SUMMARY OF EXPERIENCE

Quality Control Experience:

Twenty one years as Quality Control Manager or Coordinator for piping, pressure vessels, tanks, boilers, concrete, asphalt, and structures. I am familiar with the following construction codes.

Structural AWS - D1.1 Code, AISC Piping - ASME/ANSI B31.3 &B31.4API 1104&1107

Tanks - API - 620 & 650 Pressure Vessels ASME Sect VIII Div. 1 & Div. 2

Boilers - ASME Section I Power Piping - ASME/ANSI B31.1

Concrete & Asphalt -ASTM’s & ACI Construction Material - ASME/ANSI, APL, ASTM, NACE

Certificates:

Lead Auditor ISO 9001:2008 (TPECS) – Certificate # 760****-*****

Troxler Compaction and Density Testing – Certificate # 565FE86K7L7H97_58012

Troxler Nuclear Gauge Safety Certification – Certificate # MH765F7HF6E678K_58002

Troxler Hazmat Certification – Certificate # MH765F7HF6E678K_58001

For the last 21 years, I have worked as a QC Manager or Coordinator and have been in NDE and performing Inspections for the past 31 years. See Work History section for job responsibilities and experience. On my last 8 projects I have been responsible for all subcontractor welder qualifications test, performance of site NDE, and reviewing all radiographic film.

Quality Coordinator for installation of piping of various locations in the Prudhoe Bay/BXP gathering centers and central compressor station. Have worked offshore as pressure vessel inspector for the repair and modification of two platforms for Unocal in Cook Inlet, Alaska. Inspector for the installation of H2S Tanks and lining, at B.F. Goodrich plant in Calvert City, Kentucky. Responsible for the supervision of all NEWS crews for two Louisville Gas & Electric Plants shutdowns. Coal generation plants, paper mills, petrochemical plants and refineries, aromatic plants and gas oil separation plants.

Iraq Rebuilding: 132 KV Power Lines for Quara Qush to Kurdistan “Erbil”. 132 KV Power Lines for Old Kirkuk to Debis. These Jobs were for the US Army Corp of Engineers.

Civil Experience:

Twenty One Years of Civil Experience in the following area of construction:

Nuclear Power Plants HVAC & Mechanical Systems

Refinery & Petrochemical Plants Roads & Major American Highways

Commercial Buildings Auto Plant Construction

Dams Bridges

Transmission Lines and Towers Military Base Construction

Worked as civil inspector, or as the chief engineer of surveying crews on these projects. This experience included organization of all surveying & material testing. Have performed the following civil test; soils testing (Sand Cone & Nuclear Density Test - Troxler) Concrete or Grout Cube Test’s (Cylinder or cube compression tests, asphalt testing and mechanical testing of structural materials; bend, tensile and charpy impact testing, etc.

Have performed vendor inspections of civil activities at fabrication facilities, painting facilities for structural steel, and evaluation of concrete batch plants. Reviewed and approved procedures for structural welding and administered welder certification program).

NDE Experience:

ASNT NDE level II in the following disciplines:

Radiographic Testing (X-Ray) Positive Material Identification (PMI)

Magnetic Particle Inspection (MT) Liquid Penetrant Testing (PT)

Ultrasonic Testing (UT) CAWI Certificate Number 03010794

Current RSO Certification

Responsible for supervision of NDE operation of up to 80 technicians during the construction of the Rayong Refinery. This included all scheduling of work arranging permits, scaffolding, monitoring radiation Safety, and controlling the radiographic testing backlog during construction activities.

Worked as a Radiographer or Radiographic Film Interpreter for over 16 years, and can write NDE procedures to ASME Section V requirements of RT, MT, PT, or PMI Testing. Have set up and administered programs to up grade the skills of Thai, and Expiate NDE technicians. Have trained NDE technician in how to work correctly and safely with radioactive Ir192 Gamma ray sources, and how to properly interpret radiographs. Have performed radiographs on piping systems, tanks, pressures vessels, pipelines, and structural components. Can perform NDE safety to any recognized Code or company specification.

