BHEL)/ 450MW (2X225MW) (4x75MW Gas Turbine + 4x38MWHRSG). Gas turbine (GE GTG – 6FA)/ 1128MW(3X376MW) (12x60MWGas Turbine + 12x34MWHRSG + 3x136 MW STG). Gas turbine (GE GTG - 7EA).

Working knowledge about all gas turbine auxiliary equipment’s and its operations.

GT ONLINE and Off-Line water wash procedures.

Knowledge about startup and shutdown sequence of GT in simple cycle & combined cycle.

Safe reliable efficient operation of Gas Turbine, STG & HRSG startup & shut down. Interlock & protection checking and modification implementing.

Commissioning of gas turbine, steam turbine, HRSG, HP/LP drum, Air Cooled Condenser, Condensate, Feed water system, CCW system & other BOP equipment’s, chemical cleaning, steam blowing, lube oil flushing, (BFP, Steam Turbine).

Dual fuel gas turbine changeover and base load and preselect load operation.

Maintaining the gas turbine & HRSG (WHRB), combined cycle plant performance parameters.

Renewable (Wind, Solar)/Nuclear (TG) job & responsibility:

Worked as a Lead Site In charge. Maintained of WEC Operation, performance of total 45 no of WEC-E53 (840KW/WEC) - 38MW.

Knowledge & certification in the Solar power Operation & Maintenance.

Worked in 2x700MW TG commissioning of nuclear power. NPCIL (Nuclear power Corporation of India, KAKRAPAR, Gujrat. Its IPHWR-700 (Indian Pressurized Heavy Water Reactor-700).

Educational Qualification: -

Pursuing- MBA-Power Management from UPES institute Dehradun. India-(2022-24)

B.E. (Mechanical Engineering) from Govt. Eng. Collage (S.A.T.I. Vidisha M.P. India) R.G.P.V University Bhopal M.P. India with 66.75% marks in 2008.

Intermediate from Govt. School of (PAGANVICI, Gwalior M.P. India) M.P. Board Bhopal with 58.80% marks in 2003.

High School from (Rameshwar H.S. School Bhind M.P.), M.P. Board Bhopal with 73.20% marks in 2001.

TRAINING & CERTIFICATION: -

Certification of “Certified Clean (Renewable)Energy Professional” from authorized institute by (Govt of India).

Solar power Operation & Maintenance by NIELIT approved by (Govt of India).

Industrial training in Steel Authority of India Limited (SAIL) Bhilai. (C.G.) INDIA

CAD/CAM(IDEAS) by Center for Research & Industrial Staff Performance (CRISP), Bhopal (M.P.) INDIA

Industrial training in Bharat Heavy Electrical Limited (BHEL) Bhopal (M.P), INDIA.

EXTRA-CURRICULAR ACTIVITIES: -

Participated in ASHOK UTSAV, NATIONAL LEVEL TECHNO SYMPOSIUM in college level.

Participated in NATIONAL LEVEL (BHARTIYA VIGYAN SAMMELAN) Bhopal M.P.

Major Project: - Automatic moving headlight in 4-wheeler.

Minor Project: - Prediction of gear tooth breaks by acoustic emission.

Soft. Skills: - AutoCAD, CNC Programming, Catia, PRO-E, IDEAS (CAD/CAM),

PERSONAL PROFILE: -

Date of Birth : 20 Feb 1985

Current Address : Sihanoukville, Cambodia.

Permanent Address : Yadunath Nagar Street-6 Bhind M.P. (477001).INDIA

Languages Known : English and Hindi

Passport no : Z6817005 Valid till (05/06/2032)

Nationality : Indian

DECLARATION: -

I hereby declare that the information furnished above is true to the best of my knowledge.

Place: - BHIND (M.P.) INDIA.

APPLICANT

(SANJEEV MEHROTRA)



Contact this candidate