WORK EXPERIENCE
OE, ee eee
JGC Corporation (CCC)
Barzan Onshore, Project Qatar
Instrument Chargehand
06.11.2013 to 02.01.2015
CCC
New Doha International Airport (NDIA) NDAB Project
Instrument Chargehand
04.10.2011 to 11.03.2013
ccc
Raslaffan Port Expansion (RPL) Project
Instrument Chargehand
06.02.2011 to 04.10.2011
CCC
Qatar Gas II Development Project (QGX Il) Project
Instrument Chargehand
22.03.2007 to 29.10.2010
CCC
Low Sulphur Diesel Production Project, (Bahrain)
Instrument Chargehand
24.09.2006 to 23.03.2007
LAER ACU) EUR ON NS LR RRS SERRANO IO OMEN OS SR RUN en
na 3 on eee tmeoee earn oe re Se ARN TRE TRNRREINRR apRR eiemter Yeertnge oy oe name
Constructing Of Work All Field Terminator of Instrument and Control Cable Dressing, Cable
Laying, Cable Termination Glanding, Impulse Line and Cable Puling Deluge Line.
Worked For Supervise To Fitter Installation of Junction Boxes, All Types of Cable Its Support
Tubing, According To the Project Specification. Supervise To Electrician in Glanding anc
Termination, Arrange To the Materials and Make the Reports Submit To the Engineer. Als«
Involved In Cold Loop and Hot Loop Checking and Client Person Through.
Continuity Testing, Installation Instrument, FT, PT, LT, TT, RTD, TGD, TC, FGD, All Types «
Instrumentation Work Etc, Pre Loop Checking, Loop Checking Knowledge Of Control Valv
Knowledge Of Hook-Up Drawing And Typical, P & ID, Layout, Drawing Worked On Rosemoun
Yokogawa, Honeywell, TDC 2000/2003 System Highway Loop Checking And Work.