Post Job Free
Sign in

Aramco Piping Engineer

Location:
Al Dafna, Qatar
Posted:
March 16, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

Name: SHIMNAS V P

Contact No. +974-********

Doha-Qatar

Email: *********@*****.***

PROFILE SUMMARY

Indian origin; Mechanical Piping / Pipeline Engineer, B Tech holder with 13+ years of experience in different aspects of including Mechanical, Piping, Pipeline, Steel structural, Oil & Gas and STP at Middle East, and South India. JOB OBJECTIVES

Challenging and rewarding career with lot of professional growth in a globally competitive working environment having good communication skill and ability to complete assigned project and work as per schedule to upgrade as per new innovations.

CAREER SUMMARY

B Tech in Mechanical engineering, with 13+ years’ experience as a Mechanical Engineer, in GCC and India for various projects in oil & gas field.

Strong interpersonal, team working and leadership skills, an effective communicator with excellent relationship, management skills and strong analytical, problem solving and organizational abilities.

Experienced in Piping and Pipeline construction.

Strong personal computer skills with experience in the MS Office suite of applications and engineering applications such as AutoCAD

Knowledge of international piping codes and standards ASME, ASTM, API, etc.

Strong interpersonal, team working and leadership skills, an effective communicator with excellent relationship, management skills and strong analytical, problem solving and organizational abilities.

Experienced in equipment erection.

SKILLS

Strong cost and risk based analysis

Ability to work to tight deadlines and manage /priorities workloads

Ability to work under pressure.

Ability to adapt and challenge

Project management and supervision

Decision making ability and leadership

Strong interpersonal communications skill

CURRICULUM VITAE

Team managing capability and leadership skill

Analytical and problem solving ability

Good listener

Quick leaner

Database : Microsoft Access

Office Tools: MS Office, MS Project, CAD

EDUCATIONAL QUALIFICATION

BTECH IN MECHANICAL ENGINEERING (2006 – 2010)

PLUS TWO (SCIENCE) ( 2004 – 2006)

SSLC (2004)

EXPERIENCE SUMMARY

1. PROJECT NAME : EPIC FOR COMMON COOLING SEAWATER SYSTEM PHASE-3 PROJECT

(RASLAFFAN), QATAR FROM 2021 JULY (AT PRESENT)

SCOPE OF WORK: MECHANICAL

POSITION: MECHANICAL /PIPING ENGINEER

COMPANY: HYUNDAI ROTEM EPC

CLIENT: QATARENERGY

PROJECT MANAGEMENT/ CONSULATANT: QATARENERGY

2. PROJECT NAME : Al DHAKHIRA WWTP PLANT, QATAR (SEPTEMBER 2016 - JUNE 2021) DURATION 5 Years

SCOPE OF WORK: MECHANICAL

POSITION: PIPING/ PIPIELINE ENGINEER

COMPANY: HYUNDAI ROTEM (EPC)

CLIENT: ASHGHAL (PUBLIC WORK AUTHORITY)

PROJECT MANAGEMENT/ CONSULATANT: WSP

3. PROJECT NAME :MAADEN MINE & REFINERY KSA (JULY 2012 - JULY 2016) DURATION 4 YEARS

SCOPE OF WORK: MECHANICAL

POSITION: PIPELINE ENGINEER

COMPANY: NASSER S. AL HAJRI CORPORATION

CLIENT: ARAMCO/ MAADEN ALUMINIUM COMPANY (KSA GOV.) CONSULTANT: ARAMCO/ MAADEN

4. PROJECT NAME : RAZ AL KHAIR POWER PLANT PROJECT KSA (NOVEMBER 2010 - JUNE 2012) DURATION 2 YEARS

SCOPE OF WORK: MECHANICAL CONSTRUCTION

POSITION: PIPING ENGINEER

COMPANY: NASSER S. AL HAJRI CORPORATION

CLIENT: ARAMCO/ SWCC (SALINE WATER CONSERVATION CORPORATION) KSA GOV CONSULTANT: POIRY

CURRICULUM VITAE

5. PROJECT NAME: KKBMPL (KOCHI KOOTTANAD BANGLORE MANGLORE PIPE LINE PROJECT INDIA (JULY 2010 – NOVEMBER 2010)

SCOPE OF WORK: CROSS COUNTRY PIPE LINE

POSITION: MECHANICAL ENGINEER

COMPANY: GULF ENGINEERS AND CONTRACTORS

CLIENT: GAIL (GAS AUTHORITY OF INDIA LIMITED)

CONSULTANT: BEREAU VERITAS.

DUTIES AND RESPONSIBILITIES AS PIPING ENGINEER

Review of project specification and P & ID’s.

Handling all piping technical queries and resolves all field pipes work related problems, including the drawings of field sketches when necessary.

Coordinating with Engineering and Construction and liaise with Contractor on detail engineering requirements.

Develop Construction Engineering Technology in line with Company Policy and Procedures.

