APPLY FOR POSITION : Technical Officer
NAME OF STAFF : Mr. Binaya Krishna Shrestha
DATE OF BIRTH : July 6, 1974
NAME OF FATHER'S : Mr. Bal Krishna Shrestha
NATIONALITY : Nepalese
CONTRACT ADDRESS : ' 009**-*******, 982-***-****, 980*******
TEMPORARY ADDRESS : Kalanki, Tinthana VDC Ward No. 7, Kathmandu, Nepal
E-MAIL ADDRESS : ****.******@*****.***
HEIGHT : 1.75m
WEIGHT : 71 kg
COMPLEX : Olive
MARITAL STATUS : married
KEY QUALIFICATION :
I have hold in Diploma in Civil Engineering, Institute of Engineering from Pulchowk Engineering Campus, Nepal – 1998 and have 18 years worked experience in Civil Engineering fields like a detailed engineering survey, design, estimation, rate analysis and construction supervision, labors management with quality control worked in civil engineering fields like Highway, Bridge, Building, Irrigation, water supply and drainage system worked. I involved in since 1998 to date for civil engineering fields a as Surveyor, Quantity Surveyor, Inspector of Works etc and environmental friendly handling survey all kind of survey instruments are like Total Station instrument, Thedolite, EDM, Level Machine Operating etc. I involved in many national, international, multinational Construction Company like., World Bank, ADB, DFID UK and loan funded Projects. My experience will be valuable in fully civil engineering technical sound like quantity survey, cost estimate, rate analysis, valuation, variation, construction supervision and monitoring and many more civil engineering related worked. In additional experience on the job Trained (OJT) Auto CAD softer freely handling and generate plan and profile, cross section, contour etc and landslide stabilization and bio-engineering works. I had completed following projects indicated to below since 1998 to date for civil engineering fields:
Civil Supervisior, Rabigh2 Independent Power Plant Project,KSA,(From April 2015 to Sep 016 )
Inspector of Works, Air Transport Capacity Enhancement Project Tribhuvan International Airport,Kathmandu,The Project Fund by ADB (From Jan 2014 to Feb2015 )
Inspector of Works, Rural Access Programme (RAP2 Bridge Component) Arun River Bridge,Leguwa Dhankuta,The Project Fund by DFID,UK (From Nov 2011 to Oct2013)
Site Engineer /QA/QC, Habshan-5 Utilities & Offsites Project.Abu dhabi,UAE.The Project Fund by GASCO. (From Sep 2010 to Sep 2011 )
Site Engineer /QA/QC, Preal GTL Project,Raslafan Industrial City,Qatar.The Project Fund by Shell. (From Oct 2007 to Feb 2010 )
Quantity Surveyor, Melamchi Diversion Scheme, Sindhu and Gylthum Access Road and Melamchi Tunnel Project Contract No: MDS/AAR-002, From January 2005 to September 2007)
Site Engineer Building Construction of SITAPAILA HOUSING PROJECT (FROM May 2004 to January 2005)
Site Engineer / Quantity Surveyor, Building Construction of Royal Danish Embassy, Kathmandu. Nepal from January 2003 to May 2004
Site Engineer / Field Surveyor, Road Maintenance & Development project (RMDP), Tansen (Burtung) to Syangja sector (85km) of Along the Sidhartha Highway, From July 2001 to January 2003 Nepal, The Project funded by World Bank IDA Credit 3293-NP
Site Engineer, Bridge Upgrading & Maintenance Project (BUMP), from October 1999 to July 2001, The Project Funded by DFID,UK
Civil Overseer, Building Construction Project. Lahan Hospital & Gaighat Hospital, Nepal. Financed By UNFPA (UNDP) January 1999 to October 1999
Civil Overseer, Water Supply and Sanitation Sector & Irrigating Project under DDC, From May 1998 to January 1999
Trainings:
Ms Word, Excel internet, Auto CAD Training (6 months)
On the job trained by total station Instrument, Thedolite, Level Machines, TOTAL STATION for Civil engineering survey worked roads and water supply and drainage system and Irrigation construction supervision works.
On the job trained construction supervision, quality control, labors management and social mobilization with Development projects in road, project in my long carrier.
Education:
SLC School leaving Certificate Form Trivubhan Higher Secondary School. Nepal
Diploma in Civil Engineering, Institute of Engineering from Pulchowk Engineering Campus, Nepal – 1998
EMPLOYMENT RECORDS :
(1) Period : FROM April 2015 to date
Employer : Samsung C&T Corporation (Korean)
Project : Rabigh2 Independent Power Plant Project.
Rabigh, Kingdom of Saudi Arabia .
