Post Job Free

Resume

Sign in

Auto Parts Delta Airlines

Location:
Jackson Field, CO, 80631
Posted:
February 26, 2023

Contact this candidate

Resume:

GANGA SIVAPANDIAN

Status: US Citizen

advk3d@r.postjobfree.com

Mobile: 248-***-****

SUMMARY

Technology management include 20 years of 12+ full suite of SAP implementations and system architecture in SAP R/3, ECC, Fiori and S/4HANA. Expert in PP, VC, PS, PPM, PLM, QM, MDM, and integration to SD, MM, WM, CO and MES. Working on requirements gathering, blue print, configuration, testing, and support for all manufacturing types.

Business experience include 10 years of industrial product design, manufacturing, supply chain management. SAP industry verticals aerospace, engineering, automotive, IM&C, life sciences, mill products and chemicals.

Experience with project management and ITIL tools working for SAP Labs, SAP Americas and a consulting major.

PROFESSIONAL EXPERIENCE

Client: Element Solutions Inc., (Specialty chemicals, media products and equipment’s) Feb’2018 – Current

ECC, S/4HANA- PP

SAP architect for production planning and partly QM for 6 plants and 24 warehouses in the USA, Canada and UK. Completely reviewed, updated or modified SAP forecasting, MRP, production, master data including BOM structures, work centers, Routing, tank properties, shopfloor order management, capacity management improving production and quantified operational efficiencies by industrial engineering work studies by 30%. Inventory reductions by 20% from the earlier excel, lotus notes and manual operations.

Implementing SAP S/4HANA 2021 with MDM after the complete review of 40+ features including the set up for production version, and engineering change management for a global roll out in Germany.

Integrated a new acquisition in Minneapolis from older SAP 4.B to ECC. Carried out gap analysis, configured new design including capacity planning to manage order schedule and changes to be effective in the production floor.

Added new warehouses, moving inventories and materials to move from one plant to other and integrating them to the newer areas for production in compliance with local laws and for general value addition for the corporate.

Implemented a migration project for a European acquisition from Chempax ERP to SAP. Full suite of SAP PP is implemented in a fast tract project end project from definition to deployment and currently under support.

Re-design variant configurator for equipment’s structures for a major manufacturing plant in UK that are in the same SAP/ NA instance. Worked on RFGen connectors to SAP for consignment stocks, bar coding, label management and on MES systems to SAP.

Client: Arcelor (Steel-Metallurgy-Chemicals) (Consultant) Aug17 – Jan’18

SAP S/4HANA 1610 SAP Fiori, SCM, PP/APO, PP-PI, VC, SD, MM, QM

Functional configurator and Technical Architect using the latest on-premise SAP S/4HANA 1610, and Fiori web screens for role-based business processes, and workflows for steel plants using in PP-PI processes and MII/MES integration. Working on two fast paced projects that include a lead time alignment across S4/ HANA and plant systems with focus to internal, external, quality, warehouse and transport times. Working on as-is, to be, gap analysis, and blueprints. Core member demonstrating S4/HANA proof of concept for a complex chemical process.

Working on SAPUI5/Fiori for PP/APO, SD, MM, and MES functionalities with middle ware integrations to plant systems that include outbound and inbound ABAP interfaces using IDOCs, BAPIs, RFCs to/from Middleware, and data flow enhancements. Team lead in a multi-cultural team as an enabler connecting business users, and technical groups. Evaluating S/4 HANA application selections and the best solutions from possible alternatives. Assisting in early adoption of new business procedures resulting in system improvements and value add to the tune of USD100 million per year. Carrying out development of documentation, training, and communication plans.

Leading test cycles, defect resolution, issue escalation, resolution of master, transaction issues including UI /UX

Client: Oetiker (Automotive) (Consultant) Dec16 – July’17

SAP PP, Batch, Traceability, WM and HUM

Providing intensive training in all areas of PP, Batch, Traceability, WM and HUM functions, supporting configuration efforts, unit testing and integration scenario testing in the USA and Canadian plants. Working with central teams from Spain and Germany on global template and rollouts to local plants. Completing end to end in planning, manufacturing, scheduling, execution, inventory and warehouse functions with common master data, component traceability, batch, bar code labels with complete handing unit management for automated production

Configuration support, training and testing of warehouse management for a flexible, automated support in processing all goods movements and in maintaining current stock inventories. Data and transactions of warehousing processes to define and manage complex warehousing structures, optimize material flow using advanced put away and picking techniques, processing goods receipts, goods issues and stock transfers.