Mechanical Supervision Experience:

Supervised the installation of piping systems and the settings of related vessels, pumps, and compressors. Can read structural mechanical P & ID PEF and isometrics drawings. Can plan and schedule work and execute plans by others to complete projects on schedule. Can follow critical path schedules, and have worked to CPS plans. Responsible for work performed by mechanical subcontractors and monitored construction activities on refineries and chemical plants. Organize work well and in conformance to required construction codes, and project drawings or specifications. Have worked as piping supervisor for pipeline installation, starting with receiving material through hydro testing, painting and/or insulation.

August 2019 to January 2021

GCGV (Exxon Mobil) Site Quality Lead

Monitor site inspection activities and testing, bolt torqueing, NDE, coating, painting, electrical and civil activities, hydro’s, line cleaning and reinstatement.

Implementing the Construction Surveillance Program. This includes revising the standard Surveillance checksheets to be project/discipline specific.

Monitor key activities, facilities and construction equipment including third party civil labs, NDE subcontractors, calibration labs, measuring & test equipment.

Participate in site quality readiness reviews, contractor kick-off meetings, contractor quality workshops, etc.

Participate in ENL/CCO (Client Construction Oversight)/SNGT Audit programs.

Review and/or approve Contractor’s/Subcontractor’s quality plans, procedures, ITPs, inspection & test records, and calibration certificates.

Manage quality problems (NCR, CAR, etc.). Report and escalate quality problems to the proper level of QA and Construction Management for appropriate resolution.

January 2012 to 2019

Odoptu II Stage (Exxon Mobil) (Sakhalin Russia) Site Quality Coordinator (SQC)

Monitor site inspection activities and testing, bolt torqueing, NDE, coating, painting, electrical and civil activities, hydro’s, line cleaning and reinstatement.

Implementing the Construction Surveillance Program. This includes revising the standard Surveillance checksheets to be project/discipline specific.

Monitor key activities, facilities and construction equipment including third party civil labs, NDE subcontractors, calibration labs, measuring & test equipment.

Participate in site quality readiness reviews, contractor kick-off meetings, contractor quality workshops, etc.

Participate in ENL/CCO (Client Construction Oversight)/SNGT Audit programs.

Review and/or approve Contractor’s/Subcontractor’s quality plans, procedures, ITPs, inspection & test records, and calibration certificates.

Manage quality problems (NCR, CAR, etc.). Report and escalate quality problems to the proper level of QA and Construction Management for appropriate resolution.

October 2009 to 2011

COE & AD Pipeline (Exxon Mobil) (Sakhalin Russia) Site Quality Coordinator (SQC),

Monitor site inspection activities and testing; bolt torqueing, NDE, coating, painting, electrical and civil activities, hydro’s, line cleaning and reinstatement.

Implementing the Construction Surveillance Program. This includes revising the standard Surveillance checksheets to be project/discipline specific.

Monitor key activities, facilities and construction equipment including third party civil labs, NDE subcontractors, calibration labs, measuring & test equipment.

Participate in site quality readiness reviews, contractor kick-off meetings, contractor quality workshops, etc.

Participate in ENL/CCO (Client Construction Oversight)/SNGT Audit programs.

Review and/or approve Contractor’s/Subcontractor’s quality plans, procedures, ITPs, inspection & test records, and calibration certificates.

Manage quality problems (NCR, CAR, etc.). Report and escalate quality problems to the proper level of QA and Construction Management for appropriate resolution.