Client : ALMORJAN.SAUDI ELECTRICAL COMPANY
Position held : Civil Supervisor
Detailed Task Assigned : Construction supervision of Civil Works. Quality control works, labors management, construction Supervision of footings, foundation, pillars, beams, slabs, structures, finishing works, drainage Improvement and pavement works, preparation of RFI etc. Discuss Daily programme and progress with Sub-contractor, identify effect on available staff resources and discuss with the Civil Manager.
(2) Period : FROM January 2014 to Feb 2015
Employer : JAPAN AIRPORT CONSULTANT with GEOCE CONSULTANT
Project : Air Transport Capacity Enhancement Project Tribhuvan
International Airport,Kathmandu,Nepal
Client : Government of Nepal & ADB
Position held : Inspector of Works (Civil)
Detailed Task Assigned : Administration of Contract Site supervision including maintaining comprehensive site records including a daily site diary, Monitoring Contractors site operations are in accordance with the agreed method statements. Discuss Daily programme and progress with contractor, identify effect on available staff resources and discuss with the Resident Engineer.
(3) Period : FROM November 2011 to Oct 2013
Employer : IMC Worldwide.UK
Project : Second Rural Access Programme,Bridge ComponentArun River Bridge,Leguwa Dhankuta,Nepal
Client : Government of Nepal & DEID,UK
Position held : Inspector of Works Civil)
Detailed Task Assigned : Administration of Contract Site supervision including maintaining comprehensive site records including a daily site diary, Monitoring Contractors site operations are in accordance with the agreed method statements. Discuss Daily programme and progress with contractor, identify effect on available staff resources and discuss with the Resident Engineer.
(4) Period : FROM September 2010 to September 2011
Employer : Hyundai Engineering & construction Co.Ltd. (Korean)
In under Sub-Con Hyodong Devlopment Co.Ltd, Korea
Project : Habshan-5,Utilities&Offsites.Project No.5247.
Abu Dhabi, UAE .
Client : GASCO.
Position held : Site Engineer /QA/QC
Detailed Task Assigned : Construction supervision of Civil Works. Quality control works, labors management, construction Supervision of footings, foundation, pillars, beams, slabs, structures, finishing works, drainage Improvement and pavement works and preparation of RFI etc.
(5) Period : FROM October 2007 to February 2010
Employer : Chiyoda (Japanese) – Hyundai Heavy Ind. (Korean) Consortium
In under Sub-Con Gusan Engineering & Construction, Korea
Project : Preal GTL Project. Feed Gas Preparation Work (FGP).Raslafan
Industrial City, Qatar .
Client : Shell, Qatar Petroleum.
Consultants : KBR (American) & JGC (Japanese)(International Consultant)
Position held : Site Engineer /QA/QC
Detailed Task Assigned : The type of Feed Gas Preparation works. Setting out Survey and
Construction supervision of Civil Works. Quality control works, labors management, construction
Supervision of footings, foundation, pillars, beams, slabs, structures, finishing works, drainage
Improvement and pavement works and preparation of RFI etc.
(6) Period : FROM January 2005 to September 2007
Employer : CCECC (Chinese Int'l Contractors) – Sharma - Lama JV
Project : Melamchi Diversion Scheme, Sinduu and Gylthum Adit Access Road, Project Contract No: MDS/AAR-002. Sindupalchok, Nepal, Total Project Cost NRs. 10 Billions
Client : Melamchi Water Supply Board Nepal under Asian Development Bank, Norwegian, Switzerland JV
Consultants : Mounselll (International Consultant) in associating with Silt Consultants (P) Ltd., Mutual Engineering Constants (P) Ltd. - JV
Position held : Site Engineer / Quantity Surveyor
Detailed Task Assigned : Detail construction road survey by Total station survey instrument and traverse setting, center line fixing, cross section, existing ground profiles, contour, fixing out of the centerline, taking out the cross section using Electronic total station for road construction supervision of activities involved in fresh Road cutting, Pipe culvert, slab culverts, causeway, retaining wall, structures, and upgrading (structures & pavement), Labor Management, quality control and environmental friendly team worked. In addition survey of 20km length tunnel, retaining / breast wall, irrigation cannel, spoil-tip protection with Double Base Surface Treatment (DBST) of road monitoring, labors management, quantity survey, cost estimation, preparation of monthly payment certificate and dealing with consultant and employer etc.
(7) Period : FROM May 2004 to January 2005
Employer : Sharma & Company Pvt. Ltd.
Project : Building Construction of Sitapaila Housing Project, sitapaila, Kathmandu. Nepal.
