Post Job Free
Sign in

Plant Manager Project

Location:
Bel-Air, 1227, Philippines
Posted:
March 07, 2023

Contact this candidate

Resume:

EDUCATION :

WORK EXPERIENCE :

** * ****** ****** **** Rembo Makati City

091********

April 12, 1983

******************@*****.***

SONNY CUEVAS RABULAS

OBJECTIVE :

Seeking a demanding and quality oriented

position in an organization to gain work

experience and knowledge. To be an integral

part of good environment that could make

effective use of my potential and to

contribute towards achievement of

organizational objectives.

SKILLS :

COMMUNICATION

LEADERSHIP

TEAM MANAGEMENT

DECISION MAKER

PROJECT MANAGEMENT

MANUFACTURING STRATEGIES

LANGUAGE :

English and Tagalog

BACHELOR OF SCIENCE IN CIVIL ENGINEERING

ADAMSON UNIVERSITY

YR. 1999 – YR. 2005

BOSTIK PHILIPPINES INC.

Raffles Corporate Building Emerald Ave. Ortigas, Pasig City.

(January 17, 2006 – June 1, 2007)

Position: TECHNICAL ENGINEER

Conduct technical services to our clients such as Product demonstration, Cost estimates and Product Application.

MG EXEO NETWORK INC.

DPC Building Pasong Tamo Makati City

(July 7, 2007 – Jan.30, 2008)

Position: PROJECT ENGINEER

Provide Supervisions to our Sub-Contractor at the site. Estimates and Costing for the different materials.Handle Material Management especially on Quality Control of the supplied materials.

PHILIPPINE INSULATION INC.

Pascor Building Paranaque City

(February 2008 – July 2008)

Position: PROJECT ENGINEER

Provide Supervisions to our Sub-Contractor at the site. Estimates and Costing for the different materials.Handle Material Management especially on Quality Control of the supplied materials.

ARLO ALUMINUM CO. INC

Dr. Sixto Pasig City

July 2008 – October 2009)

Position: Production Planning and Control/Detaileron: 1. Responsible for the preparation of materials take-off and Details. 2. Checks and approves all materials quantity take-off to ensure all materials ordered are in conformance with the technical specification. 3. Reviews shop drawings together with the chief designer prior to Fabrication. 4. Review/evaluate the project schedule and prepare a procurement schedule as the basis for the monthly procurement of materials.

5. Reports directly to the Managing Department for review and assessment of shop drawings and materials take-off for possible value engineering works. 6. Checks and approve requisition of materials by Project Management Group prior requisition to the Purchasing Department.

FILPRIDE RESOURCES INC.

Mandaluyong City

(December 2009-April 2010)

Position: OIC Safety Engineer

1. Dealing with health and safety issues in line with the procedures detailed in the Appendix to the Occupational Health and Safety Policy. 2. Investigating and reporting on all incidents, injuries and occupational health problems and notifying Occupational Health and Safety of incidents and hazards in line with reporting requirements.

3. Assisting with promoting occupational health and safety awareness. 4. Bringing to the attention of staff and ground personnel, occupational health and safety hazards associated with their work.

5. Project In-Charge in terms of Plant Development. 6. Officer in Charge on Safety and Security Department. 7. Handle Plant Maintenance and Act as Supervisors of the maintenance personnel. WORK EXPERIENCE :

TRAININGS AND SEMINARS :

BASIC OCCUPATIONAL SAFETY AND HEALTH

(BOSCH)

Rembrandt, Hotel Quezon City

April 14-18, 2008

CONSTRUCTION SAFETY AND HEALTH

DOLE Building, Quezon City

May 20-24, 2013

CERTIFIED PROFESSIONAL MANAGERS TRAINING

Bayanihan building, Mandaluyong City

January 2017 – March 2017

SKRENE PROPERTIES INC.

Palanan, Makati City

(May 2010-September 2012)

Position: Building Administrator

1. Interprets and enforces Building policies and administrative regulations. 2. Monitoring building systems and processes.

