Post Job Free

Resume

Sign in

Aramco Construction Manager

Location:
Riyadh, Saudi Arabia
Posted:
February 28, 2023

Contact this candidate

Resume:

Mohammed Ghulam Mohiedeen,

Strategic-Program-Project-Construction-

QA/QC Management

MOBILE PHONE +966*********

E-MAIL

advl1u@r.postjobfree.com

JEDDAH, SAUDI ARABIA

P.O BOX 5452 JEDDAH 21422

Personal Information

Marital status: Married (3 dependents)

Nationality: Saudi

D.O.B: 05/12/1981.

Home land: Jeddah, Saudi Arabia

Skills

Quality assurance & quality control awareness.

Oversee all activities for projects, including architectural, structural, civil, MEP, interior, and infrastructure from design to execution.

Oversee, manage, plan, schedule, coordinate & evaluate the performance of all different disciplines, trades & activities.

Management potential.

Reporting to higher managements & directory

Review all project documentations.

Computer literate (AutoCAD, Adobe Photoshop, Revit architecture, PrimaveraP6, PROLIANCE Trimble, ACONEX, SAP, Microsoft project &MS office). Good communication skills, working part of a team and leadership. Drafting, shop drawings & IFC drawings.

Design concept & development.

Dealing with clients, consultants, contractors and suppliers. Inspections, presentations, researches, studies and reports. Site supervision, surveillance & consultation.

Demonstrates a thorough working knowledge of recognized building codes & Intl. standards. Background in SA standards & procedures E.g. Engineering standards, TIPs & checklists

(SATIP, SAIC, SATR, SAES…)

Sub-contractors management & handling.

Project handing over to client or consultant.

Objective Achieving goals & self-development by taking the full advantage of maximized studies, experience & effort.

Education & Courses • Education degrees :

'2007 King Abdulaziz University, Faculty Of Environmental Design, Jeddah. Bachelor Of Architecture.

1st place award in a design competition by The National Commission for Wildlife Conservation & Development (Eco-tourism lodges in Farasan Islands).

'2000 Dar Al U'loom Schools, Jeddah.

Pure Science Major High School Certificate.

Courses attended & professional memberships :

Apr. 2020 Financial Management Performance, Online Course. academy.monshaat.gov.sa

Oct. 2018 CSSYB Six Sigma Yellow Belt Certification Exam, Online. 6Sigmastudy.com

Mar. 2017 Communication & Corporate Culture, Jeddah. MEGA be exceptional institution.

Dec. 2015 CSSGB ASQ Certified Six Sigma Green Belt, UAE, Dubai. ASQ American Society for Quality (No.2015/11036) 35 CPE NASBA credits

[Statistics]

Jan. 2015 HSE Orientation Program, Jeddah.

AECOM Training & Technical presentation, Tatweer School Buildings Projects. Dec. 2014 Saudi Quality Council, Jeddah.

Member of Saudi Quality Council (membership #13331). Jun. 2014 SAE Institute, creative media education, Jeddah. Diploma Certificate in MAYA® General Architectural Studies. Aug.2010 Saudi Council of Engineer’s, Jeddah.

Member Of Saudi Council Of Engineers (membership #34431). Jan.2009 Saudi Binladin Group, Jeddah.

Safety Workshops For multiple disciplines In Construction Field. Dec.2008 United States Of America, Department Of Labor. 30-hrs Training Course In Occupational Safety & Health Administration (OSHA) In Construction (membership#600317362).

Personality Profile

Sophisticated, mature, serious, hardworking, quick learner, creative, problem solving, good in teamwork or individually, skillful in management & leadership, organized and sticks to plans & deadlines, excellent design capabilities, strong interpersonal skills, excellent analytical skills, strong computer skills, excellent communication both written and verbal, strong team player with ability to balance conflicting priorities, take timely decisions, great understanding of policies, procedures & work methods, excellent organization skills, vigilance &detail oriented. Languages Arabic & English fluency.

