Post Job Free

Resume

Sign in

Power plant Mechanical Engineer

Location:
Jaipur, Rajasthan, India
Salary:
35000
Posted:
February 21, 2023

Contact this candidate

Resume:

CURRICULAM VITAE

MADAN MOHAN SHARMA Om Shanti Sadan, Shiv Nagar, 798-***-****, 896-***-**** Mahadewali, Tonk advhdq@r.postjobfree.com Rajasthan- 304001

OBJECTIVE :

To make a significant contribution in a competitive environment where there is an opportunity for growth and flourish in profession. To use my strength, skills and potential effectively in the field and to achieve satisfaction through commitment, hard work & dedication.

WORK EXPERIENCE (13 years 06 months)

1. Project : Construction of Work of Water Supply Distribution Network Improvement

with House service connections for Non-Revenue Water Reduction and

Continuous Water Supply and providing sewer network with house

connections, Construction of Sewage Treatment Plant & allied works &

operation services of entire system for 10 year at Tonk (RUIDP Phase-III

Contract Package No. RUSDP/Tonk/04)

Project Cost : 379.65 Cr.

Client : Rajasthan Urban Drinking Water Sewerage and Infrastructure

Corporation Ltd. (RUDSICO, Govt. of Rajasthan)

Place : Tonk, Rajasthan

Company : Shah Technical Consultants Ltd., Mumbai.

(Project Management Design and Supervision Consultants)

Job Profile :

Excavation, Laying & hydrotesting of HDPE Distribution pipelines in the DMAs.

Excavation, Laying & hydrotesting of DI Feeder/Rising Main pipelines from PH/OHSR to DMA inlet.

Installation of Sluice valves, Circulating valves, Step valves, Scour valves, Bulk Flow Meter, Electro-magnetic flow meter.

Conducting Zero-flow test for the DMAs for water distribution network.

Conducting Disinfection test for the DMAs & OHSR.

Installation of domestic multi-jet water meters (Make-Dashmesh) at the DMAs.

Installation of Local Monitoring Panels at OHSR and Master control panels at SCADA building with LED Screen, Monitor, CPU and Printers.

Excavation, Laying & testing of HDPE DWC pipeline for sewer network.

Excavation, Construction & testing of RCC Manholes for sewer network.

Excavation, Installation & testing of RCC Inspection chambers for sewer network.

Construction of Property chambers with PVC-u pipes connected to inspection chambers and then to Manholes.

Flow Test & Deflection test of DWC sewer pipelines.

Installation & Testing of equipments at 4MLD STP at Soran Village.

Installation & testing of equipments at 16MLD STP at Molaipura village.

Construction of CC & BT roads in Trench & full width for water & sewer networks.

Designation : Support Engineer

Role : Project Execution

Duration : April 2021 to – currently working (1 year 9 month)

2. Project : Design and Construction of Water Supply Distribution Network for

Non-Revenue Water Reduction and Continuous Water Supply,

Construction of Reservoirs & Pumping Stations, Sewage Pumping

Stations and Sewage Treatment Plant in Jhunjhunu town. (RUIDP Phase-III)

Project Cost : 237.5 Cr.

Client : Rajasthan Urban Drinking Water Sewerage and Infrastructure

Corporation Ltd. (RUDSICO, Govt. of Rajasthan)

Place : Jhunjhunu, Rajasthan

Company : Shah Technical Consultants Ltd., Mumbai.

(Project Management Design and Supervision Consultants)

Job Profile :

Responsible for assisting the ACM with the preparation of variation orders.

Assisting the ACM with the evaluation of Contractors claim.

Quality control of works, verification of lines and levels, inspection of works.

Acceptance and rejection of the completed works.

Verification of contractors monthly estimates of the completed works and assisting the ACM in the preparation of Interim Certificates.

Conducting and keeping record of minutes of the weekly site meetings.

Preparing monthly Progress Reports.

Measurements & certification of the works done by the contractors at the site.

