SHINOY.P
Electrical Engineer/QA/QC Coordinator/Site
Engineer
ABOUT ME
Date of Birth: 25 January 1993
Gender: Male
Birth Place: Kerala, India
Marriage Status: Married
Driving License: Qatar and India
PROFILE
Qualified Electrical Engineer/ QA-QC
Coordinator/ Site Engineer with 4+
years of GCC experience in executing
Electrical and Civil Construction/
Maintenance Projects. Strengths in
establishing project briefs. Client
liaison, user uptakes, staff training etc.
CONTACT
Kozhikode, Kerala, India
advsqg@r.postjobfree.com
WORK EXPERIENCE
Qatar Power Construction. W.L.L, Doha
Qatar
Sep 2020 to still to date
Substation Engineer/Cable Engineer
Projects:
GTC 986/20 Replacement of Old
Distribution Equipment.
GTC 744/15 Replacement of Old
Distribution Equipment.
Page 1 of 3
CV of Shinoy.P
CAREER OBJECTIVE
An approved person to perform Installation/ Commissioning/Maintenance in the electrical distribution network of KAHRAMAA-Qatar General Electricity & Water Corporation (Up to 33KV). Electrical Engineer with 7+ years of experience with 4+ years in GCC and vast knowledge in MV/LV electrical distribution system network. Considerable experience in cable fault locating for Distribution MV/LV network. Familiar in Installation, Commissioning, Operation and Maintenance of different type High Voltage switch gears and Distribution transformers. Worked as QA/QC Engineer for the FIFA WORLD CUP STADIUM and also worked as operation engineer in Transmission and Distribution network of Kerala State Electricity Board, India.
MAJOR RESPONSIBILITIES
Installation/Commissioning/Maintenance/Replacement/Dismantling of Distribution Substation Equipment's. (11 KV indoor and Outdoor switchgears, Transformers, LV Feeder Pillars/Panels)
Installation of Battery Chargers, Marshalling Box & LV service cut-outs
(MCCB). Installation/Commissioning/Maintenance of Package Substations and Substation earthing works. Prepare work schedule for Maintenance/Replacement activities.
Supervision of Working party/Subcontractor for the Construction/Maintenance/Replacement activities. Replacement/Re- Routing and Carrying out Damage repairs of Cables.
Prepare and maintain work related Technical/Administrative documents.
Resolving any issues and discrepancies related to work.
Working in collaboration with the team members.
Ensuring compliance with current regulations.
Monitoring and reporting on all activities, processes, and procedures.
Performing regular inspections and reviews to ensure employees adhere to quality and safety policies.
Preparing and maintaining quality management
documentation.
Page 2 of 3
CV of Shinoy. P
Material Handover and Documentation.
Replacement/Re-Routing and Carrying out Damage repairs of Cables.
Schedule for Maintenance/Replacement activities.
Quality and safety.
MAJOR RESPONSIBILITIES
WORK EXPERIENCE
GTC 666/14 Electricity Distribution
Network Works.
Lusail Plaza Tower.
Lusail Palace.
Clients:
KAHRAMAA (Qatar General Electricity &
Water Corporation).
Urban Concept W.L.L, Doha Qatar
Aug 2018 to Sep 2020
QA/QC Engineer/ Site
Engineer
Projects:
Al Thumama Stadium and
Precinct Project.
Al-Wakrah Stadium and Precinct
Project.
Clients:
Supreme Committee for Delivery and
Legacy (SC)
KSEB (Kerala State Electricity
Board) Kerala, India.
July 2015 to Still July 2018
Assistant Engineer/Substation Operation &
Maintenance Engineer
Projects: 110 KV SUBSTATIONS
Clients: Kerala State Electricity
Board
Develop team goals and manage them for results
Act as a link between client and other members involved in the construction
Provides subcontractors with information and support, as outlined within contract specifications, to allow work to proceed as scheduled
Inspect the construction site to ensure the appropriate level of quality control in all the phases.
Coordinate with the material supply chain to provide the needed supplies.
Ensuring the work progress and site handling
Preparing Method statement, ITP, Material Submittals, checklist, IRM, IRW.
Preparing daily report, weekly report and monthly report.
Performing quality checks and tests.
Arranging material inspection, work inspection and preparing planning schedules as per the Client requirements & consultant’s instructions.
Reporting all the quality control tests in comprehensible reports.
Performing regular inspection at site with consultant to verify the quality of ongoing / completed works as per QCS Standard
Prepare construction progress reports from the site to be provided to the construction manager.
MAJOR RESPONSIBILITIES
Laying and termination of power cables and control cables.
Continually monitor and control the substation equipment for reliable and safe operation of the network.
Switching operation and maintenance of Power Transformers.
Operation and maintenance of VCB's, PT, CT, Lightening Arresters and 110, 11 KV Isolators (ABS).
Installation of 110 KV feeders and Transformers panels.
Responsible for all structural & Stainless steel piping fabrication and erection works.
Reading isometric & structural drawings to execute the works as per design.
REFERENCES
AKHIL.K.S
Project Manager
Contact No: +974-********
Email: advsqg@r.postjobfree.com
SKILLS
Good Communication Skills
Critical Thinking
Time Management
Multitasking
Administrative
Team Player
Leadership Quality
LANGUAGES
English, Hindi, Malayalam
Page 3 of 3
CV of Shinoy. P
DECLARATION
I hereby declare that the information given above is true and correct to the best of my knowledge. Shinoy. P
ACADEMIC BACKGROUND
Anna University Chennai
2011 – 2015
BE in Electrical and Electronics Engineering
Higher Secondary Course (HSC)
2009 – 2011
Plus Two in Science
Secondary (Central Board of secondary Education, New Delhi, India) 2008 – 2009