SONNY FERNANDEZ ROMERO
Blk *** Lot * Brgy Sta Lucia Dasmarinas Cavite
091********/ +634******** whastapp: +971*********/ 091******** I *****************@*****.*** OBJECTIVE
Seeking for an offshore or landbase Welder fabricator fitter position at your company using fitness in working on construction project and employing hands on experience related to welding and fabrication procedure. In dept of knowledge methods, symbol and safety practice.
EXPERIENCE
SEAFOX
Welder Fitter
o Qatar Oil Rig
o Maintenance Welding
o Jack Up barge DEEMA
Duties:
Replace the old pipe water line.
Welding modified acetylene & oxygen rack for lifting.
Cutting and welding platforms for the jack up barge.
Making spool peace for sea water line
Repair and replacement the old handrill
Welding modified flange for sea water line
Replacement the old and welding gratings
Welding support for crane
Replacement old submersible for sea water
Making support stand for engine machine
Maintenance welding and replace all damaged in engine room.
Repair welding cracked of engine machine
Welding for sea wage tank
Rey Tech Construction & Development Corporation
Welder / Fabricator Fitter
o Welding and fabrication area
o Welding the steel trashed
o Welding and cutting the beam for making pad eye
o Welding support beam and clean by grinding all the beam o Welding structural plate beam and pipe
o Welding and modified the anchor for replace the old on ship. March 2021–
September
30, 2022
October 20,
2022 – up to
present
Valentine Maritime Gulf Limited
Welder / Fabricator Fitter
PROJECTS
Valentine Maritime Gulf LLC
January 2021- March 2021
On board DLB 1600
Project # Heavy lifting Jacket Installation
ONGC
o Welding and heavy lifting
o Working in fabrication area
o Preparation for replace leg jacket
o Welding and join the pipe
o Drilling and hammering the pipe for the install jacket o Direct welding pad eye to the pipe both side for lifting o Heating the pipe before starting the welding
o We using electric belt heating
o Welding the pipe for joining
o When finish welding grinding the connection
o Clean by grinder all the welding
Valentine Maritime Gulf LLC
July 2020 - November 2020
Project # Fabrication yard area workshop
Preparation Welding procedures
Beam, anchor boyar
Musaffah Abu Dhabi UAE
o Welding procedure 12.75 9.53mm
o Main pipeline 7 kilometers to replace old
o We using welding rode 7010 for root, hot pass and capping. o Welding pipe rack and supports for the pipe
Valentine Maritime Gulf LLC
November 2019- May 2020
Automatic pipeline welder Onboard DLB1600
Project # KGOC-Gas & Condensate Export System
Welding of 12.75"x9.53mm - Main Pipeline MC 300(VMGL-Abu Dhabi o Welding and cutting the spool Pease for riser and beam o Prepare for the test pipe cut by cutting torch
o Welding for pick up pipe and welding both side pix Pad eye o Grinding all pipe procedures making beveled
o Welding test pipe 6"8"18inch
o Clean properly the bevel3 and cover by tape
Valentine Maritime Gulf LLC
November 7,2016 - January 15,2017
Automatic Pipeline welder Onboard Regina-250
Project # C1602
ADOC TR-5898
6",8" & 18 Gas Lift Line
Surface Facilities of Hail Field Development
2002-
December
2020
Mubarraz Field, UAE
o Welding automatic by gmaw double torch
o Replace the old pipeline 48inch sea water line
o Replace pipeline 36"26"18"14 pipe gas line
o 7 km, 26kkm from shore to offshore
o Preparation cargo barge welding all support
o Seapasinin all the material and crane welding and putting Pad eye
Valentine Maritime Gulf LLC
October 10,2015-2016
Automatic Pipeline welder/fitter
Automatic pipeline welder Onboard DB1600
Project# Dubai Petroleum
48" Crude and Sea Water Outfall Pipeline Project
48" 36" 26" 18" 14" Pipe inch Gas Pipeline
Dubai Field
o Working in fabrication area
o Cutting the pipe 26"14inch
o We using cutting torch with traveling band semi-automatic o Cut the steel plate 20 to 30 mm for making Pad eye
Valentine Maritime Gulf LLC
Automatic Pipeline Welder Onboard Regina-250
Project # Gas Pipeline
26" 14"
o Welding test pipe 10inch
o For procedure
o We are using welding FCAW for making jacket legs for offshore. o Replace the old jacket legs 70 inch
o We welding FCAW root hot pass filling up to capping o Welding and cutting pipe test
o Size of the pipe 6"8"10"12"14"16inch
o Replacement and modification
