Resume of Contact No: 017**-******
MD. RABIUL SARKER E-Mail: ******************@*****.***
OBJECTIVE: Seeking a challenging position with a dynamic and growth oriented organization where my educational and technical skills and experience will be utilized to their full potential to consolidate my professionals and financial.
PERSONAL BACKGROUND:
Name :MD.RABIUL SARKER
Father’s Name : Md.Sakhawat Hossain
Mather’s Namr :Mrs.Sanwara Hossain
Date of Barth :20/10/1981
Marital Status : Married
Religion : Islam
Nationality : Bangladeshi by birth
Sex : Male
PERMANENT ADDRESS:
Name :Md.Rabiul Sarker
Father’s Name :Md.Sakhawat Hossain
Vill :Charripur
Post :Sirajgonj
P.S :Sirajgonj
Dist :Sirajgonj
MAILING ADDRESS:
Md.Rabiul Sarker
Dr.Md.Monowarul Islam Sarker
House #-26(A-3), Road #-12
Sector #-04,Uttara,Dhaka-1230.
EDUCATIONAL BACK
Secondary School Certificate
Institution :S.B.Railway Colony High School.
Group : Arts.
Year :1998.
Result :2nd Division.
Board :Rajshahi
Diploma-in-Engineering
Institution :Rajshahi Polytechnic Institute
Department : Power.
Year :2001 held in 2002.
Result :2nd Division.
Board : BTEB.
BSC-in-Engineering -EEE
Running
TRAINING:
Two month practical training at Bangladesh railway central locomotive workshop,
parbotipur dinajpur
COMPUTER LITERACY:
Comfortable in Windows environment like Auto cad (2D & 3D), MS Office (MS- Word, MS-Excel,
PowerPoint).
EMPLOYMENT STATUS:
PRESENT JOB EMPLOYMENT STATUS:
Designation : Sr.Operation &Maintenance Engineer Utility (Power Generation
10.3 MW Capacity )
Partex Board Mills Ltd. Partex Holding ltd. Hatabo, Rupgonj,
Narayengonj.
Duration : 01-05-2013 to till now.
JOB RESPONSIBILATIES:
01) Programmable logic control system PLC operation monitoring & controlling system.
02) Turbine smoothly Stare-up such as hot start, cold start & worm up start, smoothly
operation & smoothly shutdown activities etc.
03) Responsibility of plant auxiliary such as ACOP,AOP,MOP,Oil-filter,Oil cooler, Cooling
tower etc.
04) Control of digital 505 wood ward Governor Bentley Nevada, vibration monitoring and
other’s.
05) Maintain of required R.P.M, Excitation Voltage & Current, Synchronizing System &
Load Distribution to grid.
06) Already performed turbine overhauling activities.
07) I have experience about 10.854 MW power plant. This power plant consists of seven gas
generators which name is Modern Power Plant. Two generators are 725 KW, Two
generator are 952 KW, Two generators are 1750 KW,& another one is 4000 KW. I have
also experience in schedule, overhauling & top overhauling smoothly operating,
maintenance, control system in each generator.
08) I have experience about 03 MW power plant. This power plant consists of one gas
generators and two diesel generator which name is MIR Cement Ltd. 02 MW HT
generators and 500KW two diesel generator. I have also experience in schedule, overhauling & top overhauling smoothly operating, maintenance, control system in each generator.
09) LT, HT switch gear and protective device, bus bar trouncing, Auto change over with all
electrical control and maintenance with 11 KV sub-Station control system.
10) Maintain of daily log sheet, Weekly log sheet & monthly log sheet and report.
11) Monitoring and timely activities are undertaken by the Maintenance team with regards to the performance of all machines and equipment including Gas Generator, Diesel Generators, Cooling tower, Fire fitting pump, Boilers, Compressors, Motor, Pumps, Electrical Panel Boards, etc
12) Supervising and assisting in daily and scheduled electrical & mechanical-related maintenance as per specified designs and drawings
13) Implementation of policies, procedures, and practices across the Maintenance team with regard to preventive maintenance of mechanical & electrical systems and equipments
14) Conducting regular internal inspections of all machines and equipment’s.
15) Develop and implement the systems for proper transparent documentary and keeping service records/logs of all day-to-day installations/repairs/maintenance, etc.
PREVIOUS EMPLOYMENT STATES:
01) ORGANIZATION:
Designation : Operation &Maintenance Engineer Turbine (10.5 MW
Capacity Thermal Power Plant)
Partex Energy Ltd. Partex Holding ltd. Hatabo, Rupgonj,
Narayengonj.
Duration : 02-02-2010 to 31-04-2013.
02) ORGANIZATION:
Mir Cement Limited, Mura Para, Gonganagar, Rupgonj, Narayangonj
Designation : Shift In charge ( Generator & Electrical )
Power Generation 03 MW Capacity.
Duration : 02/06/2007 to 30/01/2010.
03) ORGANIZATION:
Moden Poly Industries Limited, PAB Road. Char Partharghata,
Karnafully, Chittagong.
Designation : Assistant Engineer ( Generator & Electrical )
Power Generation 10.854 MW Capacity.
Duration : 22/08/2003 to 30/05/2007.
04) ORGANIZATION:
Universal Trading & Construction Ltd. ( UTCL )
Designation : Sub Assistant Engineer.
Duration : 01/06/2002 to 15/08/2003.
Md. Rabiul Sarker
Date : 22.02.2023