Work experience [Sep 2014 – Present] T.B.C Tatweer Building Company, Under Tatweer Education Holding Company, (state-owned). Jeddah, Saudi Arabia. Project’s info, data & scope of work:

Tatweer Education Holding Company has initiated the process of establishing a new subsidiary to carry out a strategic role to take over responsibility for managing the construction and maintenance of school buildings for the Ministry of Education (MOE), and to enable the MOE to focus on its core educational business.

The Building Agency of MOE is currently responsible for managing, constructing, and maintaining schools throughout the Kingdom and it caters for the physical infrastructure and maintenance needs of approximately 30,000 schools.

The new subsidiary – Tatweer Building Company – will take over the role of Building Agency on a phased basis over a number of years. This initiative will ensure faster execution of construction projects and will enhance the quality of school buildings and maintenance to meet MOE’s standards. Client/Proponent: Ministry Of Education.

Consultant/Partners: AECOM.

Stakeholders: Power, water providers, Jeddah Municipality & any related governmental sectors.

[Jun 2021 – Present]

Job title: Program Manager.

Department: Western Region PMO Projects Control.

Responsibilities:

• Being the appointed Management representative for Project Controls.

• Managing all project controls activities across the organization.

• Developing and coordinating regional policies and procedures for all the project controls processes.

• Ensuring that all project controls team members are aware of their roles and responsibilities.

• Managing Project Controls resources in line with budget.

• Motivating and supporting Project Controls team members.

• Providing appropriate level of training and career development across the Project Controls team.

• Preparing guidelines, status reports, and presentations for Management.

• Reviewing contractual obligations and ensure that the project execution plan, work plan and deliverables are in accordance with requirements.

• Ensuring the project controls activities and deliverables meet the requirements of the project.

• Ensuring that planning, cost control and estimating procedures are adhered to, and that all corporate systems are set up and executed correctly to support the specific needs of the project.

• Supervising and coordinate work performed by the Project Controls Team.

• Assigning resources to project work.

• Coordinating with accounting for invoicing to Clients.

• Managing and administrate the QMS related to Project Controls.

• Supporting Manager of Projects assisting with corporate and administrative duties as required.

• Creating an environment suitable for ongoing development of Project Controls team members.

• Ensuring continual improvement of the Project Controls processes and procedures.

• Assigning team workload ensuring timescales are adhered to Facilitating training and professional development to Project Controls staff.

• Ensuring that lessons learned are captured and implemented.

• Attends high-level Strategic, CEO & VP top management meetings.

[Jan 2019 – May 2021]

Job title: Senior Project Manager.

Department: Western Region PMO.

Responsibilities:

• Regional Revenues, Target & Profit control, PMO, Projects cost control, Projects/contracts Admin, Commercial, Finance & accounting, team lead & head of multiple committees.

• Manage all construct ability issues in the regional office and liaise with Regional Head

& Quality VP.

• Prequalify contractors and other service providers on quality, environmental policies, and qualifications.

• Supervise the execution of quality compliance audits of projects and operations.

[Jan 2018 – Dec 2018]

Job title: Quality control & HSSE Sr. Project manager Department: Western Region Operation & delivery.

Responsibilities:

• QC & HSSE Western region projects, applying company's process, procedures & ops manuals, Auditing & Coaching.

• Update and maintain quality assurance in relation to execution of work & quality plan.

• Report any misalignment to quality standards to Regional Head & Quality Director.

• Prepare quality control/assurance plan, ITP & progress reports.

[Jan 2017 – Dec 2017]

Job title: Quality Assurance Manager

Department: Western Region Operation & delivery.

Responsibilities:

• Compliance of regional projects, updating company's manual & auditing.

• Oversee Quality, processes & procedures for a construction package of projects worth 800 million SAR 68 public schools spread all over Western region main cities.

[Sep 2014 – Dec 2016]

Job title: Project Manager.

Department: Western Region Operation & delivery.

Responsibilities:

• Co-founder of the regional operation office & core team builder.

• Acting Project Manager for construction package (public schools) worth 230 Million SAR contract.