June 2008 to 2009

GPPL (ExxonMobil Pipeline Sabine Pass Texas) Site Quality Coordinator (SQC), WS-1 & WS-2

Assessments of completed CVR Checklists, Advise and inform site Quality Manager of issues, status and metrics, Promote Quality Awareness throughout the site, Write ITP’s and Check Sheets, Verify welding parameters have been followed and complied according to Site Specifications and requirements. Insure PT Inspectors are submitting quality reports as required by the CSP. Develop the Quality portion of site close-out reports. Closure of NCR’s and CAR’s, Monitor the PT evaluation on x-ray films, PT, MT, UT and AUT. Monitor site inspections carried out at the Interconnect Sites.

December 2007 to June 2008

CNRL Oil Sands Project (Technip Italy S.p.A.) Fort Mc-Murray Canada (Alberta)

Site Quality Manager:

Complete and compile Turnover Documentation for all Systems. Including, Civil, Concrete, Assembly of the Steel Structure’s, Piping, Electrical and Modules. Monitor daily activities carried out by Technip Italy S.p.A. Inspector’s. Verify that Contractor PCL is following there ITP and compiling the required Documentation as the activities are on-going. Meet with the Client on a weekly basis and address any outstanding issues that may arise in a timely manner. Submit RFI’s and Closure of NCR’S and CAR’S.

October 2006 to November 2007

GPLNG Sabine Pass Texas: (Exxon Mobil)

Sr. Quality Inspector:

Installation of 5 LPG Gas Tanks includes all Pipe Racks and Ship Slip area. Monitor CB&I Inspectors to insure that the Project requirements are being carried out correctly. Monitor Welding activities, Coating, Tie In’s, Cathodic Protection, FOC.Review x-ray films and report to API-620, ANSI B31.3 and Section IX requirements. Pile driving, Coating and Welding activities. Including, Civil, Concrete and assembly of the Structure’s.

Jan-2006 to September-2006

Sakhalin Island EPC II ExxonMobil:

Sr Quality Inspector:

Installation of 24" Oil and Gas Lines from Val II Island portion and Dekastri "Russia". Monitor Moody, NSNL, MRTS and TSB Inspectors. Insure that the GO

And SNIP Russian requirements are being carried out correctly. Monitor Welding activities, Coating, Tie INS, Cathodic Protection, FOC.Review x-ray films and report to ISO 1384 requirements. Communication Tower BVS-09, Pile driving, Coating and Welding activities. Including Civil, Concrete and assembly of the Structure. Hold Meetings with the Inspectors on a weekly basis.

October-2004 to Jan-2006

Bishkek Kyrgyzstan

Mamas Air Base Operation Enduring Freedom

Quality Manager:

Project activities include the following items. Construct and Build 20 Dorms for the USAF. Includes Concrete placement, Steel Structures Erections, Electrical Installation, and Main Power Grid. Main Water Supply Lined for the Host Nation “Bishkek, Kyrgyzstan”.

July-2004 to October-2004

Old Kirkuk to Ibis Iraq:

Site Quality Manager:

The Tasks were to Monitor the Construction activities for the Building of 132 KV Transmission Lines and Erection of Towers. Civil works included Concrete Pours and Backfilling. The Completion of Documentation and the Handover to the Client Corps of Engineers. March-2004-to June 2004

Erbil to Quara Qush Iraq 132 KV Power Transmission Lines

Quality Supervisor:

Supervise Contractors, Elta and KEC. The Tasks were to Monitor the Construction activities for the Building of 132 KV Transmission Lines and Erection of Towers. Civil works included Concrete Pours and Backfilling. The Completion of Documentation and the Handover to the Client Corp of Engineers. The Job was done on time and received a Grade of 95%.

June-2002- to June 2003

JUPC Project Jubal Saudi Arabia

Quality Supervisor:

Supervise 10 FAL/United Inspectors performing various tasks on site.

Duties include Road and Civil Construction’s, Welding and NDE Inspection’s, Hydro Testing, Electrical and Instrumentation. Reviewing job specific ITP's for the Construction process. Reviewing of Method Statements.

