Engr. Vivek Rajendran

Electrical Engineer - Substation

Phone (Cell): +974-********

Email: *************@*****.***

OBJECTIVES / PROFESSIONAL SUMMARY:

Aim to deliver in the field of Electrical power System, Erection, Testing & commissioning, Operation & maintenance, and design of Electrical system. Further advancements in future regarding to this and to Up-Grade myself as a Professional by using Training, Experience & Knowledge to meet the challenges of the modern times and to enhance the success of your organization.

PROFESSIONAL EXPERIENCE:

Employer: Tractebel Engineering Gmbh, Doha Qatar.

Duration: June 2019 to Continue

Position: Electrical Engineer - Substation

Activities:

KAHRAMAA Consultant for 400/220/132/66/33/11kV substation Erection, Testing, Commissioning & Energization.

Erection, Testing, Commissioning & Energization of EHV / HV / MV / LV Substation Equipment like Bus Bar, Power Transformer, Transmission Lines (OHL & UGF), Shunt Reactor, Capacitor Banks, Auxiliary Transformer, CT, VT and Circuit Breaker up to 400kV in all KAHRAMAA Network.

Review SAT reports, FAT reports, Type Test Reports, Substation common Setting Calculation, CT / VT adequacy reports of substation equipment.

Directly coordinate with Contractors Site activities on behalf of KAHRAMAA.

Inspection for Substation Control System (SCS) / Substation Automation System (SAS).

Inspection of Erection, Testing, Commissioning & Energization of EHV / HV / MV / LV Switchgear AIS / GIS.

Perform Differential and REF Stability of Transformer during commissioning work.

Highlighting all scheme problems to design dept. for both LCC and RP schemes.

Manage and Implement KAHRAMAA safety standard for commissioning activities.

Employer: Qatar General Electricity & Water Corporation (Kahramaa), Doha Qatar.

Duration: February 2017 to May 2019

Position: Electrical Substation Engineer

Activities:

KAHRAMAA Commissioning Team (KCT) member for 400/220/132/66/33/11kV substation Commissioning & Energization.

KAHRAMAA Certified Senior Authorized Engineer to Issue Safety documents like Limit of Access (LOA), Permit to work (PTW), Sanction for Test (SFT), Circuit Isolation & Earthing Certificate (CIEC), NOSP.

Certified Senior Authorized Engineer for switching / Operation of Switchgear AIS/ GIS at all voltage level at KAHRAMAA substations Network.

Commissioning & Energization of EHV / HV / MV / LV Substation Equipment like Bus Bar, Power Transformer, Transmission Lines (OHL & UGF), Shunt Reactor, Capacitor Banks, Auxiliary Transformer, CT, VT and Circuit Breaker up to 400kV in all KAHRAMAA Network.

Having experience of in KHARAMAA stand by call attending & trouble shooting investigation during fault tripping.

Review SAT reports, FAT reports, Type Test Reports, Substation common Setting Calculation, CT / VT adequacy reports and Commissioning check list before energization of substation equipment.

Directly coordinate with Contractors and Consultant for Commissioning activities on behalf of KAHRAMAA.

Involved KHARAMAA Operation & Maintenance for release and restore of Bus bar, Circuit and transformer feeders for periodic maintenance and issuing safety documents.

Commissioning of Substation Control System (SCS) / Substation Automation System (SAS).

Maintenance of 400/220/132/66/33/11kV substation Equipment’s and Communication between system control for issuing safety documents.

Inspection, Commissioning & Energization of EHV / HV / MV / LV Switchgear AIS / GIS.

Perform Differential and REF Stability of Transformer during commissioning work.

Highlighting all scheme problems to design dept for both LCC and RP schemes.

Manage and Implement KAHRAMAA safety standard for commissioning activities.

Conducted LOA and PTW interview for various contractors working at KM network.

Reference Projects:

1. 132/66/11kV Wakrah substation KHARAMAA QATAR. (Main contractor SIEMENS WLL)

2.132/33kV RAF METRO substation KHARAMAA QATAR. (Main contractor NCC QATAR)

3.66/11kV Al Soudan South substation KHARAMAA QATAR. (Main contractor L&T QATAR)

4.66/11kV Al Mergab Street substation KHARAMAA QATAR. (Main contractor NCC QATAR)

5.66/11kV Rawdat Al Khail substation KHARAMAA QATAR. (Main contractor L&T QATAR)

6.132/11kV Al Wukair-1 substation KHARAMAA QATAR. (Main contractor SIEMENS WLL)

7.132/11kV Al Bahya substation KHARAMAA QATAR. (Main contractor SIEMENS WLL)

8.66/33kV LRT BPS Central substation KHARAMAA QATAR. (Main contractor ALSTOM)

9.132/11kV Al Wukair-11 substation KHARAMAA QATAR. (Main contractor SIEMENS WLL)

10.66/11kV Al Mashaaf substation KHARAMAA QATAR. (Main contractor ETA)

11.132/11kV Al Thumamah Central substation KHARAMAA QATAR. (Main contractor SIEMENS)

12.132/11kV Birkat Al Awamer-4 substation KHARAMAA QATAR. (Main contractor NCC QATAR)

13.66/11kV Wakrah South substation KHARAMAA QATAR. (Main contractor SIEMENS WLL)

14.132/11kV Umm Al Seneem-1 substation KHARAMAA QATAR. (Main contractor SIEMENS WLL)

15.66/11kV Lusail Marina-4 substation KHARAMAA QATAR. (Main contractor L&T QATAR)

16.66/11kV Lusail North substation KHARAMAA QATAR. (Main contractor L&T QATAR)

Employer: Al-Fanar Testing & Commissioning, Al-Riyadh, Kingdom of Saudi Arabia.

