Summary:

Mechanical Supervisor with more than 25 years’ experience in the installation, commissioning, inspection, preservation and maintenance of rotating and static equipment for heavy industrial projects, including FPSO, refineries, chemical, petrochemical, gas and power projects in South East Asia, the Middle East, North Africa and North America. Background includes planning, organization, inspection and supervision of mechanical work, including all aspects of job safety. Equipment includes gas and steam turbines, centrifugal and reciprocating compressors, pumps, packaged skid units, and static equipment.

Languages: English/French

Citizenship: Canada/France

Date of Birth: 20-Sept-1961

Education: Keyano College, Fort Mc Murray, Alberta, Canada Certification: Machinery Erection (Millwright) Canadian Interprovincial Certification No: JO900953

Mitsui Engineering and Shipbuilding Asia PTE. LTD - Jurong Island, Singapore. From 11- Apr-2016 to 03-Apr-2017

Mechanical Superintendent (ExxonMobil AuroraEOS Project) Responsible for timely installation of rotating and static equipment. Ensured mechanical sub- contractors used approved work method statements and followed HSE regulatory and site specific procedures. Attended and actively participated in daily Pre Task Talk meetings including on site reviews of risk assessments and hazard identification. Coordinated work activities with other disciplines to maintain schedule, minimizing risk and increasing productivity. All rotating equipment installations where conducted in strict adherence to API686 or job specific specifications.

Kellogg Joint Venture Gorgon - Ulsan Korea. From 8-Jun-2013 to 31-May-2014 Mechanical Field Engineer (Chevron Gorgon Project) Supported Gorgon module fabrication and schedule objectives while maintaining high standard of quality and safety. Ensured contractor's mechanical construction activities were conducted expediently, to acceptable standards, and in accordance with the Gorgon procedures. Fully participated in the implementation of safety and IIF in the field. Assisted in and review /approval of equipment installation related documents and procedures. Ensured contractor had adequate systems in place to meet project and quality objectives to monitored and control all equipment installation activities.

ExxonMobil – Jurong Island, Singapore. From 1-June-2009 to 31-Oct-2012 Machinery Field Engineer (Singapore Parallel Trains Olefins) 1

Proactively engaged in ExxonMobil Safety Culture. Participated in all SHE programs and attended all regulatory and site specific safety training. Stewarded prime contractor and sub-contractors in equipment installation work. Provided oversight to ensure compliance with Job Specification requirements and Industry Standards. Assisted contractor in developing equipment and material preservation program. Monitored and tracked progress through duration of project. Functioned as Owner Quality Control representative for all Machinery installation work. Attended inspections per approved ITP (Inspection and Test Plan).Responsible to approve dispositions and close-out of Non-Conformance and Corrective Action reports. Provided Owner oversight in the installation of all machinery including GE Frame 9E Gas Turbine Generators. ConocoPhillips - Sembawang, Singapore. From 1-Feb-2006 to 31-Dec-2008 Rotating Equipment Construction Supervisor (Bohia Phase II FPSO Project) Responsible for topsides equipment installation, preservation and mechanical completion during fabrication, integration and hull carry over work phase. Ensured work carried out in accordance to Project HSE requirements and actively participated in HSE Program. Interface for all mechanical discipline project control matters including planning, scheduling, job carding, budgeting and progress reporting. Response to Mechanical related Site Queries and verified close-out. Issue Site Instructions to contractor and monitored day works time sheets. Coordinated Mechanical vendor representatives field activities. Equipment installed included Nuovo Pignone Frame Five Turbo Generators, Heat Recovery Steam Generators, Howden screw compressors and Westfalia Centrifuged Separators.

ConocoPhillips - Batam, Indonesia. From 23-May-2002 to 05-Dec-2005 Rotating Equipment Supervisor (Belanak FPSO Project) Responsible for the successful installation of topsides rotating equipment, static equipment and for the overall equipment preventive maintenance program during module fabrication and integration. Responsibilities consisted of completing the discipline scope safely, meeting all quality requirements, completing on schedule, within budget and supporting all additional project goals. Major equipment packages installed included Rolls Royce, RB211/Avon gas generators and Dresser Rand, two stage Datum compressors.

Conoco - Deir Ez Zor, Syria. From 5-June-2000 to 9-Aug- 2001 Rotating Equipment Construction Representative (DEZ Gas Project) Responsible for monitoring all contractors’ rotating/static equipment activities. This included verifying equipment was installed in accordance with project technical documents and monitoring contractor's being followed and interfaced with the construction superintendent on all quality, schedule, and cost issues. Project equipment included six PGT-102B Nuovo Pignone gas turbine/compressor units.

Sonarco (JV of Sonatrach and ARCO)- Rhourde el Baguel, Algeria. From 20-Dec-1999 to 23- Oct-2000

Commissioning Equipment Supervisor (Sonarco EOR Project) Organized commissioning support activities of all rotating and static equipment. Coordinated multi-discipline scheduling, manpower, and work-scope activities, conducted safety meetings The M.W. Kellogg Co. – Rhourde el Baguel, Algeria. From 20-Jan-1997 to 18-Nov-1999 Equipment Supervisor (Sonarco EOR Project)

Responsible for installation of five Frame 5 Nouvo Pignone gas turbine/compressor units, three 2

PGT-10 Nuovo Pignone gas turbine/generator and miscellaneous rotating and static equipment. The M.W. Kellogg Co. – Arzew, Algeria. From 1-May-1994 to 17-Oct-1996 Equipment Supervisor (Sonatrach GL2Z LNG Project)

Responsible for all equipment on four new 10MW boiler installations, including scheduling, inspections, construction and start-up. Following new work completion supervised equipment renovation of LNG trains, including rework and commissioning of the main 25 MW turbo- compressor units. Responsible for troubleshooting and maintenance of all equipment, during the test/maintenance phase of the contract.

Additional Work Experience 1983 –1993

Millwright Foreman, Catalytic Enterprises Ltd, Suncor Inc. Fort McMurray, AB, Canada. Millwright, Dilcon Construction/Miller Western – Saskatchewan, Canada. Millwright Foreman, Manhire Industrial Service- Ontario, Canada. Millwright, M.H.E Contracting – Ontario, Canada.