Post Job Free

Resume

Sign in

Maintenance Mechanic Packaging Machine

Location:
West Fairmount Park, PA, 19131
Posted:
March 06, 2023

Contact this candidate

Resume:

Gregory Davis

**** **** ***** ******

Philadelphia,Pa.19131

Cell phone-267-***-****

E-Mail:advqrm@r.postjobfree.com

EXPERIENCE:

April/2016 to Present

Formosa Plastics

Instrumentation/Electrician

Repaired all plant process system and controls, worked from daily work order,PM sheets,on various system,Tanks reactors,holdings tanks,valves,level comtrols,pressure transmitter,process system,baghouses,grinders,flow controls,24,120,AC/DC voltages,

July/2012 to April/2016

Barry Callebaut LLc

Maintenance Mechanic/Electrician

Perform all plant manufacturing maintenance repairs,mechanical and Electrical,preventative maintenance,troubleshooting and doing plant improvements,using SOP,GMP`S,working from daily work order duties,working with plant operator and quality control,large equipment machinery,A/C motors,blenders,silo,mixers pumps,vacuum blowers,grinders,dump station and varous other types of machinery.Cohocolate powders from cocoa beans.

Sep/2010 to july/2012

Graham Packaging

Maintenance Mechanic

Repair all Plant manufacturing machinery,rather its mechanical or electrical,troubleshooting and repair,adding some plant improvements,part of safety committee,PLC`S,electrical system,mechanical adjustment and changes.

March/2009 to Aug/2010

Synegro Technology

I/E Technician

Responsible for Plant maintenance and repairs of waste resources,dewatering technology,Troubleshoot and repair of instrumentation and electrical systems.Consists of of conveyor,plant automation system,silos,tanks,dryers,and transfer stations,various sub station and PLC`S. Can use electrical test equipment,tools,and welding.General Plant maintenances.

Aug/2008 to March/2010

McGrath Systems

Metso Inc

Electro-Mechanic

Build large control panel to customer specs, Wiring cabinet using blueprint, Component installation, fiber optic and Ethernet cable using various hand tools, wiring I/O components, power supplies, down loading system programs, troubleshooting system wiring and testing

AGC Chemical

Maintenance Mechanic

Repair and troubleshoot all plant production machinery,electrical systems,PLC`S,consists of blender,mixer,dryer (furnances),also extruder an various sub machinery. Can use electrical test equipment, tools, and welding. Plumping, General plant maintenance. I also have GMP experiences.

Jan/2003 to Aug/2008

Arctic Glacier Inc,

Maintenance Mechanic

responsible for mechanical and electrical repairs of production machinery. Consists of conveyor, automatic pallet wrap to condensers, compressor, PLC`s to motor controls. Also responsible for mechanical repair of high speed packaging machine,consist of gear boxes,roller bearing,chain link and belts,servo positioner speed controller,shafts,bearings replacements,sproctes,using blue print,mechanical assembly, alignment,hand tools,and forklift repairs.

March/2002 to Nov/2007

Claymount Steel

Maintenance Tech

Troubleshooting all plant electrical problems, anything from outlets to machine

technology, also overhead cranes. Repaired electronic and electrical equipment to mechanical and

hydraulic machinery. Wired and setup control panels to new machines, also

installed conduit, cable wires, relays, fuses, and inverters using voltmeter and

hand tools. Worked with thermal couple, temperature probes, and PLC`S.

Worked with 120,277,and 480 3-phase system, AC/DC motors (1hp

to 70hp) responsible for adjustment and wiring. Install and maintain high and low

voltage circuits, and electrical controll equipment. Can work from blueprints,

schematics diagrams and equipment manuals..

March/2002 to February/2003

Assured Electric Co

Commercial/Electrician

Wallingford, PA.

Installed and troubleshoot customer electrical problems, using verbal or written

request. Ability to install and repair outlets, circuit breaker boxes, switches, lights, fans, and ground fault receptacles, Also ran piping,(2 or3)12,14 gauge wiring.