Position held : Site Engineer / Quantity Surveyor (Building Construction)
Detailed task Assigned : Major responsible for supervision of different activities performed in science Building Construction of Sitapaila Housing Project, The Project has 56 individual houses, The activities were detailed engineering survey, quality control works, monitoring, labors management, dealing with consultants, quantity survey, construction supervision of footings, foundation, pillars, beams, slabs, finishing works, preparation of as build drawings and preparation of final running bills.
(8) Period : FROM January 2003 to May 2004
Employer : Sharma & Company Pvt. Ltd.
Project : Building Construction of Royal Danish Embassy, Lazimpat, Kathmandu. Nepal. Project Cost NRs 60 millions
Position held : Site Engineer / Quantity Surveyor (Building Construction)
Detailed task Assigned : Major responsible for supervision of different activities performed in science Building Construction of Royal Danish Embassy, Nepal. The Project Cost NRs 60 millions. The activities were detailed engineering survey, quality control works, monitoring, labors management, dealing with consultants, quantity survey, construction supervision of footings, foundation, pillars, beams, slabs, finishing works, preparation of as build drawings and preparation of final running bills.
(9) Period : FROM July 2001 to January 2003
Employer : CCECC (Chinese Int'l Contractors) – Sharma JV
Project : Road Maintenance & Development project (RMDP), Tansen (Burtung) to Syangja sector (85km) of Along the Sidhartha Highway, Nepal
Client : IDA Credit 3293-NP (World Bank)/ Department of Roads, Nepal
Consultants : WSP (UK) d and GEOCE Consultants Nepal.
Position held : Site Engineer / Field Surveyor for Roads
Detailed Task Assigned : The type of road works on Road Maintenance & Development project (RMDP), Tansen (Burtung) to Syangja Sector (85km) of Along the Sidhartha Highway, Nepal Total project cost constriction NRs. 225 Million. Setting out survey and Construction supervision of pavement with crushed stone base and DBST surfacing, rehabilitation/construction of retaining structures, drainage improvement, river training, landslide stabilization and bio-engineering measures, quality control, certification of payment certificates, scheduling and monitoring progress of above road works. Also carried out overall supervision of quality control operation of construction works, which included assistance to establishment of site laboratory, oversee quality control testing of materials and works.
(10) Period : FROM October 1999 to July 2001
Employer : Sharma & Company Pvt. Ltd.
Project : Bridge Upgrading & Maintenance Project (BUMP), East - West Highway, Nawalparasi, Nepal Project Cost NRs 50 Millions, financed by DFID, England,
Consultants : WSP (UK) d and GEOCE Consultants Nepal.
Position held : Asst. Civil Engineer (Road and Bridge Construction)
Detailed task Assigned : As per design of consultant road and bridge project for construction supervision of 103m (4 span) long continuous RCC Bridge over Kawasoti River, re-detail survey, quantity estimation, re-rate analysis, including 500m Approach Road and bridge construction supervision of sub-base, sub-grade & base course, Two coat of dressing, & Asphalt works and river training works in left and right bank of bridge construction sites.
(11) Period : FROM January 1999 to October 1999
Employer : Sharma & Company (P) Ltd.
Project : Building Construction Project. Lahan Hospital & Gaighat Hospital, Nepal. Financed By UNFPA (UNDP) Consultant Building Design Authority (BDA) Nepal
Position held : Asst. Civil Engineer (Building Construction)
Detailed Task Assigned : Major responsible for new Lahan Hospital building and Gaighat (Trijuga town) Hospital Building construction supervision of modern building. Construction supervision of different activities performed in activities were detailed engineering survey, leveling, estimating, quantity survey, quality control works, labors management, construction supervision of footings, foundation, pillars, beams, slabs, structures, finishing works, plumbing system including drainage improvement and pavement works and preparation of final running bills etc.
(12) Period : FROM May 1998 to January 1999
Employer : District Development Community (DDC)
Project : Water Supply and Sanitation Sector & Irrigating Project under DDC
Position held : Asst.Civil Engineer (Water Supply and Irrigation)
Detailed task Assigned : Major responsible for supervision of different activities performed in Water Supply and Sanitation Sector & Irrigating Projects under DDC. The activities were detailed engineering survey, estimate, rate analysis, quantity survey, quality control works, monitoring, social and environmental impact assessment with construction supervision water supply and irrigation Cannel rehabilitation and improvement projects and monthly progress report preparation and meeting organization with client, consultants, donor agency and LDO and many more respected personnel.
Languages : Speaking Reading Writing
English Good Good Good
Nepali Excellent Excellent Excellent
Hindi Good Good Good
Certification:
I, the undersigned, certify that this bio-data correctly describes my qualification, my experiences and me. I understand that any wilful misstatement described herein may lead to disqualification or dismissal if employed.
Signature :
Date of Signed : 11 March 2017