Client: Sagem Avionics/Aerospace (Consultant) June 2014 – 2016

SAP Consultant PP

Implementation and application support lead for ‘Demand to Supply’ for a newly acquired aerospace entity by Sagem - manufacturer of aircrafts components for a civil, military, and commercial use, with alignment to a global template. Savings accrued to the tune of $48 million per year, by utilizing lean processes and better inventory management.

Implementation, Testing and Application Support:

Led value stream mapping sessions with an aim of eliminating all forms of waste, based on lean principles. .

Conducted blueprinting and configured forecasting, sales and operations planning, capacity planning and leveling, demand management (requirement quantities and delivery dates), planned independent requirements, customer requirements, planning strategies (make to order, make to stock), material requirements planning, master data, information system, KANBAN, JIT, production planning (for discrete, repetitive run schedule header), process orders, production order confirmation using bar codes and labels for completed production order before close.

Configured settings for planning strategies, consumption logic, MPS, MRP, materials master, MRP groups, MRP types, MRP plant parameters, MRP run, special procurement keys, creation indicators, planning horizons, lot size calculation material types, material master screens by material types, MM- consumption based planning, automatic purchase requisitions from MRP, goods movements, configuration of functions such as order creation, order release, availability check, order confirmation, purchasing documents, classification system for variant configuration, batch management, BOM, work center and resources, task lists, routings, planned order administration, planning and optimization, order execution, with availability check and scheduling control.

Supporting analysis of production order information system, missing part information, correcting faulty goods movement (COGI), stock overview (MMBE), movement types, production order fulfillment, purchase requisition, and purchase orders. Worked with developers on gap analysis through PRICEFW objects including a custom design for contract flow downs to identify and track special military orders during MRP outputs.

Client: Becton Dickson / Medical Device (Consultant) August 2011 - April 2014

SAP Lead - SAP Integrated Supply Chain Management (PP/APO/MES/QM/WM)

Delivered on a global re-implementation initiative for 40 plants, across the USA, Canada and Europe. Achieved Wave1 and Wave2 go lives successfully. The implementation led to the improvement of client satisfaction from 75% to 95%, lowering inventories by 20%, and increased in resource utilization up by 15%.

Configured Demand to Supply, customized RICEFW with developers, worked with landscape management, on system conflicts, managed data migration from legacy source to SAP ECC 6.0 for a complex re-implementation.

Wrote system requirements specification (SRS), functional unit testing (FUT), operational/performance qualification (OQ/PQ) and data verification matrix to comply with FDA requirements.

Managed batch-oriented process manufacturing, with classification system using characteristics, class, and values assigned to material, for dynamic selection for a finished product, with production parameters for material quantity calculations to change component quantity. Configured master recipes for production with large quantities, and routings for assemblies. Worked with European developers on custom XSteps for process orders.

Executed master data load strategy in a dynamic, fast paced environment, ramping up data accuracy from 35% to 88%, and close to 99% within three months as a data load representative.

Drove stake holders in finalizing SAP- MES integration scenarios that include, sending production order object details from ECC to MII, and back. Worked on consensus building for finalizing configurations set up in ECC - logical systems definition, set up IDOC listeners to send /receive IDOCS push from ECC to MII with LOIPRO, processing rule editor for call Transaction, auto triggers of IDOC to MII system, and log processing.

Working with discovery lab recipes (BOM) with PI sheets (Process Instructions master recipe Process to adjust production run at various phases using custom codes), worked with developers from Spain managing shop floor feedback through legacy integration for production quantity confirmation and receipt to stores.

Integration test lead with mandate to carry out positive and negative test cycles, defect resolution, data governance for critical master data, coordinate test issue closures during integration during test cycles

Coordinated with business and IT rollout teams throughout Becton Dickinson subsidiaries (Discovery Labs and Instruments division), for a robust integration testing, user training, and post go live support for six months.

