SKILLS & KNOW HOW

GOOD INTERPERSONAL AND COMMUNICATION SKILLS.

THE ABILITY TO WORK WELL UNDER PRESSURE

PREPARATION, REVIEW AND APPROVAL OF PROJECT SPECIFIC ITPS / QUALITY PLANS / SYSTEM PROCEDURES.

MONITORING AND SUPERVISE HYDROSTATIC AND PNEUMATIC TESTING OF PRESSURE VESSELS.

HSSE KNOWLEDGE AND COMMITMENT.

INTERNATIONAL STANDARDS: API, GPSA, ASTM, ASME, ISO

COMMISSIONING FOLDER.

PROCESS DESIGN

MECHANICAL COMPLETION FOLDER.

GOOD KNOWLEDGE OF PROJECT MANAGEMENT.

EXPERIENCED IN A VARIETY OF ROLES AND RESPONSIBILITIES; COMMISSIONING ENGINEER, COMPLETION ENGINEER, PROJECT ENGINEER, PROJECT COORDINATOR WITH QA/QC TEAM AND JUNIOR DESIGN PROCESS ENGINEER.

OIL & GAS EXPERIENCE IN PROJECT MANAGEMENT AND QUALITY ASSURANCE/ QUALITY CONTROL.

GOOD KNOWLEDGE OF SAFETY REQUIREMENTS.

PRE-COMMISSIONING, COMMISSIONING AND START-UP ACTIVITIES.

PREPARATION OF PRE-COMMISSIONING, COMMISSIONING AND START-UP TECHNICAL DOCUMENTS.

TEAM MANAGEMENT/JOB PLANING.

ELABORATION OF TECHNICAL & COMMERCIAL OFFERS.

WELL COORDINATION AND SUPERVISION DURING SIMOPS ACTIVITIES. SOUMAYA BELLAR

PROJECT ENGINEER / FIELD ENGINEER

+216******** advvs6@r.postjobfree.com Soumaya Bellar I am a Chemical Process engineer with a basic

knowledge in the oil and gas sector. I am also

experienced in coordinating and project management. Team working, problem solving, drive and enthusiasm are the qualities i cherish.

2

TRAINING:

QUALITY MANAGEMENT ISO 9001 CERTIFICATION

ENVIRONMENTAL MANAGEMENT ISO 14001 CERTIFICATION

HEALTH AND SAFETY MANAGEMENT OHSAS 45001 CERTIFICATION

FIRST AID TRAINING- NTC FORMATION.

FIRE FIGHTING- NTC FORMATION.

POSTGRADUATE CERTIFICATE IN PETROLEUM ENGINEERING –TUNISIAN AMERICAN OIL AND GAS INSTITUTE (TAC)

EDUCATIONAL HISTORY

2019 - National Engineering Diploma in Chemical Process Engineering. NATIONAL ENGINEERING SCHOOL OF GABES (ENIG)

2016 - Preparatory cycle to engineering studies – Physics-Chemistry TUNIS PREPARATORY ENGINEERING INSTITUTE (IPEIT).

2014 - High School diploma in Experimental science- IBN EL JAZZAR HIGH SCHOOL KAIROUAN- TUNISIA WORK EXPERIENCE

2023:

Project:

ACOUSTIC EMISSION CONTROL SERVICE OF SIX (06) GPL SPHERES OF THE NEW SNDP DEPOT SIS IN GABES

Location: SNDP DEPOT- GABES

Client: National Oil Distribution Company AGIL

Contractor: PEPCCO/TIC/CETIM

Position: Project Manager

Project description:

Performing, coordination and supervision of the Pressurization test:

Installation of a nitrogen injection plant, consisting in particular of certified LN2 storage units, including a decompression cell (coil), equipped with all the instruments necessary to carry out the necessary controls.

Supply of the Nitrogen necessary for carrying out the pressurization according to the procedure.

Nitrogen injection and pressurization according to the specified pressurization cycle.

Test monitoring and preparation of necessary test packs. 3

2022:

Project: DEVELOPMENT OF OPERATING MANUALS AND MOPO FOR TSIENGUI, TRCP, OBANGUE AND RABI.

Location: Operation facilities: Tsiengui, Obangue, TRCP and Rabi. Client: Addax Petroleum Oil and Gas Gabon (APOGG), Contractor: PEPCCO

Position: Project Engineer

Project description:

Development of operating manuals and a manual of permitted operations matrix (MOPO) for the operation facilities as fellow:

1- Tsiengui Oil Field: including the CPF, the PADs and different pipelines 2- Tsiengui Reciprocating Compression Project – TRCP 3- Obangue Oil Field: including the CPF, the PADs and different pipelines (Update only) 4- RABI: pumping station

Project: Line Heater#2 Re-certification

Location: WAHA CPF-TATAOUINE

Client: OMV (Tunisian) Production GmbH

Position: QA/QC Engineer

Project description:

Performing, coordination and supervision of the following tasks:

Supply of necessary tools and fittings

Erection/Dismantling of scaffolding

Gas Freeing

Vessel Positive Isolation

Vessel opening and instrument removal

Vessel Cleaning

remove vessel insulation

Bundle Extraction

Vessel internal Inspection

Piping cutting and replacement of Coils

Welding

Heat treatment

100% NDT inspection

Piping dismantling, spool fabrication.