Valentine Maritime Gulf LLC
March 13,2013
FCAW-S Test Pipe 10"x14mm W/T Semi-Automatic
Jacket Installation
o Welding riser, tie inn pipe support to the jacket legs o Preparing for cargo barge and welding or secure
o Welding pad eye and beam to support the equipment and materials. o Welding beam pad eye or sea pasining crane and pipe rack
Valentine Maritime Gulf LLC
October 11 - May 15,2012
Automatic pipeline welder Onboard Regina-250
Project # C1004
ONGC
6", 8" 10", 12" 14" & 16 Gas Lift Line
B-46 Series, N-15 &N-16 Pipelines and Modification o Welding automatic and manual pipeline
o Installation oil pipe line 24" x 12.7 mm
o Welding by GMAW automatic and SMAW
o We are using welding rode MIG 80n1 and 8010,7016,7018 o Clean properly the test pipe using by grinder file and acetone
Valentine Maritime Gulf LLC
October 10 2010 - March 22,2011
Automatic pipeline welder onboard Regina-250
Project # C9007
ONGC
10",12"14"& 16" Gas lift Line
MHN Pipelines and Modification
o Welding pipeline installation subsea oil
o We welding by automatic GMAW by traveling band
o Welding rode 80ni size or diameter pipe 24"x12.7mm o Fabricate sleeper under the sea.
o Welding beam for support for pipeline
o Lifting the modified beam and dropped to the sea base
Valentine Maritime Gulf LLC
June 18 - July 10,2009
Automatic pipeline welder onboard Regina-250
Project # C 0902
SEPEHR-ROSEMOND ENGINEERING & CONST. CO.
Pipelines- 24" x 12.7 mm. w.t
Installation of Aboozar A9 to AA New 24" Subsea Oil pipeline o Welding and replace the old pipeline
o Size of pipe 10"x15.9mm
o Welding pipe for tie in, riser and spool peas
o Welding by automatic by GMAW with traveling band o SMAW 7018 using welding rode for root filling and capping o Before welding clean the peas of pipe by bupping or grinding and put acetone by o cotton cloth.
Valentine Maritime Gulf LLC
August 24 - September 15 2008
Automatic pipeline welder onboard Regina-250
Project # C 0803 Contract No. MS A DPE-002459/SA DPE-002460 DUBAI PETROLEUM ESTABLISHMENT
Pipelines - 10" x22.6 mm. w.t.
FATHA O-ZB ro N-B Subsea Water Injection Pipeline Replacement Riser & T-in Spools
Dubai, U.A.E
o Welding pipeline and recovery
o Replace the old pipeline
o Pipeline 26"16"12"8inch
o Working fabrication area
o Welding the buoyancy
o Welding SMB
o Welding support pipe
o Welding anchor gravity
o Coughing the deck
Valentine Maritime Gulf LLC
July 1 2008 - August 15,2008
Automatic pipeline welder onboard Regina-250
Project # C 0707 Contract No. 4600-WB-03-60
R A K PETROLEUM
R A K Petroleum Pipeline Project
Oil Pipeline
Pipelines - 12" x 15.9 mm./17.5 mm. w.t.
West Bukha Platform to Bukha "A" Platform
& Riser
o Prepared and welding cutting the pipe peace
o Cutting plate using by cutting torch with traveling band thickness of plate 20 to o 50mm
o We using cutting torch for plate thickness 20 to 50mm #5 nosil o Plate thickness 15mm #4 nosil
o Plate thickness 10mm #3 nosil
o Plate thickness 2 to
Valentine Maritime Gulf LLC
September 1 - April 30,2008
Automatic pipeline welder onboard Regina-250
Project # C 0407 OFFSHORE OIL COMPANY
Kharg Island Gas Gathering and NGL Recovery Project and Export pipelines - Oil Export Line
Pipelines - 26", 16", 12" & 8"
Valentine Maritime Gulf LLC
December 16 - May 29,2007
Automatic Pipeline Welder Onboard VMGL/DLB-600
Project# C 0605 Reliance Petroleum Limited
Jamnagar Export Refinery
30" Product Export Pipeline & 48" Crude Import Pipeline
Valentine Maritime Gulf LLC
June 17 - October 20,2006
Automatic Pipeline Welder Onboard VMKL/DLB-600
Project # C 0407 OFFSHORE OIL COMPANY
Kharg Island Gas Gathering and NGL Recovery Project and Export Pipelines - Oil Export Line
Pipelines - 26", 24",16",12" & 8"
Valentine Maritime Gulf LLC
February 14 - March 21,2006
Automatic Pipeline Welder Onboard VMML/DBL-600
Project # C 0409 ESSAR OIL REFINERY Limited
48" Crude and Sea Water Outfall Pipeline Project
Valentine Maritime Gulf LLC
November 28,2005
Automatic Pipeline Welder Onboard Regina-250
Project# HYUNDAI Oil Field
API 5L, Gr. X80 (NACE)
16"X14" 3mm WT
E6010 (Root), E8010-G (Hot, Fill & Cap)
Laren & Tourbo LimitedWelder/Fitter
September 14,2004 - May 8,2005
Project: Living quarter & Power Upradation on PS-2/3 Maydan* Bul Hanine Field
DUTIES &
RESPONSIBILITIES
Clean Weld joint or work piece using wire brush, portable grinder, or chemical bath.
