Resume:

US. CITIZEN

Afshin Monadjemi

Planner, Scheduler, Cost Engineer

MS Office Certified (Excel 2013)

***** ******* **** **** *****: 214-***-****

Apt# 336

Dallas, Texas 75243 Email: advejw@r.postjobfree.com Summary

Over Power 20 (Combined years of diversified Cycle) – Engineering, experience in Procurement project controls and and Construction. project mentoring in oil & gas (onshore) and Recent Refresher course for Primavera P6, Version 17.12.1 (March 2018) Recent PMP college course (March/ April 2018

Professional Certificstions, Training and Refresher Courses PMP continuing education course, Collin Community College, Frisco March/ April 2018 Primavera P6 fundamentals refresher online course, March 2018 MS Office Certified Specialist (Excel 2013), Jan 2019 OSHA10 Certification, Feb 2020

Power Safe certificates, Feb 2020

CPR/AED / First Aid Certification

QUALIFICATIONS

Accomplished and Motivated Project Planner/Scheduler, Master Scheduler and cost Engineer with more than 20 years of experience and a Bachelor’s Degree in Industrial Engineering (Planning and System Analysis).

• Involved in preparation and review of PEP (Project Execution Plan) and Project Controls structured procedures.

• Expertise in WBS development for large complicated EPC projects, Create activity list, recognizing and defining logical relations among activities, Resource assignment and levelling.

• Experienced in CPM (Critical Path Method) in Schedule Control and EVM (Earned value Management) in Cost Control.

• Maintaining and Updating of project schedules up to 7500 activities (EPC project for 6 gas trains gas refinery)

• Familiar with various disciplines’ (Civil, Steel and Concrete Structure, Mechanical (fixed and rotary equipment), Electrical, Instrumentation and Control) tasks in the project, ability to discuss them with relevant engineers and work groups/teams.

• Periodic Cost/Schedule reporting and Senior Management/Client presentations.

• Initiating/Managing and/or actively participating in periodical / special meetings as required.

• Creating 90 Day Look ahead schedule, 3WLA (3 week look ahead) detailed schedule based on last status of project(s) program.

• Delay Reports and WFA (Work Front Analysis).

• High performance in multi project / subprojects management responsibilities.

• Ability switch between two deferent tasks/ projects rapidly.

• Familiar with and committed to Safety Rules in jobsite. Working close with HSE department as an additional daily task.

• Willing to travel and/or relocate.

• Technical Proficiencies: Primavera (P3 and P6 up to version 8.6), MS office specially Excel, PowerPoint, Access, Outlook and Word, MS Project, Milestone-Pro, FoxPro, Databases and Databank, Lotus.

Business EXPERIENCE

The Home Depot (6804 Dallas) Aug, 2020 – Now

Special Services Associate / Head Cashier

Performing Special orders material delivery for projects in the store using ESVS software. Daily Check in and Returns activities.

The Home Depot (6804 Dallas) Mar, 2019 – Mar, 2020 Special Services Associate

Performing Special orders material delivery for projects in the store using ESVS software. Daily Check in and Returns activities.

Self Employed December 2016 December 2018

As some extended time is required for applying for job and being updated about the job market and techniques, Self Employed jobs help to provide some free time. Nebraska Furniture Mart –Texas (The Colony) Feb, 2015 – July, 2016 Customer Pickup Specialist

Nebraska Furniture Mart is the largest home furnishing store in North America selling furniture, flooring, appliances and electronics. NFM was founded in 1937 by Belarus-born Rose Blumkin. (visit: www.nfm.com ) This has not been my professional job, but there have been a lot of new experiences and lessons to learn with it.

Professional EXPERIENCE

Utility Construction Services (UCS)

Title: P6 Scheduler Working Period: Feb, 2020 – August, 2020 UCS is a construction company involved in transmission lines and substation construction projects. My Duties in UCS:

Implement and maintain P6 projects for bidding and construction projects Attend in preconstruction meetings and manage UCSs schedule expectations Compile project schedule submittals as needed

Build level 1 schedules to assist estimation team

Work with on-site project teams to meet schedule expectations Following company’s policies to work safe, reliable, cost effective and productive Toeroek Associates

Title: Project Controls Analyst Working Period: July 2016 – Sep 2016 Working with Toeroek Associates in a short period of time, as they needed. Despite of job title, it was not a project controls professional position but a Project Accounting in a very detailed level. Leaving this job has been preferred.