Construction of various Sub-Stations, Control Buildings, Warehouses and Training Facilities, Assembly of Pipe Racks, Boiler Foundations 4 in total, Concrete pours in various site locations including the foundations for ACBI Tanks, Nesma, ABB, SBG and Yanbu Steel. Construction of Off Sites Sleeper Foundations for Armco and Royal Commission areas, Installation of Piping for various RC Corridors, Performing Welders tests for Contractors, SBG, ABB, ACBI, MMG, NESMA and Yanbu Steel. Carrying out Visual and NDE site Inspections, Including Shop Inspections for the Construction of ACBI Prefabricated Storage Tanks, MMG Piping Fabrication, SBG Piping Fabrication and Yanbu Steel Tanks. Reviewing NDE, RT Films, PMI, MPT, PT and UT Reports for final acceptance. Review Quality Verifying Documentation prior to Turnover Group acceptance. All duties are included but not limited to on-going Construction.

September-2000 - June-2002

Fluor Daniel Eurasia

Caspian Pipeline- Astrakhan and Kropotkin Pump Stations “Russia “

Quality Supervisor:

Supervisor of 6 SGS Inspectors and 5 Sub-Contractor Inspectors. Pipeline running from Kazakhstan Border towards Kalmekea total Kilometers 330

Duties include, Road and Civil constructions, Welding and NDE Inspection’s, Hydro Testing.

Areas worked include the Communication Tower, Pump House Construction and Pump alignments. Fire Fighting Pump House, Fire Fighting Foam Generator Building, Mainline Pump’s, Electrical Systems, Boiler House Re-Vamp, Diesel Fuel Storage Tanks and Line’s, Modifications to existing site Buildings to CPC/FD design’s, Interior Road Construction and Exterior Road Construction activities, Compiling all completed Turnover Documentation Systems for hand over to Start Up and Commissioning Team.

June 2000 - August 2001

Fluor Daniel Eurasia

Caspian Pipeline - Astrakhan, Russia.

Quality Supervisor:

Supervisor of 2 expatriates & 8 SGS Inspectors.

Duties include removal of existing valves replacement. Removal of existing road crossings and instrumentation of new Piping and Casing.

Horizontal Directional Drilling on Volga River Crossing and Hydro testing.

Reconstruction on 2 Pump Stations: 1) at Astrakhanskaya PS; 2) at Komsomolskaya PS. Hydro testing and documentation reviews.

Installations of dirt road crossings over existing pipeline, installation of signs, compaction tests and concrete testing. Installation of shelters and foundations for new Ball Valve units.

Monitoring X-ray crews and reviewed according to Russian standard SNIPs and AP-1104.

Carry of current GOST Certification for Supervision Status.

Yanpet Expansion Project

Yanbu AI-Sinaiyah, K.S.A

Quality Supervisor:

Supervisor of 7 expatriates & 21 subcontractor inspectors, duties included construction of 2 new boilers, revamps of 4 existing boilers. Pouring of concrete on various pipe rack foundations and concrete slabs. Welder’s test for various subcontractors under Fluor Daniel supervision. Placement of equipment and alignment procedures per project specification. Weld map and hydro test pack clearance for daily hydro testing. Hot-tap and cold-tap, golden weld procedures. Testing of valves for hot-taps prior to installation. Construction of numerous buildings new and existing extension. Placement of the asphalt paving on various existing plants’ roads. Supervise 4 personnel working to ITP’s and work packages. Working with client and subcontractors in order to expedite work to stay on schedule. Upon completion of Utilities and Offsite duties, transferred to polymers area. Duties included review of hydro test packs, mechanical packs, and civil packs. Prior to packages turnover to client (Yanpet).

ALMATA (May 1997 to February 1998)

BHP Steel Plant

TOC Chemical Plant

QA/QC Manager:

Responsible for all quality documentation for fire prevention systems. This including welding procedures, welder qualifications, material control documentation, (drawings) document control, hydrostatic testing of all lines, cleaning, painting of all pipe, punch listing all system, and gaining client (Siemens) approval of all work, and the turn over of all quality documentation.