Duration: April 2013 to February 2017

Position: Senior Testing & Commissioning Engineer

Working for Protection, Testing & Commissioning activities of EHV, HV, MV and LV, Utility Power Transmission substations & Distribution substations of Saudi Electricity Company- NATIONAL GRIDS (SEC- NG) and Oil and Gas Industrial substations of ARAMCO

Reference Projects:

1.380kV GIS Substation Qurrayah by Samsung SA Ltd, Dammam, KSA.

2.220/132/6.6kV Saudi Aramco Oil and gas field Shaybah, Dammam, KSA.

3.132kV/13.8kV GIS Substation (8179) Al Nazeem by ABB Co. Riyadh, KSA.

4.400MW Ras al Khair Power Plant, SEPCO III, SWCC-Ras al khair Power & Desalination plant, KSA.

5. Offshore Marjan Gosp-2 Saudi Aramco project, MCDERMOTT, KSA.

6.380kV / 132kV / 13.8kV Substation Al omran by Altoukhi, Al Hofuf, KSA.

7.115/13.8kV Substation KFD by Alfanar Co, Dammam, KSA.

8.115/13.8kV Substation West of Second DIE by Alfanar Co, Dammam, KSA.

9.115/13.8kV Substation NADA by AlSharif KEC co. Ltd, Dammam, KSA.

10.380/132/33kV Substation TABARJAL Alfanar Co, KSA.

11.132/13.8kV Substation AL MUBARAKIYAH by Alfanar Co, KSA.

12.115/13.8kV Substation AL FADHILI by Al arab contracting company, Al Jubail, KSA.

Project Activities:

Plan for activity schedule for Testing & commissioning.

Project Coordinator for substation testing & Commissioning Activities.

Dealing to group of engineers for testing & commissioning Activities.

Managing to substation testing equipments and arrangement as per project requirement.

Perform scheme modification and design review of Electrical drawings of substation.

Perform Differential and REF Stability of Transformer during commissioning work.

Perform Overall stability of Feeder during Commissioning work.

Perform Differential stability of BUS BAR during commissioning work.

Perform commissioning of GIS equipment’s up to 400kV and LCC panel scheme.

Perform commissioning of Transformer Protection relays & scheme.

Perform commissioning of Feeder Protection relays & scheme.

Perform commissioning of LCC control relays and Panel scheme.

Perform commissioning of Capacitor Bank Protection & control relays & scheme.

Perform commissioning of ACSE control relays and panel scheme.

Perform commissioning of Load Shading Protection relays & scheme.

Perform commissioning of Motor Protection relays and Motor control (MCC) panel scheme.

Perform commissioning of LV ACDB, DCDB Protection relays and panel scheme of ATS/ ABTS.

Perform commissioning of GIS & AIS substation equipment like CT, VT, CB and scheme.

Perform commissioning of Fault Recorder, DSM, and Metering panel scheme.

Perform Primary Injection, Stability & Sensitivity testing of Transformer, Bus bar and TEE Protection.

Perform Testing & commissioning of All type of Substation protections like Transformer Differential, Line Differential, Distance, Motor Protections, Over current, Overvoltage, Under voltage, Under frequency, Restricted Earth Fault (REF), Breaker Failure, Over flux, Directional Earth Fault(DEF), negative sequence, zero sequence, TEE Protection etc

Perform Testing of Panels equipments like Auxiliary relays, Tripping Relays Annunciates.

Perform verification of Protection signaling, commands, alarm, and status for Substation Automation System (SAS)/ SCADA of 380KV GIS substation.

Perform review of Cable schedule for protection panel, LCC Panel and Switchgear panel.

Perform activity of Clearing SNAG list / Punch list of substations.

Expertise:

Hand on Experience of Advance Protection & control Relays of ABB, SEL, ALSTOM, MICOM.

SEL SEL411L, SEL487V etc.

ABB RED670, REL670, RET 670, REC 670 and REF615, RET615 etc.

ALSTOM/ MICOM P546, P543, P632, P443, P442, P142, P141, P139 etc

Hand on Experience of below configuration software’s,

PCM 600 Version 2.6

MiCOM S1 Agile version 1.3.0

MiCOM S1 Studio

AcSELerator Analytic Assistant.

Meter CAT for energy meter calibration.

Employer: VOLTECH ENGINEERS PVT LIMITED (VEPL) CHENNAI, India.

Duration: June 2010 to March 2013.