3. Overseeing and supervising the installation of building systems and specifying maintenance and operating procedures.

4. Ensuring that the design and maintenance of building systems meets legislative and health and safety requirements.

5. Working on a variety of projects within a short period of time. 6. Secure and Handle Building Licenses and Permits. 7. Manage Building Securities.

8. Meeting with building Tenants for their Queries. NISHIN METAL CORPORATION

Ortigas, Pasig City

(Sept. 2012- Sept. 2015)

Position: Assistant Project Manager

1. Understand the scope of the project, identify the project participants, keep updated contact information and ensure that you have a reliable means of communicating at all times during the day with the project team.

2. Evaluate the progress of the project to ensure that the timeline is followed steadily and consistently. Keep an open line of communication with the project participants so they can alert you to potential problems they might encounter 3. Embrace the role of researcher, anticipating that at some point in the project, you will have to investigate some element that is vital to its culmination. 4. Perform important administrative functions for the project manager, which might include updating the project schedule, taking minutes at meetings, making phone calls to vendors and suppliers, responding to e-mails and writing progress reports to the project team.

(Sept. 2012- Sept. 2015)

Position: Assistant Project Manager

Job Description:

1. Understand the scope of the project, identify the project participants, keep updated contact information and ensure that you have a reliable means of communicating at all times during the day with the project team.

2. Evaluate the progress of the project to ensure that the timeline is followed steadily and consistently. Keep an open line of communication with the project participants so they can alert you to potential problems they might encounter 3. Embrace the role of researcher, anticipating that at some point in the project, you will have to investigate some element that is vital to its culmination.

Perform important administrative functions for the project manager, which might include updating the project schedule, taking minutes at meetings, making phone calls to vendors and suppliers, responding to e-mails and writing progress reports to the project team.

GLAZETECH GLASS AND ALUMINUM

BGC Taguig City

(Sept. 2015- May 2018)

Position: PLANT MANAGER

1. Direct and coordinate plant operations within company policies and procedures. 2. Maintain a clean and safe plant.

3. Establish and direct plant policies and procedures. 4. Responsible for plant production goals.

5. Establish and maintain a positive community relationship. 6. Foster a well-trained and motivated staff.

7. Confer with department heads to ensure coordination of purchasing, production, and shipping.

8. Responsible for establishing all shift production schedules. 9. Select and train plant supervisory and administrative staff. 10. Schedule and conduct plant meetings.

11. Responsible for the product quality control for the plant. SMS GLOBAL TECHNOLOGIES

Ortigas, Pasig City

(May 2018- July 2019)

Position: SENIOR PROJECT COORDINATOR

1. Direct and coordinate site operations.

2. Supervise testing of Construction Materials to be used at site. 3. Establish project schedules form start to finish. 4. Inspect and approved sub-con turn overs and billings. 5. Schedule and conduct meetings regarding the site/projects updates and issues may rise that will stop the operations.

6. Responsible for the product quality control for the plant. BRADPHIL INC. GLASS AND ALUMINUM

Tatay, Rizal

(July 2019 – January 2023)

Position: Production Department Manager

Delivery Department Manager

QA/QC Department Manager

Planning Department Manager

1. Direct and coordinate plant operations within company policies and procedures. 2. Maintain a clean and safe plant.

3. Establish and direct plant policies and procedures. 4. Responsible for plant production goals.

5. Establish and maintain a positive community relationship. 6. Foster a well-trained and motivated staff.

7. Confer with department heads to ensure coordination of purchasing, production, and shipping.

8. Responsible for establishing all shift production schedules. 9. Select and train plant supervisory and administrative staff. 10. Schedule and conduct plant meetings.

11. Responsible for the product quality control for the plant. 12. Planning and organizing production schedules and assessing project and resource requirements.

I hereby certify that all the information above is true and correct to the best of my knowledge and belief. No attempt has been made to conceal or withhold any information herein, I understand if any may invalidate my application. SONNY CUEVAS RABULAS



Contact this candidate