Jan /2001 to Feb 2002

INSTRUMENTATION/ELECTRICIAN TECH

Degussa Corporation, Chester, PA

Responsibilities, included: installation, calibration and maintenance of plant

Instrumentation and Electrical systems. Ability to troubleshoot maintains analyze

plant operations through a computer Control system and controllers. Responsible

for adjustment, wiring and installing high and low Voltage circuits. Read and

write programmable logic controls (Modicon and Allen Bradleys).

Nov 2000 to Dec 2001

ELECTRICIAN

Frankford Chocolate Candy Co., Philadelphia, PA

Troubleshooting all plant electrical problems, anything from outlets to machine

technology. Repaired electronic and electrical equipment to mechanical and

hydraulic machinery. Wired and setup control panels to new machines, also

installed conduit, cable wires, relays, fuses, and inverters using voltmeter and

hand tools. Worked with thermal couple, temperature probes, and PLC`S AB (Allen

Bradley, Watlows). Worked with 120,277,and 480 3-phase system, AC/DC motors (1hp

to 70hp) responsible for adjustment and wiring. Install and maintain high and low

voltage circuits, and electrical con- troll equipment. . Also responsible for mechanical repair of high speed packaging machine,consist of gear boxes,roller bearing,chain link and belts,servo positioner speed controller,shafts,bearings replacements,sproctes,using blue print,mechanical assembly, alignment,hand tools,and forklift repairs.

.

May 1998 to Oct 2000

ELECTRICIAN

Allied Tube & Conduit, Phila, PA

[Duties almost similar to Frankford]

Responsible for reconfiguring operating equipment for production adjustment and wiring.

Install and maintain low and high voltage circuits, electrical generating transmission

and control equipment. Can work from blueprints, schematics diagrams, and rough sketches and equipment manuals. Wired and setup control panels to new machines, also installed conduit, cable wires, relays, fuses, and inverters using voltmeter and high voltage fusing conduction system. Also responsible for mechanical repair of high speed pipe forming machine,consist of gear boxes,roller bearing,chain link and belts,servo positioner speed controller,shafts,bearings replacements,sproctes,using blue print,mechanical assembly, alignment,hand tools.

Jan/1990 to May/1998

SENIOR INSTRUMENTATION TECHNICIAN

WREI/Westinghouse Electric Co., Chester, PA

Troubleshooting; repaired and calibrated all plant automated control systems

from WDPS (Westinghouse Data Processing Systems), to CEMS (Continuous Emission

Monitor Systems). Calibrated and repaired plant instrumentation process control

equipment, including all peripheral equipment and stand-alone programmable

controller (PLC`S). Worked with pressure gauges, temperature probes, level

systems, and valve control systems. Used computers transcat, voltmeter

oscilloscope, measurement tester, pump gauges, gas analyzers and hand tools.

Trash to, steam and energy technologies.

Jan 1986 to Dec/1990

SYSTEM TEST TECHNICIAN

Unisys Corporation, Paoli, PA

Setup and configured Unisys systems to design specification and initial power up

status. Ran diagnostic testing on system and troubleshooting faulty units to

component level. Tested large and small microcomputer (A12, A15, A16 and A17),

and all related maintenance station systems. Performed daily testing on all

related subassemblies such as, printed circuit boards, power supplies voltage

regulators, and assemblies associated with the product line. Delivered frequent

presentation to management on Product Quality and Performance. Awarded a

certificate of accomplishment in Statistical Process

Control.

EDUCATION

PENNSYLVANIA INSTITUTE OF TECHNOLOGY

Associate’s Degree -- Electronic Design, completed in 1986

Tuskegee University 6/80 to 5/82

Electrical Engineering

SKILLS, ACHIEVEMENTS AND QUALIFICATIONS

8 Year(s) Experience Troubleshooting all plant electrical problems, from

outlets to machine technology. Repaired electronic and electrical equipment to

mechanical and hydraulic machinery. Wired and setup control panels to new

machines, also installed conduit, cable wires, relays, fuses, and inverters using

voltmeter and hand tools. Worked with thermal couple, temperature probes, and

PLC`S AB (Allen Bradley, Watlows). Worked with 120,277,and 480 3-phase systems,

AC/DC motors (1hp to 70hp). Responsible for adjustment and wiring. Install and

maintain high and low voltage circuits, and electrical con- troll equipment. Can

work from blueprints, schematics diagrams and equipment manuals.

REFERENCES



Contact this candidate