Bechtel Corporation – Assignment to Australia working period: May 2012 – September 2014 Title: Planner /Scheduler – GLNG Project

Bechtel is a global leader in engineering, procurement, construction, and project management. (Visit www.bechtel.com )

My Duties in Bechtel:

– Permanent Industrial Buildings at the presence of Subcontractor:

• Receive daily and weekly reports, verifying them and discussing probable issues with S/C scheduler.

• Preparing by- case summary reports bringing important and critical subjects.

• Periodic Site Visits.

PROFESSIONAL EXPERIENCE (Continued)

• Weekly meetings with S/C subcontractor.

• Receive Monthly and weekly updates of Buildings P6 program, reviewing it, and creating one-month occurred delay reports.

• Getting involved in 3 week look ahead preparation, concrete quantity weekly schedule, main Level3 schedule revising were Additional tasks to permanent buildings scheduling.

– Permanent Industrial Buildings as the subcontractor left the site before finishing the project

• Negotiating with Engineering and Construction management in order to Develop Bechtel detailed program in P6 for Permanent Industrial Buildings.

• Developing and finalizing the program.

• Weekly updates of the program based on updated QURR and performing Earned Value analysis.

• Creating Permanent Buildings’ weekly report, going on with weekly updates and populating the report every week and preparing Critical Path reports using P6 information

– After completion of Permanent Buildings

• Weekly updating Piping installation and Electrical cabling special reports for all Areas based on quantities, TEAMWORKS and SETROUTE databases have been the source of actual quantities for these reports. Planned quantities were retrieved from WFA and 3 Week look ahead schedules.

• Modifying and improving the report structure, including new tables and curves in the reports when necessary.

• Creating and going on with weekly updates of grouting and Piping Test package Development plan curves VS actuals using TEAMWORX data.

• Creating and going on with weekly updates of EEHA inspection plan curves VS actuals (based on

“Tags in SU systems”).

• Working close with Scheduling supervisor, Mr. Robert Vaughn for developing the 3 Week Look ahead Supplementary Package and going on with the weekly update.

• Monthly updating of GLNG critical milestones table. Developing a method for Schedule Adherence table update using P6 programs and going on with Monthly updates. This method does not require the use of “xerFileParserBuilder_2007” and the update normally takes 20~30 minutes together with doing some quality check on the result. PetroPars LTD working period: January 2000 – December 2011 Title: Planner Project Controls lead Engineer (last position) – South Pars Gas Development Projects Petropars is a specialized, company that seeks to establish a global status as a developer of exploration, exploitation and production in upstream, downstream and peripheral industries of oil and gas. (Visit www.petropars.com)

My Duties in Petropars:

Involved in the following EPC projects in Petropars:

– Phase 12 of South Pars Gas field Development, from May 2010 up to Dec, 2011 as Project Control and Planning Lead Engineer. The value of this project is about 4,000,000,000 $.

• Using daily/ weekly / monthly reports received from contractor, merge them and prepare integrated monthly and weekly reports as well as integrated daily report when necessary. (Excel and Word)

• Reviewing Progress curves and tables in the reports and analyzing actual progress trend in each discipline / work center. Trying to find reasons for delays and report to project/site manager. (Excel)

• Reviewing Monthly WPA for each contractor and improving progress figures according to reality. Finalized figures would be used for contractor invoice

• Reviewing monthly updates of project time schedule with special care of critical paths and delays. (P3 and P6)

• Supervision on other planners and cost engineers

• Attending in all project management, Interface mnagement, Scheduling and risk management meetings

• Coordinating between Project Controls and other Engineering and Construction disciplines. PROFESSIONAL EXPERIENCE (Continued)

– South Pars Phases 6, 7 and 8 from Aug 2003 – May 2010 as Planning and Project Control Engineer. I involved in SPGD 6, 7& 8 from beginning of construction works up to pre-commissioning and commissioning either for the main project (Gas Plant) or subprojects (Power Plant, SPIFON, NIB) The value of this project is about 2,900,000,000 $

• Reviewing Monthly WPA for each contractor and improving progress figures according to reality. Finalized figures would be used for contractor invoice.