[Jun 2014 – Aug 2014]Alandalus Property, Projects Department. Alandalus Square Project. (STAYBRIDGE INTERCONTENINTAL SUITES HOTEL) Jeddah, Saudi Arabia.

Project’s info, data & scope of work:

Pilot project in the city center area of Jeddah estimated cost billion Saudi Riyal, Consists of 5 towers with different height (28, 33, 36 & 43 multistory) residential, commercial, mixed-use and leisure facilities :

- Alandalus Business Avenue OFFICES TOWER.

- Alandalus Residence Tower.

- Alandalus Hotel Tower STAYBRIDGE INTERCONTENINTAL SUITES HOTEL. Linked to Alandalus Mall build on shop-and-stay concept offering variety of rooms (studio, two bedrooms & Three bedrooms). A Hotel management agreement was signed with IHG

(Intercontinental Hotel Group) to operate & manage the property as the 1stStaybridge suites in Saudi Arabia.

The 28th floor Tower which is a 5 star IHG Brand “Stay Bridge Suites “ (post tension slap) is Almost finish and under preopening testing and operation process with highest quality specification.

Client/Proponent: Alandalus Property. IHG (Intercontinental Hotel Group) Consultant/construction manager: Alandalus Property. Stakeholders: Power, water, telecommunications providers, Jeddah Municipality Job title: Assistant Project Manager.

Department: Projects & Development.

Responsibilities:

• Managing the Existing Company property, developing and extend the range of investment upon the yearly plan.

• Managing the Pre-construction phase, all Tender Preparation and tender analysis with strong Negotiation &Managing the Procurement stage.

• Developing budgets, schedules and plans for the various elements of the project and Study the Value Engineering.

• Control Suppliers & Subcontractor Data base.

• Meet with the operator standards with the criteria of design, understanding on the entire lifecycle from concept to design and architecture.

• Timely execution of the project within Cost & Quality parameters. Analysis.

• Supervision of contract award activities for engineering, as well as equipment, material procurement & construction.

• Assigning responsibility for executing project plans to key subordinates.

• Monitoring and reporting weekly, monthly to key stakeholders and V.P.P&CEO on the progress of all projects activity within the program, solving problems, and tracking procedures.

[Aug 2008 – May 2014] Saudi Binladin Group, Architecture & Building Construction Division.

[Apr 2013 – May 2014] KAIA King Abdulaziz International Airport Project. Tender #422, Jeddah, Saudi Arabia.

Project’s info, data & scope of work:

The KAIA Project will be a landmark economic development for the region and the nation, capitalizing on the Kingdom’s ambitious growth plans and the Authority’s efforts for Saudi Arabia to enhance the status of Jeddah as an international hub.

The Master Plan embraces development in three phases to 2035, when ultimate capacity could reach 70 - 80 Million Annual Passengers (MAP), still using the existing three runways.The strategy follows a "just in time" approach, to ensure the correct balance of capacity, quality of service and cost, providing, in effect, a new airport created within the existing boundary. One of the advantages of such a large existing land area is to allow the plan to proceed. Main project elements include :

- Passenger Terminal Complex, 670,000 sq m floor area, a state-of-the-art facility spread over a spectacular twin crescent footprint.

- 46 contact gates, 94 boarding bridges, including double deck A380 access.

- Class-leading lounges, airside hotel, catering and retail facilities.

- Internal Automated People Mover linking the passenger processors and the international hub.

- Transportation Centre with integrated rail station, for seamless travel connections.

- Sophisticated Baggage Handling System, over 60 km of belts.

- State-of-the-art Air Traffic Control Technology with Landmark Control Tower over 136m high.

- Taxiways, roads, tunnels, utilities networks, load centers, support facilities on a scale to match the main buildings.

- Fuel tank farm and hydrant network.

- Plant nursery and garden centre to serve the airport and the broader community. Client/Proponent: GACA regulatory and operational Authorities, including KAIA Operations.