Elaborates construction feasibility analysis evaluating the available material and drawings.

Raising (FWR) Field Warehouse Request for all materials required at site based on the progress of work.

Responsible for piping erection and pipe support installation based on the priority and availability of construction drawings and materials.

Ensure the productivity and quality is maintained by subordinates. Coordinate with other disciplines in site.

Monitor and verify the daily progress report.

Attend daily construction meetings at site to convey the management targets.

Assist Engineering department to solving piping modification and technical problems in field.

Preparation of construction Method Statement & risk factors analysis (MS &JSA) associated with the job.

Based on the ITP (Inspection Test Plan) raise the RFI (Request for Inspection) as required on site.

Check the packing list by Vendor prior to delivery of Vendor materials.

Preparation of “AS BUILT” drawings.

Identification of loop for U/G lines for the final leak test, after the erection of riser spools.

Support in the preparation of test packages based on piping system, including system limit on P & ID and piping isometrics.

Conduct line walk down prior to release of test packs. CURRICULUM VITAE

Attend test pack meetings, to discuss daily & weekly targets with the planning department.

Responsible for carrying out Mechanical clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and pre-commissioning requirement for the project.

Ensure that hydro test reinstatement is to be done as per procedure.

Ensure the safety at site during testing.

Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of Piping / Mechanical Walk Down.

Ensure that all punch list items are resolved before client handover is satisfactorily concluded and that there is no prolongation of project.

Coordinate inspection with Vendor during equipment erection and final box-up of piping with rotary equipments

Monitor the weld repair rates and take necessary steps to control repair rate, to maintain it in the acceptance limit

ACHIEVEMENTS IN PIPING CONSTRUCTION

Construction of RO plant for the plant Boiler Feed Water System. Fire water system and its underground network.

Coordinating successful testing for major & lengthiest lines in the project in minimum time and cost.

Piping construction of compressor unit.

Piping construction of Naphtha pump pit and Tank connections.

Given the valuable suggestions for the piping construction of loading Berths.

DUTIES AND RESPONSIBILITIES AS PIPELINE ENGINEER

Preparation of construction method statements, procedures and risk assessment for concern activities.

Coordinating with Contractor Engineers regarding daily progress and issues at site.

Coordinating qualifications with QC department for Welding, Welders, Bending, Coating and Wrapping.

Issuing the permits & attending daily toolbox on site.

Attending weekly progress meetings.

Monitor and Control the site activates. Right of Way (ROW), Stringing, Bending, Welding, Coating, Tie-in, Backfilling, and Berming & Marker post installation. CURRICULUM VITAE

Monitoring welding progress and its day to day NDT activities.

Monitor the weld repair rates and take necessary steps to control repair rate, to maintain it in the acceptance limit.

Resolve safety issues on site coordinating with the HSE department.

Coordinate release of pipe sections for crossings.

Coordinate release for lowering pipe sections and backfilling.

Obtain the approval (NOC) for major Road & RIG crossings, Corridor crossings and Fence crossings from concern Owners or Client Company.

Attend the line walk down with Contractor and End-user and coordinate the punch list closing.

Attend the NCR close out meetings and take necessary steps to close the NCR’s.

Resolve unexpected technical issues on site.

Prepare of lifting plan for heavy & tandem lifting (lowering of loops) across the existing live lines and its approval from the company.

Construction of Subka Pad as per the project specification.

Coordinate the final Tie-in’s with existing lines during shutdown.

Coordinate the interface issues with other EPC contractors & their Sub- contractors.

Solve and correct the Audit findings.

After completion of the line support QC & DCG (Document Control) departments for submission of Mechanical Completion Dossier.

Monitoring, time sheet review and control of hired equipments and manpower. ACHIEVEMENTS IN PIPELINE CONSTRUCTION

Overall experience in construction of 165.km Above Ground Flow Lines, 205.km of Underground Flow Lines and 195.km MOL & Trunk Lines.

Successful construction of 461 crossings for RIG, Track, Road, Corridor and Fence crossings.

Coordinating successful completion of 41 HDD crossings.

Coordinated successful bending qualification for 90 bend on 3” pipe and 45 bend on 6” pipe, since bending angle exceeds the project specification limit.

Successful completion of 24” pipelines plant approach.

Had a good achievement in coordinating the interface issues at plant approach with other EPC contractor

Being close to Management, I supported my workers to fulfill their needs. Which help me to achieve my targets on time.

CURRICULUM VITAE

PERSONAL INFORMATION

Name : SHIMNAS VP

Date of Birth : 25/02/1987

Passport : V4016486

Visa Type : Residence

Driving license : Available

Nationality : Indian

Languages known : English, Malayalam, Hindi, Tamil, Arabic Gender : Male

Family Status : Married

Contact Number : +974-********

Email Id : *********@*****.***

DECLARATION

I hereby declare that all the information furnished above is correct and true to the best of my knowledge.

Place: Doha Yours Faithfully,

Date:

SHIMNAS VP



Contact this candidate