Post Job Free
Sign in

Store Team Packing

Location:
Ramchandi, Chhattisgarh, India
Salary:
50000/Month
Posted:
March 05, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

Name: - Sanjay Kumar Prajapati

Address: - 74, Umarahat, post Umarahat, Tehsil Nagod, Distt.satna (M.P.)

Pin code 485447

Contact no: - 089********,900-***-****

E Mail ID : -******.*********@***********.***, skprajapati2011@gmailcom

Career Objective: -

To work in a dynamic and challenging environment that utilizes my knowledge and education contribute to the overall growth and profitability of the company through application of analytical and technical skills.

Summary of skill & Experience: -

I am working as an Assistant Engineer in Mahan Aluminium (Hindalco industries Limited), Bargawan, Singrauli since 1-Jul-2011 to till.

Company profile:

An industry leader in aluminium and copper, Hindalco Industries Limited, the metals Flagship Company of the Aditya Birla Group is the world's largest aluminium rolling company and one of the biggest producers of primary aluminium in Asia. Its copper smelter is the world’s largest custom smelter at a single location.

Job Profile:

Currently working as, a Packing shift in-charge (O&M) in Cast house.

Professional Preface:

A professional with around 11.1 years of experience in O&M, Projects, Erection & Commissioning. Currently working with Hindalco Industries Limited, Mahan Aluminium Project (MAP), Singrauli, MP (India) in Cast House Department of the smelter unit as shift in-charge.

Project experience as an added advantage. A keen strategist with experience in managing entire project as well as plant operations with key focus on top line & bottom line profitability by ensuring optimal utilization of resources. Procurement and selection of 3.6 years spares, O/M spares and critical spares for various packages involving Furnace Tending Assembly, cranes, Ingot casting machine, sow casting machine etc. Performing manpower, outsourcing, maintenance and production planning’s.

A dept. in managing erection & commissioning and maintenance activities involving resource planning, in-process inspection, team building and co-ordination with internal / external departments. Expertise in managing maintenance operations for reducing breakdown / downtime & enhancing operational effectiveness of equipment. An effective communicator with excellent relationship management, strong analytical, problem solving and organisational abilities.

Employment scan

Erection & Commissioning

Ensuring effective management and discipline to ensure safe & timely execution of the projects.

Conducting tests & inspections to ensure operational effectiveness of utilities; planning & effectuating maintenance plans for machines and equipment.

Operation and maintenance:

Planning the preventive & breakdown maintenance schedules for improving overall reliability and safety.

Conducting failure investigation analysis to identify gaps & take corrective measures to reduce equipment downtime & maximise equipment availability.

Optimising processes, troubleshooting problems in coordination with other departments and improving efficiency.

Identifying areas of obstruction / defects and conducting service and repair to rectify the equipment’s through the application of troubleshooting tools.

Packing of all products (as Pig ingot, Sow Ingot WRM coil, Cast Bar and Billet)

Maintenance of All packing tool as (automatic Strapping Machine, and Manual Tool)

Reduce breakdown time of Strapping machine.

Packing improvement as per customer requirement.

Manpower handling shift basis.

Manage Area inventory of All Packing Item and Spare Parts.

Rising of PR of Required item and fallow with Purchase team and Store Team.

New Vendor Develop for Continuous supply chain of Spare parts and Packing Item.

Material handling by EOT Crane. Hydra and Forklift.

Execution of Fabrication jobs (Projects) as per plan to fulfil the requirement of user departments in cast house.

Execute the PM activity of online two ingot strapping machine, hand tools, forklifts & Crane for trouble free operation.

Daily toolbox talk with team members regarding safety, housekeeping & challenges in daily activity.

Execute the trial of new packing pattern as per recommendation with technical & marketing team.

Daily MIS report of packing & inventory.

Discussion with SH for new opportunities of packing patterns and execution for the same for cost effectiveness and fulfil customer requirement.

Preparation of HIRA, SOP, and SWI for all activities of packing section half yearly basis as per HIL standard and ensure to compliance at site as per the company HMF.

Quality Control:-

Planning the Metal Production in Higher Purity as per given order.

Plan the metal distribution as per metal Grade.

Plan which grade produce first as per order.

Special Training Achieved:

Kaizen

5 's'

Safety

First-aid

Hydraulic and Pneumatic System

Hot and Height work

Permit and LOTOTO

Activities:

• Preparing PM schedule & keeping record breakdown, uptime/ downtime, preventive & planned maintenance.

• To maintain the preventive, predictive, corrective & breakdown maintenance. -

i.Planning & procurement of spare

ii.TPM implementation such as man, machine, interface mapping, operator problem etc.

iii.Kaizen implementation for zero breakdown, spare cost reduction, etc.

iv.Making and update HIRA (Hazard identification and risk assessment), SWI (Standard work instruction) and SMP (Standard maintenance procedure)

Responsibilities:

Smooth running Strapping Machine without any breakdown.

All product to be packed in same shift

Zero customer complaint regarding packing issue .

Preparation & implementation of preventive maintenance schedule.

Keeping records of

Why-why analysis & counter measure.

Root cause analysis of frequently occurring problems.

Implementation of TPM, 5’s’ in department.

Make permanent solution for regular problem & reducing spare costs.

Working for minimum occurring case of breakdown.

Doing all Small Group activities in shift like Small group meeting, AM meeting, abnormality finding and correction.

Project:

I have done many project.

Packing of Wire Rod Coil Eye to sky for export customer.

Strapping machine on line cleaning system

Billet packing with plastic strap in place of steel strap for domestic customer

Develop Eye to sky pallet with pinewood.

Educational Qualification: -

* Diploma in MECHANICAL ENGINEERING from GOVERNMENT POLYTECHNIC COLLEGE SATNA MP

Passed in June 20011 with First Class. (65%)

Project Done: - RAC (refrigerator and air cooling)

* Passed 10th from MP. Board.

* Passed HIGH SCHOOL from MP. Board.

Computer Knowledge: -

. Microsoft Office

. Excel

. Internet Applications

Strengths: -

. Self – Confident, Self-Motivated & Positive thinking

. Skilled at taking initiative and leading the group.

. Good communication skills with ability to influence others.

. I believe in growth through continuous learning and application of knowledge.

. Problem solving techniques.

Personal details: -

Name: SANJAY KUMAR PRAJAPATI

Father Name: Mr. RAJARAM PRAJAPATI

DOB: 19-Sep-1989

Gender: Male

Marital Status: Married

Languages known: Hindi, English

Hobbies: Reading Books, watching movies.

I am sure that the synthesis of my technical knowledge managerial aptitude with people orientation makes me suitable for required position & would help me play vital role in Growth of your esteemed organization.

Date: Signature:

Place:



Contact this candidate