Consultant/construction manager: DAR Al-handasa (Shair& partners). Stakeholders: Government Control Authorities: Customs, Immigration and Security, Royal Saudi Air Force (RSAF), Saudi Arabian Airlines (SV), All other airlines operating at KAIA, General Aviation Operators, Cargo, Catering and Ground Handling companies, Saudi Aramco and fuel handling companies, Ministry of Transportation, Saudi Railways Organization (SRO), Power, water, telecommunications providers, Jeddah Municipality

Job title:Sr. Project Engineer.

Department: Project Management Team - QC Department. Responsibilities:

• Maintaining project execution plan, health and safety plan, quality control and other documents.

• Lead, supervise project & site engineers team (20-25 personnel).

• Working with the Construction Services Director, establishing the program requirements for all areas of the project and monitors site staff performance.

• Planning, directing, supervising and controlling the execution of technical, fiscal and administrative functions of the project and the site team.

• Assigning responsibility to key subordinates in their respective fields of expertise.

• Providing input to performance reviews and developing plans for subordinates.

• Working with other managers, project engineers and discipline Heads to develop budgets, schedules and plans for the various elements of the project.

• Tracking project manpower, look ahead schedules & progress charts (daily-weekly- monthly)

• All drawing submittals are in line with TBC specifications and any deviation from standard is highlighted and addressed.

• To implement all quality procedures, PQP, tests, ITP, specs & standards on project.

• Edit & review all quality documentations.

• Assuring approval for all shop drawings & IFCs.

• Client, consultant, contractor interference & representative at site.

• Management potential role to apply, comply & maintain quality of construction at site by inspections & surveillance.

• Oversee building constructions & coordinating between different trades, disciplines & subcontractors from earthworks, infrastructure, tunnels, bridges, structures, civil works, precast up to finishes & architectural.

• Responsible for maintaining strong relations with all project stakeholders.

• Assists in the introduction of new methods of construction, equipment, and machinery to improve the construction process.

• Assists Procurement in selecting and evaluating subcontractors and suppliers Assigned & designated zones, areas:

- Iconic main Masjid (J-100).

- Fuel farm (J-400) facility includes 8 massive fuel tanks with its supporting facilities buildings.

- South Military access gate (J-200).

- Load center A (C-110) facility includes: Central switch hall - District cooling plant - office building - generator plant - service gallery - workshop - potable water tank station - fuel tank station - diesel tank station - fire water pump station - External substation.

- PREMCO precast factory, Hamadaniya (as company representative) for all precast elements of the project.

[Jan 2013 – Mar 2013]Saudi Binladin Group, Architecture & Building Construction Division. Makkah Holy Haram 3ed Expansion Project & Surrounding Areas. Security Buildings - PLOT-3, Makkah, Saudi Arabia. Project’s info, data & scope of work:

The new project is being implemented on a 4,00,000 square meter area.It will add an additional prayer space for 1.2 million worshippers. It is estimated that real estates and properties expropriated for the project were valued at about 40 billion Saudi riyals.King Abdullah's expansion includes expansion of the external areas of the Holy Mosque, as well as restrooms, passageways, tunnels, and other ancillary facilities. The service area has also been developed, including the air conditioning and electricity plants and water supply facilities which all serve the Holy Mosque. Upon its completion, this latest expansion project will increase the area of the Holy Mosque to one million square meters. Security Buildings in Shamiyah, a residential and administrative complex that provides accommodation to 19,400 officers and soldiers of the Ministry of Interior in addition to all support facilities and services. 300-bed hospital with staff housing. It is composed of 4 plots (plot 1, 2, 3 and 4).

Client/owner: Ministry of finance.

Consultant: DAR Al-handasa (shair& partners).

Technical committee: Ministry of higher education. Stakeholders: Government Control Authorities, ministry of interior, defense, security, Holy Makkah municipality, Ministry of Hajj. Job title:QA/QC deputy manager/supervisor.

Department: QA/QC Department.

Responsibilities:

• Acting as QA/QC supervisor in charge of PLOT-3 (8 high-rise multiuse towers) coordinating works includes site preparations, rocks cutting, blasting, geotechnical advise & survey support analysis along with other disciplines & trades.