Performed application management support for PP/APO/MES’S functionalities earlier configured, and tested before go- live. Become a Go to person for Demand to Supply business processes and Application support.

Leading MM, IM and WM functions including - Consumption-Based Planning, Purchasing - Purchase Requisitions, RFQ and Quotation, Purchase Orders, Conditions and Price Determination, Vendor Confirmations, Release Procedure, Inventory Management -Goods Movement, Goods Receipt, Goods Issue, Return Delivery, Stock Transfer and Transfer Posting, Reservation, Physical Inventory, Batch Management, Serial Number Management, Stock Determination, and Managing Special Stocks’ integration to APO, MES, MM, WM, and LE.

Siemens AG (Berlin, Dusseldorf, Orlando) October 2010 - August 2011

SAP PPM Architect – PP, PS, CS, QM, HR, & Team Center

Conducted blueprint workshops for engineering segment scenarios for generators, turbines, and steam units relating to customer engineering, modifications/ upgrades, and research & development project business.

Configured SAP PPM with underlying PP, working with PS coordination and PPM design for buckets, item (projects), capacity planning, engineering scheduling, value flow controlling (FI/CO) status collection, upload / download of MS project templates/data, integrations to DB for Org. structure, skills/job catalogue and KPI’s.

Worked with technical counterparts for developments, enhancements, statuses, inbound/outbound interfaces, authorizations, forms, work flow, conversion, and business scenario testing relating to engineering orders.

Kelly Global (Outsourcing Consulting Group) Oct 2009 - Sept 2010

SAP Technology Architect – ECC6.0 and Integration

Trusted Advisor for top management, and program sponsors from Johnson & Johnson, Nike, and Delta Airlines to ensure the global SAP operations are an acceptable IT solution for the companies and their long-term enterprise needs.

Provided technical recommendations for complex process requirements and retail solutions at the enterprise level using ECC 6.0 suite of applications, with hardware and software integration to technologies from HP, and Oracle.

SAP America August 2006 - Mar 2009

SAP Application Support Lead - ECC Escalations, OSS Support, Spot Work and Integration

Resolving SAP America Client issues within the scope of SAP ECC Escalations, Spot Work, Integration issues in a variety of SAP operating conditions for multiple industry verticals.

NN Inc., (High precision Automotive bearings) – Audited project implementation with emphasis on best practices, and integration. Scope: SD, PP, PM, Variant Configuration, MM, WM, QM, SCM, and PS.

Paccar Auto Parts (Auto parts / Kenneth trucks) – Advised team across multiple plants in PP, MM and KANBAN.

John Deere (Agricultural equipment) - Supported integration of plant operations across the US, Europe, and BRIC relating to supply chain management. scope: SCM, PLM, SD, MDM, XI, MII, GTS, CRM, SRM & BI

Absopure (Bottling products) - Streamlined processes for forecast management.

Kraft Heinz Co (Food) - Implemented MDM, and provided testing support for CWM attributes and weight factors (product shrinkage), for batch products. Scope- MDM, SCM, QM, PLM, MII, SNC, SRM.

Bemis Company (Packaging- mill products) - Worked on special custom-made classification enhancements.

Tyco Valves & Controls, Canada (Engineering projects) – Blueprinting for Engineering Procurement, Storage and Construction. Scope: PS, PP, PM, ECM, SD, MM, WM.

3M (Technology) – Facilitated SAP presales team, and the client understanding of Plant to Produce processes.

ExxonMobil Chemicals (Capacitors for automotive batteries) – Demonstrated proof of concept, for manufacturing types relating to mill products with consultants from Europe for a SAP implementation in Japan.

Fujitsu Consulting August 2002-July 2006

Client: DaimlerChrysler Sept 2004-July2006

SAP Architect and Application Support SCM - PLM

Streamlined $450 million per-year prototype vehicle test, and global supply chain activity, to save the organization $100 million per year using SAP Variant Configuration and Project Systems Applications.

Configured special characters for projects, project coding mask, creating status profile, project profile, project types for WBS elements, field selection for work breakdown structures, maintaining network types, number ranges for network, control key definition, and availability checks for materials.