Preheat work piece before welding using hand touch or heating fumace.
Full welding of pipe line on top pipe rack, carbon steel and stainless steel.
Repair broken or cracked parts and fills holes.
Prepare broken parts for welding by grooving of scarfing surface.
Position and clamps work piece them in jig or fixture.
Full Welding of carbon / steel pipe rack on NGL 4 expansion.
I'm working during shutdowns, full welding of new replacement pipe line.
Weld using ER 70S-3 for root pass and hot pass, E7016 filling and capping with 100% R.T
Assist to pipe fitter for act welding
Chips off excess weld, slag and spatter, using hand scrapper or power chipper.
Weld pipe line gas in offshore by GMAW automatic downhill 5g.
Station 1 root by dual torch root and hot pass.
Station 2 weld by same machine first filling.
Station 3 to weld last filling.
Station 4 to weld same machine last pass by capping.
Making sand blast by automatic sand blast machine.
Free heat the pipe after sand blasting and to put cover by rubber.
After to put the last metal shield and put the foam chemicals before to lay down in the
sea base
SKILLS
Equipment Handled
GMAW Automatic / Semi Automatic Vermat Automatic Welding Machine
Fcaw - Semi Automatic Welding Machine
-SMAW - Miller Welding Machine
Onshore Construction
Pipe Laying
Erection
Pre Commissioning
Offshore Construction
Pipe Laying
Jacket Installation
Hook-Up
Platform Installation
SBM & SPM Installation
Inspection Survey
TOLLS &
EQUIPMENT USED
WELDING TEST TRAINING
SMAW
GMAW
FCAW
MIG
WELDING MACHINE USING
Millet
Diesel welding machine
Automatic welding machine
Vermaat machine
WELDING USING
welding helmet
safety glass
safety helmet
safety gloves
welding rode
role wire, stick wire
7010,8010,6010,7016,8018,80ni
Grinder
Chipping hammer
Chipping gun
Wire brush
FABRICATION TOOLS EQUIPMENTS
Cutting torch fool set
Gas
Oxygen
Nosil #1#2#3#4#5
Lighter
Meter
Chalks tone
Center punch
Hammer
Traveling round band
Traveling rail
Paper meter
Grinder
Roop marker line
Spanner
WELDING TEST &
TRAINING CERTIFICATION
Shielded Metal ARC Welding (SMAW) NCII – June 24,2022 – June 23,2027
Basic Training
Survival Crafts and Rescue Boats other than Fast Rescue Boats
Tropical Basic Offshore Safety Induction & Emergency Training (T-BOISET) – Oct 25,2022
– Oct 24, 2026 (OPITO APPROVED)
Basic H2S (OPITO APPROVED) – Oct 24,2022 – Oct 6, 2024
111-Metal-arc Welding (SMAW) - Manual June 11,2006
131 - Metal-arc inert gas welding (GMAW) - Automatic June 13,2006
111-Metal-arc welding (SMAW) - Manual November 23, 2006
111-Metal-arc welding (SMAW) - Manual March 13,2005
"Basic Fire Fighting" November 17,2009
"One Day Course - Sea Survival" July 1, 2008
EDUCATION
Secondary School Graduate
Philippines Law Lacson College
ADDITIONAL
INFORMATION
Passport No. P5676265B
Date Issued: 23 OCT 2020
Date expiration : 22 OCT 2030
Issued : Abu Dhabi UAE
I hereby certify that all information stated above are true and correct. SONNY FERNANDEZ ROMERO
(Applicant Signature)
1991 –
1995