• Helping in Cost Control and Cost Analysis reporting.

• Reviewing monthly updates of project time schedule with special care of critical paths and delays.

• Daily Site visits

• Preparing weekly reports

• Staying in contact with subcontractors to coordinate project activities which must be expedited.

• Preparing and presenting project progress status presentations for top management visitors.

• Helping project management team at the step of CLOSING THE PROJECT.

– South Pars Phase 1 from Jan 2000 to Aug 2003. The value of this project is about 1,200,000,000 $.

• Monitoring overall progress figures of Engineering, Procurement and Construction.

• Visiting Engineering offices, vendors’ manufacturing shops and construction site (Data gathering).

• Collaborating in preparation of EPC project monthly reports.

• Updating project time schedule according to collected data. MAPNA working period: January 1996 – December 2000 Title: Project Controls Engineer

MAPNA is an Iranian enterprise which operates in the area of construction and development of thermal power plants under EPC scheme, independent power plants (IPP), oil and gas as well as rail traction projects.

(Visit www.mapnagroup.com)

My Duties in MAPNA:

Involved in Six Combined Cycle Power Plants project as Project Controls Engineer

• Monitoring overall progress figures of Engineering, Procurement and Construction.

• Working closely with CAs (Contract Administrators) and CMs (Contract managers) in order to keep vendors’ schedules in track with overall project goals.

• Visiting Engineering offices, vendors’ manufacturing shops and construction site (Data gathering).

• Collaborating in preparation of EPC project monthly reports.

• Updating project time schedule according to collected data.

• Participating in monthly and weekly meetings.

Oil Industries Engineering and Construction (OIEC) working period: July 1991 - January 1996 Title: Project Controls and Panning Engineer

Oil Industries Engineering & Construction (OIEC) is one of major companies in Iranian Oil industries. (Visit www.oiecgroup.com)

My Duties in OIEC:

- Bandar Abbas Refinery Construction (Site Office) From 1993 to 1996

• Daily site visits for data gathering

• Data entry and helping in reports preparation

• Preparing 3 week look ahead quantitative schedules

• Working closely with Site Technical Office to provide quantities

• Attending in weekly meetings and preparing Minutes of meeting.

• Preparing 3 month look ahead schedules using the master schedule in MS Project.

- Bandar Taheri Condensate Refinery Engineering from 1991 to 1993

• Data entry for updating project historical data banks.

• Helping project control manager to prepare reports. EDUCATION

- University: B.S in industrial engineering (Planning and System analysis) from Sharif University of Technology - Tehran, Iran 1985 – 1991.

Sharif University of Technology is the most reputable technical university in Iran and has been in close contact with MIT for several years. (Visit www.sharif.ir/web/en/)

- High School: High school diploma in Mathematics and Physics from Kharazmi High school Tehran Iran, 1977 – 1981

MAJOR CAREER ACHIEVEMENTS

• Had a good experience with Bechtel. Thanks all my colleagues and managers in GLNG.

• Stayed in job for two large EPC projects from beginning to end in Petropars.

• Helped in developing Project Management Plans in MAPNA and Petropars.

• Developed projects time schedules and supervised the updating.

• Designed daily, weekly, and management reports for projects.

• Identified and implemented programs to compensate delays in projects.

• Actively attended in various meetings with both client and contractor. CAREER OBJECTIVE

Staying active in project management team and keeping myself update with newest techniques and tools. PERSONALITY

Serious at work, do my best to understand the job completely and do it as perfect as possible (excellence delivering) Honest, stand for what I do. When facing with job issues and experiencing problems in the job I count on my effort as well as my colleagues. I am bilingual and able to read, write, speak and communicate both in English and Farsi. Aggressive in following project goals and team rules but meanwhile respectful with all team members and colleagues.