Excavation, pipe laying & Testing (HDPE & DI Pipelines) of Transmission and Feeder mains for Clear water Reservoirs and distribution mains for water distribution network.

Installation and testing of water supply House service connections (GI-HSC) with Multijet water meter installation (ITRON make) with ball valve.

Excavation, pipe laying and Testing of Sewer mains (Hydrotest, Flow Test, Deflection test using mandrel for DWC pipes for lateral, branch, main & trunk sewer pipelines) upto 16 MLD Sewage treatment plant.

Excavation, laying and testing of RCC sewage pipelines for sewerage network.

Manhole Leakage test, Flow Test conducted at site for Sewerage network.

Excavation, laying and testing of PVC-u pipes from property chamber to Inspection chamber and U-PVC pipe laying and testing from Inspection chamber to Manhole for sewerage network (Sewerage House service connections).

Installation and Alignment of Cable tray in trenches with cable dressing, termination with lugs and glands for Diesel generator(Cummins make), transformer and RMU panels (remote mechanical unit).

Erection and Alignment of Diesel generator, transformer, centrifugal pumps, Compressors.

Erection and Alignment of Electric motors in pumping stations.

Erection and Alignment of Sewage Pumps as per approved drawing at Main Pumping station at 16MLD Sewage Treatment Plant.

Erection and Alignment of Blowers in Blower room at Sewage treatment plant.

Installation of Chlorine Toners in chlorination building at Sewage treatment plant.

Installation of Coarse screen, fine screen, conveyor, sluice gates, decanter at Sewage treatment plant.

Erection of centrifuge pumps with pipeline installation in centrifuge building.

Installation of Bulk flow meter, Electro-magnetic flow meter, Sluice valves, Scour valves, Pressure relief valves and dismantling joints in water supply network.

Zero flow Test, disinfection of pipeline and DMA Commissioning for water supply pipelines network & House service connections with multi jet water meter installation.

Analyze NRW reports for commissioned DMAs for water supply.

Installation of lighting Panels with cable laying and termination.

Installation of VFD panels in Control room.

Installation of Metering panel in metering room.

Installation of Local push button station for operation of pumps in manual mode.

Installation and testing of scada software in Scada room at Pumping station.

Checking of Digital input (DI)and digital output (DO) from PC to PLC panel and PLC panel to field Equipment.

Designation : Support Engineer

Role : Project Execution

Duration : August 2017 to March 2021 (3 year 8 month)

3. Project : Supply, Erection,Testing and Commissioning of Ash Handling Plant for 6

units of 150 Megawatt Captive Power Project.

Project Cost : 180 Cr.

Client : Hindalco Industries Limited.

Unit : 900 MW CPP for Mahaan Aluminium Project, Madhya Pradesh.

Place : Mahaan, City: Bargawan, Dist: Singrauli, Madhya Pradesh.

Company : Macawber Beekay Ltd., Noida.

Job Profile :

Erection, Alignment and commissioning of centrifugal pumps, horizontal split case pumps, Vertical drain sump pump, Positive displacement pumps, Multi stage pumps, Reciprocating pumps, submersible pumps of Kirloskar, Flow more, sintech pumps, Warmen pumps, Grundfos pumps etc.

Erection and Alignment and laying of Pipelines for Pumping stations (MS,GI,DI,SS and Carbon steel pipes)

Installation and Alignment of Cable tray in trenches with cable dressing, termination with lugs and glands for Diesel generator(Cummins make), transformer and RMU panels.

Erection and Alignment of Diesel generator, transformer, GEHO pumps, Blowers, Compressors (Elgi make and Atlas copco make)

Erection and Alignment of Electric motors

Maintenance of Dome valve, Dump Valve, Dome type Vent valve, gate valve, Switch valve, Pneumatic Actuators, pneumatic cylinders, Slurry pumps (Single & Multistage pumps), horizontal split case pump, centrifugal pumps, etc.

Preparation of test reports of various test procedures like Non-Destructive Testing, Dye Penetration Test, Ultrasonic Test, Radiography Test, Magnetic Particle Testing etc. for welding of structure & pipelines.

