JUSTIN IZARD
Austin, TX - PHONE 737-***-****
***********@*****.***
OBJECTIVE
To obtain a position that will allow me to apply my twenty-two (22) years of project management, quality assurance, procurement, and program implementation. This would pertain to petroleum applications, semiconductor, life science, biotech, and heavy construction industry. SKILLS
• Competent ability to multitask and prioritize work to meet forecasted daily accomplishments.
• Ability to distribute tasks appropriately as per experience with field support, mechanical, installation, inspection, and commissioning (CX).
• Extensive knowledge of advanced welding processes, procedures, and qualifications.
• Proficient in interpreting various related codes such as ASME B31.3, B31.1 and section IX.
• Experienced in writing procedures for mechanical installation, pressure testing and welding applications. appl
• Extensive knowledge working through complex construction sites both domestic and international. Pertaining to rigid schedules and maintaining project milestones while managing procurement of equipment to arrive within predetermined shipping scheduled date as on-site progression authorizes.
• Monitor a team of Procurement Managers and provide instructions accordingly.
• Develop long-range strategic sourcing plans and milestones.
• Skillful with Microsoft word, Excel, Power B-I, Power Point, and outlook. EXPERIENCE
November 2018-November 2022 FPI-BECHTEL/JE DUNN
Quality Construction Field Engineer Site Manager Mechanical & Electrical / Commissioning Engineer III
• CX commissioning engineer III for equipment and instruments installed for Intel OR., Amgen PR. and Genentech CA.
• Prepared all client turnover packages based on installation and qualification documentation per client specifications and industry standards.
• Served as a liaison between the client, contractor and all associated vendors pertaining to equipment deliveries.
• Ensured all work is performed to documented procedures, all applicable codes and client standard operating procedures (S.O.P.’s).
• Planned, Coordinated, and verified pneumatic and hydrostatic pressure testing.
• Provided procurement support and reported all progress daily with client and associated contractors.
• Compiled Welding Procedure Specifications (W.P.S), Procedure Qualification Records (P.Q.R.) and Welder Performance Qualifications (W.P.Q.) for accuracy and section IX compliance.
• Interpreted radiographic film and knowledgeable with all other nondestructive testing (NDT) processes.
• Scheduled all NDT per code/client requirements prior to system acceptance and pressure testing for all process piping in selected boundaries per approved P&ID’s.
• Ensured all pre/post heat treatment for Chrome systems along with all NDT requirements, scheduling and maintaining all traceability for complete system compliance.
• Performed weld inspection per applicable code requirements for carbon, stainless and chrome piping systems.
• Successfully passed all audits performed by client contracted third party government services randomly visiting throughout the construction of power plants I managed. This was to ensure accurate traceability, documentation, X-Ray, Brinell, Die Penetrant, all applicable code compliance and percentage complete per generator.
• Installed critical piping systems from 36” hot chrome to 3” carbon piping systems and validated each system separately per company contract.
Cricket Valley (Dover Plains, NY)
Global Foundries (Malta, NY)
Intel (Hillsboro, OR)
March 2014-November 2018 Brandt Engineering
Quality Assurance Engineer / Project Superintendent / Mechanical Field Engineer
• Originated their processes and procedures for the hygienic division of Brandt Companies for Global Foundries in New York.
• Prepared all Allergan (UD & MD) systems close out packages based on installation and qualification documentation per cGMP requirements and client specification requirements.
• Practiced and instructed co-workers in our division to follow cGMP practices compliant as per Bio Processing Equipment (BPE) standards.
• Functioned as a liaison between the client, contractor, and vendors to ensure projects would maintain schedule, hit milestones and quality requirements were achieved.
• Planned, Coordinate, and verified pneumatic and hydrostatic testing of multiple systems within required boundaries all with many different testing parameters.
• Provided procurement support for all critical equipment orders mainly with long lead times with extremely strict schedules.
• Created Welding Procedure Specifications (W.P.S), Procedure Qualification Records (P.Q.R.), and Welder Performance Qualifications (W.P.Q.) for accuracy along with section IX compliance for many complex welding processes.
• Reviewed and interpreted film along with pre/post treatment graphs for correct temperatures and durations for different material types and wall thickness.
• Purchased and received materials per system specifications and client job requirements.
• Project Superintendent for Texas Instruments (TI) R Fab to guarantee milestones, installation, testing, and fabrication were complying to client specifications.
• D1.1 structural inspection for multi-family, commercial, and hospital buildings to ensure code conformity and review all applicable drawings to verify material accuracy and redlined P&IDs for “As Built” submission.
Global Foundries (Malta, NY)
Samsung Austin Semiconductor (Austin, TX)
Allergan (Waco, TX)
Dr. Reddy (Shreveport, LA)
Mary Kay (Carrollton, TX)
March 2009-February 2014 Total Facility Solutions
Quality Assurance Manager / Vendor Surveillance Manager (Central U.S. and Mexico)
• Installation of Liquide Natural Gas (LNG) fill stations for Clean Energy starting from Lerado, TX throughout central U.S.
• Six years factory acceptance testing (F.A.T.) vessel and skid inspections domestic and international prior to shipping from fabricator to oil and gas and bio-pharmaceutical end users with ZERO nonconformance. All vessels were verified against approved drawings, reviewed shop traveler, materials of construction, nozzle location and orientations, self-cleaning testing
(CIP), welding procedure & qualifications, hydrostatic testing, and U-1 form verification to ensure client product compliance per contract. This included vessels measuring 20,000 L. to mixing/day tanks in both stainless and carbon steel applications.
• Reviewed welding processes and provided recommendations for improvements.
• Prepared all client turnover packages based on installation and qualification documentation per cGMP requirements and client specifications.
• Served as a liaison between the client, contractor and all vendors associated with suppling equipment for assigned projects and construction milestones.
• Reviewed Welding Procedure Specifications (W.P.S), Procedure Qualification Records (P.Q.R.), and Welder Performance Qualifications (W.P.Q.) for accuracy and section IX compliance.
• Performed P&ID verification to ensure accurate “as-built” conditions are reflected for field piping to match to prefabricated equipment arriving for install.
• Verified all installation procedures were followed throughout the duration of the project and system start up.
• Performing audits of vendors producing ultra-high purity gas system modules, tracking, and procurement of equipment shipping to Leon Junto Mexico, Finland, and Sweden. Samsung Austin Semiconductor (Austin, TX)
Beiersdorf (Leon, Mexico)
Global Foundries (Malta, NY)
Intel (Phoenix, AZ)
Intel (Albuquerque, NM)
Intel (San Jose, CA)
Jacobs Engineering (Worldwide)
CERTIFICATIONS
• CWI, AWS D1.1 Certified Welding Inspector # 14060901
• CWI, API 1104 Certified Welding Inspector
• ACCP Level II Visual and Optical Testing Inspector #141937
• General Industry/Pressure Equipment (GI; PE)
• ASNT SNT-TC-1A Level II Visual Testing Inspector
• ASNT SNT-YC-1A Level II Mass Spectrometer Leak Testing Inspector
• Toxic Gas Ordinance Training, Intel Santa Clara, CA
• Certified Thermoplastics Welding Inspector
• Positive Material Identification certified (PMI)
• OSHA 10 Certified
• CPR Certified