Position: Senior Testing and Commissioning engineer

Reference Projects:

1. 400/220 kV GIS PGCIL Navsari Site, M/s. ABB Ltd, (MH) Client:ABB Ltd. Customer: Power Grid Corporation of India ltd.

2. 400kV GIS Korba M/s SIEMENS Ltd. Customer: Bharat Aluminium Company Ltd.

3. 132 kV Switchyard, M/s. Devi Powers Ltd. Customer: SEL Manufacturing Company Ltd.

4. 132 kV Switchyard, M/s. SIEMENS Ltd. Customer: Vandana Energy & Steels Pvt Ltd., Korba.

5. 33/11 kV S/S, M/s. Adroid Electricals Ltd. Customer: Torrent Power Ltd., Ahmedabad.

6. 2x135 MW Thermal Power plant, M/s. ABB Ltd. Customer: Aryan Coal Beneficiations India Ltd.

7. 5 MW Solar Power Plant, M/s. SIEMENS Ltd. Customer: Insolare Energy Pvt Ltd, samakhiyali.

8. 1*4.7 MW Thermal Power Plant, M/s. SIEMENS Ltd. Customer: KIC Metaliks Ltd., Durgapur.

Project Activities:

Installation Testing & Commissioning of Substation Equipment of 400kV, 220kV and 132kV including protection scheme (Distance, line differential, synchrocheck, transformer differential, restricted earth fault, Overcurrent, breaker failure, high and low impedance Bus bar protection), comprehensive Testing & Commissioning of power/auto transformers, CT, PT, Switchgears, surge arrestors, capacitor banks, AC/DC panels, battery banks, battery chargers, energy meters, Earthing.

Perform Transformer Differential Stability Test and REF Stability test.

Control and protection schematics.

Testing & commissioning activities of 400kV GIS ELK 3C, 220kV ELK14 equipment’s, Scheme through. Cable schedule preparation, Co-ordination Protection Engineers to check the numerical relays. Test report preparation and team leader. Double bus bar scheme.

To deal with financial and administrative issues related to staff.

Commissioning activities, Bus bar Differential stability,P441 Distance protection, P633 transformer protection, P341 backup protection scheme.

765kVBreaker, isolator, Earth switch scheme through and commissioning activities, also involved site as built drawing preparation.

PROFESSIONAL TRAININGS:

Training on Switching, Operation, Maintenance and Safety by KAHRAMAA DOHA, QATAR. (3Month)

Complete understanding of Qatar Electrical power system generation, transmission and distribution and control system.

Understanding of organization structure of KAHRAMAA.

Orientation of functions of all departments of KAHRAMAA.

Safety standard of operation, switching and maintenance of KAHRAMAA substation.

KAHRAMAA Certified Senior Authorized Engineer to Issue Safety documents like Limit of Access (LOA), Permit to work (PTW), Sanction for Test (SFT), Circuit Isolation & Earthing Certificate (CIEC), NOSP.

Training on HYOSUNG 800MVA, 40MVA transformer and 66kV GIS Doha Qatar.(5Days)

Complete understanding of 800MVA,40MVA transformer

Design and advanced features.

Complete understanding of Hyosung 66kV GIS and testing of

GIS like contact resistance measurement, Breaker and DS/ES timing measurement,

Installation of GIS.

ACADEMIC/ PROFESSIONAL QUALIFICATION:

BACHELORS IN ELECTRICAL ELECTRONICS ENGINEERING (3 years)

BANNARI AMMAN INSTITUTE OF TECHNOLOGY affiliated to

ANNA UNIVERSITY, Sathyamangalam, India.

2010 Passed out and Percentage 73.87 %.

DIPLOMA IN ELECTRICAL ELECTRONICS ENGINEERING (3 years)

THE KARUR POLYTECHNIC COLLEGE affiliated to DOTE, Karur, India.

2007 Passed out and Percentage 92.08 %.

HONER AND AWARDS:

Senior Authorization Engineer Certificate by KAHRAMAA QATAR, 2017.

Qualified Testing & Commissioning Engineer by Saudi Electricity Company, 2015.

IT SKILLS:

Computer Information System & computer software’s expert.

Operating Systems: Windows 98/2000/XP/7/Vista (Installation + Troubleshooting).

Proficient in MS Office Automation and Internet Tools.

Programming Concept of languages.

• Assembly • C • C++

Proficient in Engineering Software’s as below

• PCM 600 Version 2.6 • AcSELerator

• MiCOM S1 Agile version 1.1.0 • MiCOM S1 Studio • GE Enervista

KEY SKILLS:

Leadership Skills (Always group leader of Labs work, Project tasks and trainings).

Managerial skills like planning, organization, and time management.

Teamwork Skills

Excellent communicational skills.

Ability to work effectively with multi-cultural nationalities.

Goal- oriented and self motivated.

Hardworking.

Good language knowledge of English, Tamil, Hindi.

PERSONAL INFORMATION:

Father’s Name: Rajendran.P

Date of Birth: 03rd June 1988

India Passport No. S9831928

Driving License Qatar, Saudi Arabia, India.

Marital Status: Married

Nationality: India

Current Address: Doha, Qatar.

REFERENCES:

Adequate reference would be furnished if so desired.



Contact this candidate