Carried out Variant configuration related settings for Super BOM, Order BOM, Characteristics, Classes, Values and Assignments to material and a single point of contact for Material Master.

Introduced SAP Applications to Detroit Diesel manufacturers relating to SAP Demand Management, Materials Master, BOM, work centers, routing, and scheduling. Improving collaboration between OEM & Tier 1 Suppliers.

Worked with developers creating a web front end for vehicle test, scheduling, and vehicle administration.

Helped data migration, and consolidation of data from legacy systems, from Mitsubishi Corporation in Japan.

Collaborated with IT and Business, to continuously deliver an effective business transformation through a smooth organizational change management process, with visibility to inventory and process simplification.

Provided hyper care and application support for PP-PS areas for four months for a smooth offshore transition

Client: Yazaki NA (Tier1 Auto wire harnesses / Power Control Systems) July 2003- August 2004

Senior SAP SCM Consultant wire harnesses, power distribution and control systems,

Led SAP production planning implementation from initial product demo, kick off, blueprint, configuration, unit testing for sales and operations planning, capacity planning, demand management, MRP, materials master, BOM, Work centers, Routing, Scheduling and Manufacturing with Integrations to Product Costing.

Developed RICEFW documents, coordinated with stake holders, and other process teams on the integration points relating to costing and inventory process.

Client: SAP Labs/ERP Research & Development (Consultant) August 2002- May 2003

Senior Consultant – SAP All-in-One

Implemented SAP All in One - US localization project to ensure SAP best practices for various real time SAP application scenarios for automotive business. Tested automotive business configuration sets complying with due diligence procedures. Managed system conflicts, and system issues with SAP Germany.

Tested Automotive solutions for OEM with the following process -

oCreated independent requirements processing, maintained source list, material requirements planning, maintained scheduling agreement with schedule lines, shipping notification processing, goods receipt posting, displayed EDI inbound invoice, process invoice with three-way reference, and payment advice note.

Tested Automotive solutions for SUPPLIER with the following process -

oCreated supplier processes to receive customer scheduling agreement, process forecast delivery schedule for scheduling agreement, MRP, production supply with KANBAN and MRP for materials produced internally/externally, production supply with KANBAN and MRP for materials procured via stock transfers from the central warehouse/externally, repetitive production, backflusing for finished products, delivery processing, picking/create transfer order, transportation planning, shipment completion, shipping notification, process billing due list, billing document, payment advice note, payment advice note, open items display and posting incoming payment to complete the process.

Ernst & Young LLP. / Consulting at Goodrich Aero Structures/ PLM/SCM

SAP Research Associate (SAP life cycle model for manufacturing industries) June’1998-June’2001

Implemented SAP R/3 - A&D – PLM/SCM / PP (GPD) for complex logistic processes for an Aerospace & Defense requirement, with integrated planning, and scheduling with grouping, pegging, and distribution process.

Collaborated with SAP America and Druid in UK for developer support for this challenging first initiative within the industry providing solution combining PP/PS with grouping, pegging and distribution for Aerospace.

Created SAP life cycle model for manufacturing industries, covering all the phases with relevant templates to set up SAP technology competency centers. Developed policies and contract templates for service delivery governance models and audit procedures for global business efficiency boards auditing SAP implementations.

Identified appropriate technical scope, resource requirements for SAP projects, working with business and IT. Carried out global survey, research and analysis on large companies with SAP centers of competence and work on the details of hardware, software and networking needs.

Siemens Ag., India / Germany Oct 1990- April’1998

Senior Engineer - Supply Chain Operations and SAP support

SAP team member carrying out ‘as is’, ‘to be’ process, and gap analysis studies relating production, materials and costing. Carried out SAP process mapping, learned configuration of multiple modules, testing, prototyping, integration testing, and go live. Performing support for PP, MM, WM, QM, CO and PS and data control.

Education and Certifications

Diploma in Computer Management

Certification in Java Programming, with ABAP skills and Aptech Certified Computer Programmer

Diploma in Production Engineering with Statistics and Operations Research

Diploma in Electrical Engineering with Industrial Electronics, One-year Siemens Apprenticeship



Contact this candidate