SGS (THAILAND) LTD (December 1996 to May 1997)

Thai Lube Oil Project

PMI Tech & Supervisor:

PMI testing alloys material to drawing specification. Coordinated testing activities and submitted reports to the client Samsung, JGC.

MANNESMAN (June 1996 to October 1996)

Singapore Aromatics

Area Supervisor:

Supervisor for the installation of piping equipment. Over three hundred craft personnel worked under my supervision. The work in my area was completed on time, and ahead of schedule. Every critical path milestone was completed ahead of schedule, and this lead to early completion of hydrostatic testing, flushing and cleaning system etc. This lead to substantial cost savings.

RAYONG Refinery Company Limited (February 1996 to April 1996)

Rayong Refinery Co. Ltd.

Banchang, Rayong, Thailand

Project Manager & Superintendent:

Supervised five expats and two hundred workers. Work consisted of the following: pouring concrete roads and all testing and documentation of concrete pours, construction of perimeter fence, removed all temporary buildings, and restoration of the site after construction activities was complete.

THE REFINERY CONSTRUCTOR (March 1995 to February 1996)

MapTaPhut, Rayong, Thailand

Senior Construction Inspector/NDE Supervisor:

Night Supervisor for all NDE activities for the construction of the RCC’s 160,000 Br/day MapTaPhut refinery. Over 20 NDE crews worked under my supervision during the construction of the refinery. My job to be sure all work was performed safely and that top priority welds were radiograph to minimize impact on the construction schedule. (See attached reference letter).

Jan 1993 to Feb 1995

Technical Welding & Inspection (TWI)

Supervisor & NDE Level II:

Managed companies NDE Services department. This included administration of company’s radiation safety program.

FLUOR DANIEL INC (September 1993 to February 1995)

Lead NDE Radiographic Testing Technician:

This was for the expansion of San Dose Chemical Plant, performed radiography, radiographic film interpretation, and all required NDE.

TECHNICAL WELDING & INSPECTION INC. (October 1991 to September 1992)

Supervisor & Level II:

Supervised and performed NDE services for inspection of boilers, pressure vessels, piping and structural components, for chemical plants, paper mils, pipe lines, and Power Plants. Some clients are Air Products, GAF, BF Goodrich, Sterling Chemical Westvaco Paper Mill, Willamette Paper Mill, Texas Gas, United Cites Gas, Louisville Gas & Electric, and TVA & Southern Illinois Power.

ARCTIC SLOPE INSPECTION SERVICES, INC (June 1990 to December 1991)

Quality Manager:

Responsible for the implementation of R-Stamp pressure vessels repairs an fabrication of U-Stamped pressure vessel repairs and fabrication of U-stamped pressure vessels for Unocal’s offshore Monopod & Steel Head Platforms in the gulf of Alaska (Cook Inlet). Worked with the Hartford Steam Boiler A. I. and was responsible for all materials documentation, supervised an in house welder certification program, and the NDE Inspection Program.

ALASKA PETROLIUM COMPANY

Quality Control Inspector:

Inspector for maintenance and casual labor contracts for Arco’s facility at Prudhoe Bay, Alaska. Worked with APC and ARCO/QA coordinated NDE activities and made sure all necessary inspection took place in accordance with Arco’s specifications and National Code requirements. This covered NDE for corrosion detection, Hot-Tap location and welding quality for all field or shop welding.

Technical Welding & Inspection Services, Inc. (August 1984 to 1990)

Level I & Level II:

Worked on many construction and maintenance contracts while in training and after obtaining my Radiation Safety, Level II and I certifications. During this time I went through the company’s training program that was approved by the US-NRC for radiation safety, and later worked as the company’s radiation safety officer. I worked with and trained by several ASNT Level III.