NDT

Sandblasting and painting

Coating inspection

Piping erection-pipe support installation

Painting touch up

Hydrotest of vessel’s coils

Bundle re-insertion

Re-instatement and Flange management, re-install insulation and Leak testing

Vessel Inerting

Startup assistance

4

Project: Leak testing of pressure vessels in CHEROUQ concession and ANAGUID concession Location: WAHA-TATAOUINE -TUNISIA

Client: OMV (Tunesian) Production GmbH

Contractor: PEPCCO

Position: Project Manager

Project description:

Performing, coordination and supervision of the following tasks:

Vessels gas freeing,

Vessels positive isolation

Opening vessels to allow the internal cleaning and inspection.

Vessels reinstatement including flange management,

Vessels leak testing.

Project: INTERNAL INSPECTION CAMPAIGN OF NADA-1 JP VESSEL AND CHEROUQ SEPARATORS Location: WAHA-TATAOUINE -TUNISIA

Client: OMV (Tunesian) Production GmbH

Contractor: PEPCCO

Position: project Manager

Project description:

Performing, coordination and supervision of the following tasks:

Gas Freeing

Vessels positive isolation.

Opening vessels to allow internal inspection and Cleaning.

Re-instatement and Flange Management.

Leak testing and inerting

Start-up assistance and handover to the Client production team. 2021:

Project: Special Process Vessels services (Hydro test, Flange Management and Leak Test) during Total Shutdown.

Location: WAHA-TATAOUINE -TUNISIA

Client: OMV (Tunesian) Production GmbH

Contractor: PEPCCO

Position: QA/QC Coordinator

Project description:

Performing, coordination and supervision of the following tasks:

Gas Freeing

Vessels positive isolation.

Dismantling and reinstallation of all vessel’s accessories (instruments, PSV’s...).

Hydrotest, Draining and Drying of Pressure vessels.

Reinstatement and Flange management.

Leak test and inerting of Pressure vessels.

Commissioning and Start up assistance.

5

2020-2021:

Project: Special Process Vessels services (Hydro test, Flange Management and Leak Test). Location: WAHA-TATAOUINE -TUNISIA

Client: OMV (Tunesian) Production GmbH

Contractor: PEPCCO

Position: Project Manager

Project description:

Performing, coordination and supervision of the following tasks:

Hydrotest of 88 pressure vessels.

Re-instatement & Flange management.

Inerting and leak test assistance of 88 pressure vessels.

Commissioning and Start up assistance.

Project: HALK EL MANZEL, CRUDE OIL PROJECT

Position: FIELD-COMMISSIONING ENGINEER

Client: TOPIC LOCATION: JAWHARA 05 PLATFORM HALK EL MANZEL, SOUSSE-TUNISIA TASKS:

Supervision of commissioning team ensuring safe delivery of commissioning targets. Taking systems through mc to dynamic commissioning and on to handover.

Supervising tasks such as alignment checks, dynamic running, no-load/load runs, and line walking and system preparation.

Cold commissioning and first running for the crude oil treatment system.

Commissioning of the water treatment system (pumps running, check set points and operation data).

Commissioning of the flare system and the ignition control panel with CCR feedback.

Commissioning and running of the WHCP unit (wellhead control panel).

Planning and supervising the cause and effect testing.

Preparing procedures and supervising the loop testing according to the control narrative and check feedbacks.

Initiate systems and subsystems definition on PFDS, P&IDS.

Completions & management database.

Prepare check sheets for pre-commissioning & commissioning procedures as per vendor manuals and equipment datasheet.

System and sub-system boundary drawings development and review.

Assist and monitoring the system handovers.

6

Project: Pressure safety valves maintenance, Calibration and repair. Location: FERIANA – KASSERINE – TUNISIA

Client: TIC & SERGAZ

Contractor: PEPCCO

Position: QA/QC Engineer

Project description:

Testing of PSVS as per ASME PTC25.

Calibration of the set pressure.

Seat tightness of PSV’s as per API527.

Repair the defected PSV’S.

PSV’S disassembly/assembly for process.

2019-2020:

Project: NAWARA AND SOUTH TUNISIA GAS DEVELOPMENT

Location : Tiret -TUNISIA

Client : MSBI / OMV

Contractor: PEPCCO

Position: Back office Engineer

Project description:

Nitrogen/Helium leak test of NAWARA Central Process Facility systems, flowlines and wellpads.

Nitrogen purging of Gas and Condensate CPF systems, flowlines and wellpads.