Experience in Erection & Commissioning of EOT Cranes.

Exposure to erection, testing & commissioning of Cooling Water Pumps, Ash conditioner water Pumps, Seal water pump, Recovery water Pumps.

Painting of structures, equipments & pipelines with desired DFT as per painting schedule.

Designation : Engineer (Sites)

Role : Project Execution

Duration : March 2012 to July 2017 (5 year 5 month)

4. Project : Supply, Erection, Testing and Commissioning of Structure, Equipments

and pipelines at Mill building in Rosa Thermal Power Project (4 units of 300

Megawatt captive power project)

Project Cost : 256.00 Cr.

Client : Reliance Power Ltd.

Place : Rosa, Shahjahanpur, U.P.

Company : P & R Infra Projects Ltd., Chandigarh.

Job Profile :

Heavy structural fabrication & Erection as per approved drawing for Mill Building and Pipe racks.

Erection, testing & commissioning of Feed water pumps, Sludge pumps with motor installation.

Erection & testing of Steel Liner Pipes such as Auxiliary cooling water pipes, Raw water intake & Low pressure and high pressure Piping.

Preparation of test reports of various test procedures like Non-Destructive Testing, Dye Penetration Test, Ultrasonic Test, Radiography Test, Magnetic Particle Testing etc. for welding of structure, equipments and pipelines.

Erection of Economiser Pump, Clinker Grinder Gearboxes and Fluid coupling.

Experience in Erection & Commissioning of EOT Cranes.

Supervision of contractors work and quality.

Designation : Mechanical Engineer

Role : Project Execution

Duration : Oct 2010 to Feb 2012 (1 year 5 month)

5. Project : Erection, Modification & Construction of Jawaharlal Nehru Stadium

Project Cost : 100 Cr.

Client : CPWD New Delhi

Event : XIX Common Wealth Games 2010

Place : Lodhi Road, Pragati Vihar, New Delhi

Company : P & R Infra Projects Ltd., Chandigarh

Job Profile :

Welding of Steel coloumns and Tie beams of stadium structure using Metal inert gas welding (MIG).

Welding of Ramp with both side wall using shielded metal arc welding (SMAW) with 7018 and 6013 welding rods.

Erection of Mild Steel columns and Tie beams.

Load test of Stadium ramp.

Supervision of contractors work with quality

Making BOM (Bill of Material) from the drawing.

Designation : Mechanical Engineer

Role : Project Execution

Duration : July 2009 to Sept 2010 (1year 3 month)

QUALIFICATION :

Professional Qualification

B.E. (Mechanical) with Honours.

Institute of Engineering & Technology, Khandari Campus, Agra in 2009.

MBA in Operations Management.

Jaipur National University, Jaipur in 2020.

Educational Qualification

B.Sc (PCM) from D. S. Degree College, Aligarh in 2005.

Intermediate from A.E.C.S. Narora, CBSE Board in 2002.

High School from A.E.C.S. Narora, CBSE Board in 2000.

INDUSTRIAL TRAINING :

Training in Narora Atomic Power Station, Dist.- Bulandshahr, U.P. in Turbine Generator system, Feed water system, Cooling water pump house, Chiller & Compressor, Welding and Fabrication for 6 weeks in 2008.

SOFT SKILLS :

MS Word, Excel, Power Point Presentation, Email, Windows.

Excellent Communication Skill – Both written & verbal.

HOBBIES :

Reading Books & Listening Music

PERSONAL DETAILS :

Fathers Name : Shri. S. N. Sharma

DOB : 24th Sept. 1985

Marital Status : Married

Gender : Male

Language : English / Hindi

Permanent Address : 45, New Teachers Colony, GT Road, Aligarh, Uttar Pradesh.

It would be great experience for me to work with your prestigious organization, where I promise to incorporate my skills into your vision to forge an everlasting & fruitful relationship between us.

Date : 24.12.2022

Place : Tonk, Rajasthan (MADAN MOHAN SHARMA)

Notice period- 01 month



Contact this candidate