• Generate, reply, Track & keep records of all quality documents such as inspection requests, nonconformity reports, logbook & Inspection checklists.

• Lead and direct a team of Inspectors (10-20 inspectors all disciplines)

• Ensure that adequate level of technical support is provided to project teams during execution and commissioning phases to address constructability issues.

• Review and approve major revisions for technical drawings.

• Ensure the issuance of all required permits, construction licenses and certificates

(assist project teams and service providers).

• Perform any other duties as determined by QA/QC Manager.

[Aug 2008 – Dec 2012]Saudi Binladin Group, Architecture & Building Construction Division.

King Abdullah University of Science & Technology Project, PHASE II, Thuwal, Saudi Arabia.

Project’s info, data & scope of work:

King Abdullah University of Science and Technology (KAUST) is an international, graduate-level research university. It is more like a full-gated city itself. It is divided into 2 phases, 1st phase includes all university campus, colleges, educational buildings & main library. Residential, community & support facilities under phase 2 of the project. With more than 2000 fully furnished & equipped residential units, between apartment buildings, town houses, attached & detached villas; Safaa Gardens, golf course neighborhood, Harbor District, shopping neighborhood Safaa Island neighborhood. Recreational centers, yacht club, marina bay support facilities as well as 3 main schools from early childhood, elementary & secondary. Laundry facility, firefighting station, gas station, clinic, administration building, post mail building, hotel & commercial complex.

Client/Consultant/Project construction manager: Saudi Aramco. Proponent: KAUST CX team.

Job title:QA/QC supervisor.

Department: QA/QC Department.

Responsibilities:

• Leading quality team (6-10 inspectors all disciplines).

• Contractor advisory.

• Generate, reply, Track & keep records of all quality documents such as inspection requests, nonconformity reports, logbook & Inspection checklists.

• Ensure that adequate level of technical support is provided to project teams during execution and commissioning phases to address constructability issues.

• Review and approve major revisions for technical drawings.

• Sign-off on mock ups for final implementation on the ground

• Ensure the issuance of all required permits, construction licenses and certificates

(assist project teams and service providers). E.g. Pre-Mechanical completion certification (PMCC) Mechanical completion certification (MCC) Client or consultant exception items list (EIL)

• Perform any other duties as determined by QA/QC Manager.

• Project handing over to client or consultant.

• Site Engineer due handing over period.

• Provide coaching to lower levels engineers and supervise their work to ensure proper transfer of skills and work performance as per standards. Assigned & designated zones, areas:

- Safaa garden neighborhood.

- Golf course neighborhood.

- Harbor District (Zone D).

- Shopping neighborhood.

- Safaa Island neighborhood.

- Early childhood school & International school.

[Aug'07 – Jul'08] Marwan Ashour Consultant Office, Jeddah, Saudi Arabia.

Job title: Senior Architect.

Responsibilities:

• Designer Architect.

• Generate & issue shop drawings, IFC drawings & 3d renderings.

• Client consultant representative.

• Contractor supervision & advice.

• Modifying & editing as built drawings.

[Apr'07 – Aug'07] Ahmed Hajjar Engineering Office, Jeddah, Saudi Arabia. Job title: Junior Architect (University co-up)

Responsibilities:

• Designer Architect assistant.

• Consultation & site supervision.

• Site survey & dealing with governmental bodies.

Voluntary & Seasonal Jobs:

MetroLine Company CRCC (China Railway Construction Company)

- MMM MashaerMuqadasa Metro (Makkah) operation & maintenance during Hajj season 1434.

- Waiting area Supervisor.

- 3 days intensive course in Railways operations, maintenance Organizations, management &HSE.

Airport Hajj Terminal Season 1434 (United Agent Office)

- Terminal tent hall operation & maintenance supervisor.

- Manage, control & guide pilgrims with their commissions.

- Loading & offloading luggage control operations.

- Passengers bus ticketing operation.

References,

Recommendation &

Appreciation Letters.

Upon request.



Contact this candidate